InOvate Technologies LT90 Installation guide

  • Hello, I'm a chat assistant who has read the Instruction Sheet for In-O-Vate Technologies' LT90 Dryer Ell and 4D Dryerbox. I'm familiar with the assembly steps using tabs and screws, proper airflow direction, connection to a dryerbox, and other installation aspects. I'm ready to answer your questions about this product.
  • What is the first step in assembling the Dryer Ell?
    How many screws are needed to secure the flanges?
    How much duct run is achieved when used as a replacement?
    What is needed when using a Model 4D Down Dryerbox?
In-O-Vate Technologies, Inc.
810 Saturn Street, Suite 21
Jupiter, Florida 33477 USA
www.dryer-ell.com
Toll Free (888) 443-7937
© 2008 (Rev. 03/08) 1053.INDD
In-O-Vate Technologies, Inc.
Instruction Sheet LT90
Assembly
1. Bend all the tabs almost straight up with a flat screwdriver.
2. Mate the two parts so that the screw holes line up.
3. Secure the flanges with five sheet metal screws.
4. Bend the tabs down and tape the joints along the flange.
Installation
1. When used as a replacement to the standard sectioned ell, the contractor
should net approximately 4.5 lineal feet of duct run. Engineering paperwork
available online, www.dryer-ell.com.
2. Arrow indicates airflow from dryer and provides for proper male and female
connections.
3. When used with the Model 4D “Down” Dryerbox®, cut and insert a 3” long
section of snaplock pipe to transition into port for adequate flex connection.
3” length
of pipe
Model
4D Dryerbox®
Model
4D
12” min.
Manufactured in the USA
US Patent 7,210,505
Makers of The Dryerbox®
/