PN616C

Panduit PN616C User manual

  • Hello! I am an AI chatbot trained to assist you with the Panduit PN616C User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
  • What is the maximum capacity of the raceway channel?
    What type of screws are provided with the raceway?
    What is the recommended drill bit size for the concrete screws?
    Can the raceway be secured using adhesive strips?
    What is the maximum distance between screws when mounting the raceway?
    How far apart should the base joints and cover coupling joints be staggered?
    What is the maximum allowable distance between the base and cover when installing the end cap?
    What is the maximum height of the raceway channel?
    What is the maximum length of the raceway channel?
    What is the warranty period for the raceway channel?
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
The mounting hardware used to secure
the raceway shall be appropriate for the
mounting surface.
Screws provided with raceway are
intended for installation on a concrete
surface.
NOTES:
An adhesive strip may serve only as a positioning aid during the installation process. The raceway shall be secured by mechanical
fastening means.
Holes for mounting raceway and associated fittings should be predrilled into infrastructure prior to the installation of the mounting
hardware.
A 5/32" concrete drill bit is needed for the provided concrete screws.
Above Floor Raceway 4-Channel Standard Product
Part Number(s): AFR4BC**%, AFR4RA**, AFR4TRT70**, AFR4JB2S**, AFR4EC**, AFR4CC**,
AFR4TBLG**, AFR4WTR**
14 12 10
0.111 0.13 0.164
Max Max Max Spec Max Spec Max Spec Max
40% 60% 40% 60% 40% 60%
OuterChannels(withscrewsinstalled) A 211510342334
InnerChannels B 241711352335
DataGradeCables
Cat6A
Fill
Cat6A(SD)
Fill
0.24
24AWG 24AWG
0.3
24AWG
Cat6
Fill
0.24
ElectricalCables
THN/THWN/T90
Fill
ULTempRiseTest
RacewayChannel SeeFig.
Page 1 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
BASE & COVER
0.3"
Screw to be no closer than
0.3" to inside latching rib
Space approximately 24"
3" maximum
COUPLER
Ensure coupler is fully
engaged with cover
Stagger base
joint and cover
coupling joint to
strengthen
assembly.
2 2a 3
1 2 2a 3 4
1
where ** denotes a color code and %
denotes a length in feet
RIGHT ANGLE
1
3 4
5
2
Page 2 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
TRANSITION TO T70
1
2345
2
END CAP
1
Ensure end cap and cover are fully engaged as shown. 0.3" is maxi-
mum allowable distance base can extend beyond cover when installing
cap.
0.3"
1a
Page 3 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
JUNCTION BOX
2
Ensure end cap and
coupler(s) connect to
junction box cover as
shown [8 places]
1a
1
3
Note: Junction Box can be assembled between two raceway paths with the use of two coupler fittings.
End cap installation shown as reference.
1" (25.4 mm)
Rectangular
Breakout 1/2" (12.7 mm)
Rectangular
Breakout
3/4" (19.05 mm)
Page 4 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
POWER/DATA APPLICATION DATA APPLICATION POWER APPLICATION 4
5 6
BREAKOUTS FOR CONDUIT APPLICATIONS
Page 5 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
GREENFIELD APPLICATIONS - NEW CONSTRUCTION
5/8
1/2
1/2"drywall application 5/8"drywall application
Stud Stud
1
Determine if you will use 1/2" or 5/8" drywall. Orient
standoff as shown for desired application.
2
Secure base to sole board and route
cables and wiring as desired. Do not
overtighten screws as flooring installa-
tion may require adjustments.
3
Adjust wall transition fitting base height
during flooring installation. After drywall
and flooring have been installed, secure
transition fitting base to the floor using
appropriate hardware.
Continue with Step 4 of Brownfield appli-
cation instructions.
**Only use standoff for Greenfield
applications**
If installing into existing infrastructure, con-
tinue to Brownfield application instructions.
WALL TRANSITION
BROWNFIELD APPLICATIONS - EXISTING INFRASTRUCTURE
1-1/2
3-3/4”
6-1/2”
123
Cut hole in drywall between studs to the
dimensions shown.
6
Raceway
Cover
5
4
Raceway
Base
8
7
Page 6 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
TABLE LEG
3-1/4
MEASURE
TABL E
HEIGHT
Raceway
Cover
1
Center of table leg transition fitting will sit approximately 3-1/4" from the edge of the raceway cover.
Route cables prior to installing the raceway cover.
NOTE: Desired hole in table should be offset from table leg center to accommodate proper
mounting of table leg.
