Hobie 30113 User manual

Type
User manual
# 30113 Page 1 of 1
#30113 - MAST FLOAT
1) Assemble all parts onto shaft.
2) Place lower end of shaft against mast.
3) PVC pipe keeps the float above the masthead. For
17, 18, 20 & 21 installation... trim to 2”.
4) Drills needed: 15/64” when using caps.
3/16” for rivets only.
NOTE: Bearing must be placed - open side towards
center of float.
H-14 / H-16 H-17 / H-18 / H-20 / H-21
Position as shown.
Be sure Float has
complete 360 degree
rotation.
Drill mast and rivet
single (long rivet with
cap) to hold location.
Bend eye straps to
conform to your mast
curve.
Rivet lower strap (use
shorter rivets and seal
caps).
Rivet upper strap
(without seal caps) (use
long rivets for 17, 18, 20
& 21), this is above
seal.
  • Page 1 1

Hobie 30113 User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI