InOvate Technologies LT90 Installation guide

Type
Installation guide
In-O-Vate Technologies, Inc.
810 Saturn Street, Suite 21
Jupiter, Florida 33477 USA
www.dryer-ell.com
Toll Free (888) 443-7937
© 2008 (Rev. 03/08) 1053.INDD
In-O-Vate Technologies, Inc.
Instruction Sheet LT90
Assembly
1. Bend all the tabs almost straight up with a flat screwdriver.
2. Mate the two parts so that the screw holes line up.
3. Secure the flanges with five sheet metal screws.
4. Bend the tabs down and tape the joints along the flange.
Installation
1. When used as a replacement to the standard sectioned ell, the contractor
should net approximately 4.5 lineal feet of duct run. Engineering paperwork
available online, www.dryer-ell.com.
2. Arrow indicates airflow from dryer and provides for proper male and female
connections.
3. When used with the Model 4D “Down” Dryerbox®, cut and insert a 3” long
section of snaplock pipe to transition into port for adequate flex connection.
3” length
of pipe
Model
4D Dryerbox®
Model
4D
12” min.
Manufactured in the USA
US Patent 7,210,505
Makers of The Dryerbox®
  • Page 1 1

InOvate Technologies LT90 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI