Gaggia Ruby Pro PRO 1G Pour Over Operating instructions

Type
Operating instructions
The installaon area is clean and clear of dust and tools. It is not located in an acve construcon zone.
The counter accommodates the machine size and weight (check selected model).
An access hole has been pre-drilled in the counter for drainage and power in accordance with model installaon template.
Hole in counter is ed with a collar to protect electrical cord, water line & drain tube.
Machine can safely be installed with minimum clearances of 3'' from the back wall, 4'' on each side and 12'' on top.
GENERAL MACHINE ENVIRONMENT
WATER SPECIFICATIONS
ELECTRICAL REQUIREMENTS
pH range is between 6.5 & 7.5.
Hardness (TDS) is between 89 PPM & 142 PPM.
Power outlet receptacle is NEMA 5-15R.
Dedicated electrical circuit meets the selected Ruby model power requirements.
No extension cord or power strip on the circuit.
Model
PRO 1G
Pour Over Direct Connecon
Dimensions (WxHxD) 16.8” x 14.5” x 20.2’’
Weight 55 lb
Power Cord Plug NEMA 5-15P
Max Absorbed Power 1640 W
Voltage & Frequency 120 V / 60 Hz
Water Network
Pressure is between 2.9 PSI & 72.5 PSI.
The water network provides cold, drinkable tap water.
Dedicated 3/8” diameter water line.
Shuto valve with a 3/8” G male pipe ng on machine’s end.
Machine water line is equipped with soness/ltraon system
and descaling device.
HIGHLY RECOMMENDED: Connecon to a oor drain in accordance with local health code.
INSTALLATION CHECKLIST
Ruby Pro Installation Checklist | 2022-10
Evoca North America
2355, avenue Dalton, Québec (Québec) G1P 3S3 Canada
T: 800-561-6162 F: 800-463-2739
www.evocagroupna.com
  • Page 1 1

Gaggia Ruby Pro PRO 1G Pour Over Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI