Metro L01-615 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Metro L01-615 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
INSTRUCTIONS FOR USE
Double Sided Wood Bulk Storage Lionville Fixtures
© 2017 InterMetro Industries Corporation, Wilkes-Barre, PA 18705
L01-615 07/2017
DESCRIPTION
Double Sided Wood Bulk Storage This instruction sheet covers assembly procedure for Double WBS units.
2 L01-615
Double Sided Wood Bulk Storage
2
A B
Side Panel
(x2)
Insert
Connecting Bolts
(x18)
Connecting Bolts
(TOP)
(TOP)
(BOTTOM)
(BOTTOM)
Tools Required
Phillip's #2 Screw Driver
Flat Head Screw Driver
Bubble Level
Optional Cordless Drill with Bits
Hardware List
The face of the laminated surface or side should be downwards.
Unnished surface should face outwards.
NOTE: Notice Cam to Bolt.
Install
Top Panel
COMPONENTS
Leveler
with Screws
(x4)
Nylon Cam
(x18)
Shelves
(x10)
Bottom Panel
(x1)
Side Panel
(x2)
Kick Plate
(x3)
Center Divider
(x1)
Connecting Bolt
(x18)
#8 x 3/4"
Screws
(x12)
Angle Bracket
(x3)
Top Panel
(x1)
3L01-615
Double Sided Wood Bulk Storage
C
E
D
Top Panel
Install
Bottom Panel
Bottom Panel
Connecting
Bolts
(TOP)
(BOTTOM)
(BOTTOM)
NOTE: Turn the Top Panel nylon cam 1/2
turn to lock together.
NOTE: Turn the Bottom Panel nylon cam
1/2 turn to lock together.
NOTE: Turn the Kick Plates nylon cam 1/2
turn to lock together.
F
Install
Kick Plates
(x3)
Finished
Side Out
Finished
Side
G
Center Divider
NOTE: Slide Center Divider
H
Install
Fixed Shelves
(x2)
NOTE: Turn the Shelf nylon cam 1/2
turn to lock together.
4 L01-615
Double Sided Wood Bulk Storage
L01-615 07/2017
US/Can: 1.800.992.1776
Corporate Headquarters (US): 1.570.825.2741
For Inquiries Outside of the U.S. and Canada, Visit www.metro.com/contactus
www.metro.com
WBS - Wood Bulk Storage - Cases
Index # Part Number Description
1 FXLCDBL1624 Laminate Case, Double-Sided, 16"Dx24"Wx84"H
2 FXLCDBL1630 Laminate Case, Double-Sided, 16"Dx30"Wx84"H
3 FXLCDBL1636 Laminate Case, Double-Sided, 16"Dx36"Wx84"H
4 FXLCDBL1642 Laminate Case, Double-Sided, 16"Dx42"Wx84"H
5 FXLCDBL1648 Laminate Case, Double-Sided, 16"Dx48"Wx84"H
6 FXLCDBL2424 Laminate Case, Double-Sided, 24"Dx24"Wx84"H
7 FXLCDBL2430 Laminate Case, Double-Sided, 24"Dx30"Wx84"H
8 FXLCDBL2436 Laminate Case, Double-Sided, 24"Dx36"Wx84"H
9 FXLCDBL2442 Laminate Case, Double-Sided, 24"Dx42"Wx84"H
10 FXLCDBL2448 Laminate Case, Double-Sided, 24"Dx48"Wx84"H
I
J
K ML
Install Leveler
(x4)
Angle
Bracket
(x3)
Screws
(x12)
NOTE: 2 people required. Use
bubble level and allen wrench to
level the WBS unit.
NOTE: Use the hole plugs (provided) to
cover holes after leveling.
NOTE: Repeat step "A". Turn the Side Panel nylon
cam 1/2 turn to lock together.
Install
Side Panel
/