Dormakaba RCI 909 Rocker Switch Installation guide

Type
Installation guide
© 2022 dormakaba Canada Inc.
www.dormakaba.us • Phone: 1.800.265.6630 • Fax: 1.800.482.9795 • E-mail: sales_RCI@dormakaba.comIS909
PCN2208
R11-22GR
INSTALLATION
RCI 909
SURFACE AND FLUSH MOUNT ROCKER SWITCHES
909 SURFACE MOUNT INSTRUCTIONS
1. Remove decorative bezel around switch.
Optional: * To convert the momentary switch
provided to maintained switch mode, carefully
remove the spring located under the rocker
switch with a small screwdriver or pliers.
2. Mount switch base in desired location.
3. Connect wires under appropriate terminals
(Fig. 1).
4. Replace decorative bezel.
Fig. 2
909 FLUSH MOUNT INSTRUCTIONS
1. Pry off decorative bezel around switch and
remove toggle.
2. Cut a 2-1/4” x 1-1/4” hole in the drywall.
3. Connect wires under appropriate terminals
(Fig. 2).
4. Insert switch into hole. Tighten the two metal
slot screws, until switch is secure.
5. Replace toggle and decorative bezel.
Fig. 1
10A
10A 250V
250V
C - Power In
N/C Contact
Power Out
N/O Contact
Power Out
Switch Mode Switch Conguration Switch Rating Standard Finish
Momentary Action * SPDT N/O or N/C 10A @250V Beige (plastic)
NOTE: Specications are subject to change without notice.
N/C - Normally Closed, N/O - Normally Open, C - Common
* Surface mounted switches only may be converted to Maintained Switch Mode.
C
Power In
L1
L2
L3
N/O Contact - Power Out
N/C Contact - Power Out
IS909_R1122.indd 1 11/3/2022 11:57:04 AM
  • Page 1 1

Dormakaba RCI 909 Rocker Switch Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI