Route spliced 900 µm pigtail.
Clean and install connector.
Additional devices may be installed
splitters or lters.
Optional demarcation cover and
optional security screw.
Insert additional SC or LC Adapters.
Install with metal clips in
demarcation chamber.
Clean and install premise drop
connector
Attach foam and tiewrap to secure
premise drops.
Close and Secure NID Optional screw QR code for additional information
Slide Ground into place to engage
into base
OptiNID
®
Duo Quick Start Installation Instructions
25 inches
Splice
11 inches
(min.)
22 inches
(max.)
Drop Cable
Buffer Tube
250/900 μm
2
www.AFLglobal.com
©2019, AFL, all rights reserved. INS-01007, Revision A, 8.22.19
Specications are subject to change without notice.