Steelcase International Base Power-In (5 Wire) into a Series 9000 Panel Assembly Instructions

  • Hello! I am an AI chatbot trained to assist you with the Steelcase International Base Power-In (5 Wire) into a Series 9000 Panel Assembly Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Steelcase, Inc.
Grand Rapids, MI 49501
U.S.A.
1-888-783-3522
Tools
Assembly Directions Printed In U.S.A.
REV
93-9501296 A
Page 1 of 4
International Base Power-In Into A Series 9000® Structural
Panel Equipped With An International Powerway Assembly
Style #98648 - I
All electrical installations should be done by a qualified person in
accordance with codes and regulations applicable at the installation site.
Assembly Directions
93-9501296 REV APage
2 of 4
1. Remove base trim by pushing down on steel tabs at the bottom extreme ends (in area of glides) and
lifting up and out. Remove ground wire connector from base trim tab.
2. Remove screw and cover plate from base trim.
Cover Plate
Base Trim
Ground Wire
Connector
Base Trim Tab
Apply Pressure
To Steel Tabs
Assembly Directions
93-9501296 REV APage
3 of 4
3. Insert conduit through square hole in base trim. Position and secure cover plate tab to the base trim tab
with (1) screw and bend tab over cover plate.
Conduit
Bend Trim Tab
over Cover Plate
Base Trim Tab
Cover Plate Tab
and Screw
Assembly Directions
93-9501296 REV APage
4 of 4
4. Insert base power-in connector into international powerway assembly. Reconnect ground wire connector
back onto base trim tab. Replace base trim by reversing Step 1.
Base Power-In
Connector
International Powerway
Assembly
Ground Wire
Connector
NOTE: Base power-in connector
must be completely inserted into
international powerway assembly.
/