e-conolight C-WP-A-FCA C-Lite Full Cutoff LED Wall Pack

e-conolight e-conolight C-WP-A-FCA C-Lite Full Cutoff LED Wall Pack, C-WP-A-FCA C-Lite Full Cutoff LED Wall Pack User manual

  • Hello! I am an AI chatbot trained to assist you with the e-conolight e-conolight C-WP-A-FCA C-Lite Full Cutoff LED Wall Pack User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Document: Date
Created By:
LPN00674X0001A4_A 3-21-2022
TMT
INSTALLATION INSTRUCTIONS
PHOTOCELL OPTIONS
www.e-conolight.com | 888.243.9445 | FAX: 262.504.5409
Locating knockout in an adjustable tter:
a. Remove wiring compartment cover from adjustable tter
using Phillips screwdriver.
b. Using a hammer and a punch, remove knockout of wiring
compartment cover. See Figure 1.
c. See photocontrol installations. (On backside)
d.
LOCATING KNOCKOUT
Wiring Compartment
Cover
Knockout
Adjustable Fitter
Photocontrol
FIGURE 1
FIGURE 1
1. Refer to mounting diagrams, Figure 2, for correct xture series
and drill a 11/16” (17mm) hole in location indicated. Make sure the
photocell will t properly before drilling.
2. See photocontrol installation
WALLPACKS WITHOUT KNOCKOUTS
MOUNTING DIAGRAMS
Photocell
E-WRT
Mounting Box
E-WFT05
Photocell
Fixture Housing
Photocell
C-WP-B-TR
Mounting Box
Photocell
C-WP-C-TR
Mounting Box
Photocell
C-WP-A-TWP
Mounting Box
Photocell
C-WP-A-FCA
Mounting Box
Photocell
C-WP-B-RDC
Mounting Box
Photocell
E-WFP
(Make Sure Photocell
Clears Reector)
Mounting Box
Photocell
E-WRC
(Mount Photocell in Lens
Assembly NOT Mounting Box)
Lens Assembly
Photocell
C-WP-D-TR
Mounting Box
FIGURE 2
(Flat gasket in 1000W,
208-277V xtures)
FIGURE 3
1. Wire according to Single Phase Voltage or Phase to Phase Voltage.
WIRING
Ballast
or
Driver
Neutral
(COM)
Neutral
(COM)
Hot
Voltage Red
White
Black (COM)
Hot Hot
Voltage Red
White
Black
Ballast
or
Driver
Single Phase Voltage
(120/277V)”
Phase to Phase Voltage
(208/240V
FIGURE 4 FIGURE 5
1. Remove nut from photocell, leave o-ring. See Figure 3.
2. Slide photocell through opening.
3. Thread nut on to threaded nipple of photocontrol and tighten to
ensure waterproof seal.
4. Wire photocontrol according to Figure 4 if wiring phase to neutral
or Figure 5 if wiring phase to phase. In all cases make sure the
photocontrol voltage is rated for the supply voltage.
5. Reinstall any parts removed during the installation of the
photocontrol.
PHOTOCONTROL INSTALLATION
/