T
O•
P
Made in PVC
03
USA
FT4
SUR FACE NONME TALLIC R ACE WA Y
68YL
600V MAX
2
Measure the height
from the floor to the
underside of the table.
Channel should be
between 3-1/2" to 4"
shorter than the mea-
sured height. If neces-
sary, cut channel from
bottom edge to accom-
modate.
INSTALLATION BETWEEN 2 RACEWAY CHANNELS
Page 7 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
3
Mounting
Bracket
Top of
Channel
Top Hole of
Channel
4
#10-32 Hex Nuts
#10-32 x 1" Screws
55A
6
Secure mounting bracket to top of channel using provided hardware.
Use the top hole of the channel for assembly. Do not fully tighten the
mounting bracket at this time.
Ensure couplers connect to bottom transition
boots as shown.
[4 Places]
Page 8 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
Capture Ledge
Bottom Edge of
Channel
Transition
Boot
7
#8-32 x 3/4"
Wood
Screws
[4 Places]
8
#10-32 Hex
Nuts
[2 Places]
#10-32 x 3/8"
Hex Screws
[2 Places]
Cover
[2 Places]
9
Stepped Flange
[2 Places] Transition Boot
Latch
[4 Places]
Top Transition Boot
[2 Places]
Mounting Bracket
10
Set bottom edge of channel on capture ledge of installed
transition boot. Connect second transition boot to the first.
Ensure channel is level.Secure mounting bracket to underside of table
using provided hardware. Fully tighten mounting bracket screws to
secure channel in place.
Route cables prior to installing covers. Covers are tamper-proof
and are not intended for easy removal.
If added stiffness is desired, secure bottom of channel using pro-
vided hardware in the lowermost holes of the channel.
Assemble top transition boots to each other. Transition boot latches will
mount to the stepped flanges of the mounting bracket.
Page 9 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
11
Page 10 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
INSTALLATION AS STAND ALONE OR WITH SINGLE SIDE RACEWAY CHANNEL
NOTE: For single side raceway application; above floor raceway should be mounted prior to table leg installation.
Center of table leg will sit approximately 3-1/4" from the edge of the raceway cover. Route cables prior to
installing the raceway cover.
NOTE: Desired hole in table should be offset from table leg center to accommodate proper mounting of table leg.
Page 11 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
T
O•
P
Made in PVC
03
USA
FT4
SUR F AC E N ON M E T AL LI C RACEWAY
68YL
600V MAX
Measure the height from
the floor to the underside
of the table. Channel
should be between 3-1/2"
and 4" shorter than mea-
sured height. If necessary,
cut channel from bottom
edge to accommodate.
2
MEASURE
TA B L E
HEIGHT
1
NOTE: Desired hole in table should be offset from table leg center to accommodate proper mounting of table leg.
Mounting
Bracket
Top of
Channel
Top Hole of
Channel
3A
Bottom Hole
of Channel
[2 Places]
Bottom of
Channel
Mounting
Bracket
3B
Page 12 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
Secure mounting brackets to top and bottom of channel using provided
hardware. Use the holes closest to the ends of the channel for assem-
bly. Do not fully tighten the mounting bracket at this time.
Pre-drill holes in infrastructure if necessary. Secure
bottom mounting bracket to floor with proper hard-
ware. (Concrete screws provided)
Ensure channel is level. Secure top mounting
bracket to underside of table using provided
hardware.
Transition Boot Latch
Ensure end cap(s) or
coupler(s) connect to
bottom transition
boots as shown
[4 places]
7
7A
6
#8-32 x 3/4" Wood
Screws [4 Places]
5
4#10-32 Hex
Nuts
#10-32 x 1" Screws
Page 13 of 15
For Technical Support: www.panduit.com
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
Capture
Ledge
Stepped
Flange
8
Bottom Edge of
Channel
Bottom
Transition
Boots
9
Covers
[2 Places]
Assemble bottom transition boots together. Transition boot
latches (shown in step 7) will mount to stepped flanges of the
mounting brackets. Place bottom of channel on top of cap-
ture ledge of transition boots.
Tighten all mounting bracket screws to the channel at this
time.
Route cables prior to installing covers. Covers are tamper
proof and are not intended for easy removal.
Stepped
Flange
[2 Places]
Transition
Boot
Latch
[4 Places]
Assemble top transition
boots to each other. Tran-
sition boot latches will
mount to the stepped
flanges of the mounting
bracket.
10
Page 14 of 15
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2022 PN616C
E-mail:
techsupport@panduit.com
Phone:
866-405-6654
For Instructions in Local Languages
and Technical Support:
www.panduit.com www.panduit.com
11
Page 15 of 15
/