IMPORTANT - ASSEMBLY INSTRUCTIONS
Tools required: Rubber mallet
AIS001
A
1 Fit plastic feet F to uprights A.
2 Assemble both ends first - A and B starting from
the top. For optimum clear entry allow 14 clear
holes between top shelf and 2nd shelf, 14 clear
between 2nd and 3rd shelf, this will leave
15 clear holes between 3rd and bottom shelf.
3 Tap together using rubber mallet.
4 Join both ends using front and rear beams C.
5 Add shelf supports D.
6 Add shelves E.
7 Fit plastic caps to uprights G.
ASSEMBLY - 4 shelf bay 1980mm high
We advise the use of protective
gloves and goggles, or eyeglasses
when assembling this product.
A
B
B
C
C
D
*
D
*
E
F
G
E
1 of per level up to 915mm wide
2 of per level up to 1220 mm wide
For bays of extra height and levels follow the above procedure, assembling both ends A & B
to give the best clear entry for your application.