Cal-Royal 424 96 Inch Lockable Keyed Rectangular Steel Fire Exit Mullion, CAL-ROYAL 424 96 Inch Lockable Keyed Rectangular Steel Fire Exit Mullion Operating instructions

  • Hello! I've reviewed the installation instructions for the CAL-ROYAL 424 Mullion. The document covers the entire installation process, from securing the retainers to positioning the strike, and provides detailed measurements. I'm ready to assist you with any questions you have about its installation or specifications.
  • What is the standard height for the strike when using 9800 & 2200 exit devices?
    How many flat head machine screws are used to secure the top retainer?
    What should be done after the strike has been installed and adjusted?
BOTTOM RETAINER
TOP RETAINER
B
C
A
A
1. Secure bottom retainer onto
2. Measure and cut mullion , if
3. Attach top retainer onto top of
mullion and locking it using the set
screw before securing it with (4) four
screws on to the surface of the
door stop.
4. Lock mullion in place by tightening
set screws in bottom retainer .
5. Measure height of strike from
height for 9800 & 2200 exit devices.)
6. Drill and tap for strike.
7. Position and secure strike.
INSTALLATION INSTRUCTION FOR #424 MULLION
2”
3”
3-5/8”
4”
7/16”
2” 2”
3-1/4”
TOP RETAINER
3/4”
1-3/4”
3-9/16”
1-5/16”
2”
BOTTOM RETAINER
7/16“
3-1/4”
1-5/8”
2“
(4) 1/4-20
TAPPED HOLES
C BETWEEN DOORS
L
MULLION
CROSS SECTION
EXIT
DEVICE
BACKSET
"A"ET/STS PTB/PSBFLW/FSW
MAL/MSL
2200
5000
9800
9900
TRIM AND MULLION
MINIMUM CLEAR STILE REQUIREMENTS
3-1/4" 4-1/2" 5" 4-9/16
HORIZONTAL C
OF STRIKE SCREWS
L
424 MULLION
C OF MULLION
BACKSET
A” VERTICAL C OF
CHASSIS
9/16”
D
L
L
NOTES:
*Once the strike has been installed and adjusted, drill
and tap two (2) #10-24 round head machine screws
*When using door silencers on the frame decrease
by silencer height e.g. [ 9/16” less silencer height ]
* For “GLASS BEAD” shims, increase by the shim
height e.g. [9/16” plus shim height ]
D
D
A
C
B
4400 2-7/8"
DRWG. # EDG 4010 , 2022/08
/