Installation Manual
H3C S7502 Ethernet Switch Chapter 5 System Commissioning
5-6
Caution:
Before powering on the switch, confirm where the power switch of the equipment room
is located, so that you will be able to power off in case of accidence.
5.2.2 Power-on
z Turn on the power supply of the switch.
z Power on the switch.
5.2.3 Check after Power-on (Recommended)
You are recommended to check as follows after powering on the switch to ensure the
configurations thereafter.
z After a switch is powered on, the heat dissipation system starts working. You can
hear the noise as the fan rotates and feel air flow out from the vent.
z Check if any system indicator on the SRPU indicates abnormal condition.
5.2.4 Starting the Interface
As the switch is started, the configuration terminal will yield the following output:
Starting......
RAM Line....OK
System is booting................
******************************************
* *
* H3C S7502 BOOTROM, Version 530 *
* *
******************************************
Copyright(c) 2004-2007 Hangzhou H3C Tech. Co., Ltd.
Creation date : Apr 20 2007, 14:48:52
CPU type : MPC8245
CPU Clock Speed : 300Mhz
BUS Clock Speed : 33Mhz
BOOT_FLASH type : M29W040B
Flash Size : 32MB
Memory Size : 256MB
S7502 main board self testing................................
SDRAM Data lines Selftest.................................OK!
SDRAM Address lines Selftest..............................OK!