Hagerco 9878 Series - Extra Heavy Duty - Aluminum Box Track - and Hardware Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Hagerco 9878 Series - Extra Heavy Duty - Aluminum Box Track - and Hardware Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Sliding Door Hardware 9878 - Pocket
Installation Instructions
I-SD00330
Rev 1, Rev Date: 7/13/17 Component Number (If required) Page 1 of 2
Hager Companies 139 Victor Street, St. Louis, MO 63104 (800) 325-9995 www.hagerco.com
1 PREPARE OPENING
OPENING HEIGHT MAX = DOOR HEIGHT + 3-1/2
OPENING HEIGHT MIN = DOOR HEIGHT + 2-1/4
CONTENTS
9878
1. TRACK (9801)
2. CARRIER (9827)
3. QUICK RELEASE PLATE (9610)
4. DOOR GUIDE SET (9883)
5. BUMPER KIT (9881)
6. PULL
(SOLD SEPERATLY)
7. #8 X 3/4” PPHS
8. #8 X 1-1/2” PPHS
9. #8 X 5/8” TPHS
1
2
2
1
1
1
1
16
2
3.
4.
1.
2.
6.
5.
8.
9.
Sliding Door Hardware 9878 - Pocket
Installation Instructions
I-SD00330
Rev 1, Rev Date: 7/13/17 Component Number (If required) Page 2 of 2
Hager Companies 139 Victor Street, St. Louis, MO 63104 (800) 325-9995 www.hagerco.com
2 INSTALL TRACK AND HARDWARE
Center track in opening, Secure with (#8 X 1-1/2”) screws
Leave a 1” gap between opening end of track and door
frame to allow for removal of carriers
Center quick release plates on door thickness
Mount pocket plate edge 1” from pocket door edge
Mount opening plate edge 2-3/4” from opening door edge
Secure carriers onto door with (#8 X 1-1/2”) screws
Secure bumper centered on inside edge of door
3 HANG DOORS
4 ADJUST AND FINISH
Open quick release latches on brackets and slide door onto carriers
and close latches.
Adjust carriers so door is square with frame
Drill proportional sized hole to install pull
(OPTIONAL)
Install door guides outside of finished trim at base
of door.
Pocket end
Opening end
/