Premier Mounts SYM-UR-CM User guide

  • Hello! I've reviewed the Installation Guide for the PREMIER MOUNTS SYM UR-CM mount. This document provides detailed, step-by-step instructions, using M8 and M10 hardware, on how to securely install the mount. I'm ready to answer any questions you might have about the installation process or the components involved.
  • What is the first step in the installation?
    How do you level the mount if the ceiling is not leveled?
    What hardware is used to secure the ceiling plate to the ceiling?
Installation Guide
SYM-UR-CM
Page 1
INCLUDES:
9500349 v1.0
publ. 02/25/20
x2
M10 Lock Nut
x2 x4
M10 Washer
x1
Ceiling Plate
x4
M8 x 12mm Set
Screw
x4
M8 x 25mm Flat
Socket
M10 x 45mm
Hex Bolt
x1
Adjustment
Plate
Remove the side strips from the extrusion upright bar.
(4) M8 x 25mm
Flat Socket
1
3
5
2
4
6
M10 Lock Nut
M10 Washer
M10 x 45mm
Hex Bolt
(4) M8 x 12mm
Set Screw
side strips after bolting to the ceiling plate
Secure the Ceiling Plate to the ceiling using commercially
available hardware.
If the ceiling is not leveled, install the M8 x 12mm set
screws to finalize leveling adjustment
Leveling
premiermounts.com | p. 800.368.9700 | e. [email protected]
/