ALL-O-MATIC TK-1000 Hardware Installation Instructions

  • Hello! I am an AI chatbot trained to assist you with the ALL-O-MATIC TK-1000 Hardware Installation Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
®
TK-1000 TANDEM GATE HARDWARE
INSTALLATION INSTRUCTIONS
If this is the first time attempting a tandem gate installation
please consult ALL-O-MATIC or someone with tandem gate
installation experience. These instructions are guidelines only,
every Tandem Gate installation is unique and has its own unique
measurements. The TK-1000 Tandem Kit was designed to work
with ALL-O-MATIC slide gate operators slowed down to about
50% speed. Please make sure to request a Slowed Tandem
Gate Setup on all gate operators that will be used with the ALL-
O-MATIC Tandem Gate Hardware Kit.
Note: TK-1000 works best with ALL-O-MATIC DC Slide Gate
Operators (SL-100DC and SL-150DC) operators must be slowed
down.
WARNING!
4’’
4’’
IDLER ON FIRST PANEL
IDLER ON THE POST
VIEW FROM OUTSIDE PROPERTY
POST
FENCE LINE
FIRST PANEL
FIRST PANEL
SECOND PANEL
SECOND PANEL
TRACKS
OPERATOR
24’’
8’’
1’’
3’’
TOP VIEW
OUTSIDE
INSIDE
When installing chain, make sure the two gate panels are in the fully closed position. This is to
assured proper gate operation once driven by the gate operator.
1’’
1
2
/
’’
7
’’
1
2
/
15
DRIVEWAY
REAR SPACE
REAR SPACE =1/2 OF DRIVEWAY + 39’
DRIVEWAY =2/3 OF TOTAL LENGTH - 26’’
FIRST PANEL=1/2 OF DRIVEWAY+ 15’
SECOND PANEL=1/2 OF DRIVEWAY+ 7’’
NOTE: Slow down operator
by half the speed on every
installation to maintain 12’’
per second on second panel.
TOTAL LENGHT
TOP VIEW
OUTSIDE
INSIDE
POST
FENCE LINE
FIRST PANEL
SECOND PANEL
TRACKS
OPERATOR
3’’
3’’
/