YASINU YNAB517MB, YNAB517BN, YNAB517CH Installation guide

  • Hello! I've reviewed the installation instructions for the Bathtub Faucet MB/BN/BG/CH/ORB. This document guides you through the process of installing your new freestanding faucet, including steps for mounting, connecting water lines, and testing for leaks. I'm here to help answer any questions you have about this installation process.
  • What is the first step in installing the facet?
    What should you do after connecting the water lines?
    How long should you allow the water to run during the final test?
8.Finish your installstion by attaching the
hand shower to the using the hand shower
hose.Hand tighten each connection firmly.
/