WarmlyYours ERT120-1.5x18 Circuit Check Instructions

  • Hello! I am an AI chatbot trained to assist you with the WarmlyYours ERT120-1.5x18 Circuit Check Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
SHEATH
CORE
CORE
Black Inner Lead
Yellow (120V)
or Red (240V)
Inner Lead
Copper
Ground Sheath
BLACK
GREEN
(Sheath)
RED
SHEATH
CORE
CORE
Black Inner Lead
Yellow (120V)
or Red (240V)
Inner Lead
Copper
Ground Sheath
BLACK
GREEN
(Sheath)
RED
Paperclip
TESTING THE CIRCUIT CHECK
1. LAY OUT THE WARMLYYOURS WARMING SYSTEM ROLL(S)
Lay out the roll(s) in accordance with the design layout and instructions provided by WarmlyYours.
2. TEST THE CIRCUIT CHECK DEVICE
1
Before connecting any wires, install the batteries in the device and turn it "on" and "off" to test
the alarm. The unit should alarm when disconnected and powered “on”.
After confirming that the alarm is in good working order, connect the wires as follows:
- Connect Black inner conductor core wire to the Black terminal.
- Connect 2nd inner conductor core wire to the Red terminal.
THERE ARE TWO WAYS OF DOING THE NEXT STEP:
2.1 Split the ground sheath in two, connect one half of the ground sheath to the green terminal,
turn on the Circuit Check and touch the other half of the ground shealth to one of the inner
conductor wires;
2.2 Install the entire ground into the green terminal. Turn on unit and use a paper clip as a bridge
between the ground wire and either one of the inner conductors.
Either method should activate the alarm. If the Circuit Check does not pass all these tests,
please call WarmlyYours Customer Service at (800) 875-5285.
Please turn over to view detailed illustrations for wiring
Tempzone to the Circuit Check
Note
1
: This device is NOT an Ohm meter. WarmlyYours requires that the roll be tested before, during and after
installation with a Digital Ohm meter.
Circuit Check Device
Testing and Installation
Installation Support •(800) 875-5285 • www.WarmlyYours.com
Wiring Tempzone to Circuit Check
SHEATH
CORE
CORE
Black Inner Lead
Yellow (120V)
or Red (240V)
Inner Lead
Copper
Ground Sheath
ON OFF
BLACK
GREEN
(Sheath)
RED
Wire Construction
BRAIDED GROUND SHEATH
COLD LEAD
BLACK WIRE
RED 240V
or
YELLOW 120V
3. ATTACH THE CIRCUIT CHECK TO THE HEATING CABLE/MAT AND PROCEED TO INSTALL FLOORING
4. IF THE CIRCUIT CHECK ALARM SOUNDS, STOP!
The alarm sounding indicates a short in the circuit or break in the system. Check the trouble
shooting guide in the WarmlyYours installation manual or call 24/7 Installation Support at
(800) 875-5285.
WarmlyYours can ship a splice kit to repair the short. Alternatively, the wire may be repaired by
an electrician. Please see the wire repair document on www.warmlyyours.com, or call us 24/7
at (800) 875-5285.
Circuit Check Device
Testing and Installation
Installation Support •(800) 875-5285 • www.WarmlyYours.com
/