SCE SCE-GA18X50, SCE-GA14X1, SCE-GA14X75 Installation Information

  • I have analyzed the provided document, which contains detailed installation instructions for a door strip gasket. It outlines the surface preparation, gasket application, and adhesion requirements. I am ready to answer any questions you may have about this installation process.
  • What is the first step in installing the strip gasket?
    What is the minimum dwell time for full adhesion?
    Where is the first gasket applied?
.750 ± 0.060 offset from inside
of door bend on hinge side only
Apply strip gasket tightly to the
inside of these (3) door bends
1. Thoroughly clean sealing surface of Stainless Steel or Powder Coated enclosure
with a 50/50 isopropyl (rubbing alcohol) water mixture, or similar cleaning
solvent and wipe dry.
2. Apply rm pressure to the entire bond line for adhesion. For full adhesion,
minimum dwell time of 72 hours at 65F or greater.
3. Apply the gasket to the top of the door rst (A) from corner to corner.
4. Apply the left (B) and right side (C) gasket tightly against the top gasket and to
the bottom of door as shown, locating the hinge side gasket.
5. Apply bottom gasket (D) tightly against right and left gasket.
Door interior view
(Gasket Application)
Door 3/4 view
strip-gasket-installation.pdf
A
B
D
C
Strip Gasket Installation Instructions
/