TMI Products 1973-75 K5 Chevy Bed Rail Installation guide

Type
Installation guide
K-5 Bed Rail Caps
Install and pret before
Paint and nal assembly
A professional is recomened for
all TMI Products installs
Chevy K-5 1973-75
Tools needed:
PN 99-0147-000
QP 09-320 REV. 01
SOCKET
Step 1: First, is to set the side rails onto the bed. The side rails will t into
the factory removable cab holes. once the posts are in you can install
the nuts to the bed rail cap studs, this process is very similar to how the
factory cab installed. This will be repeated on the opposite side.
DO NOT fully tighten these nuts yet as there will be adjustment later.
Step 2: Using the drilling template provided. You will mark the location
for the drill holes onto the top of the tailgate. Once marked you will
drill the four (4) holes out with a / sized drill bit.
(NOTE: Diagram 2 is of the tailgate folded down.)
Step 3: Once the holes are drilled into the tailgate you can fasten the
tailgate cap down. You will start by tightening the nuts down by hand
then using a ratchet with an extension you will fasten it almost all the
way down. Leaving enough room for adjustment.
Step 4: Once both the side caps and the tail gate cap are lossely tted
close the tailgate carfully and adjust each part until they t as desired.
once they all t as desired you can tighten them all down into nal
postion.
(Template)
1.Drill
2.Ratchet
2
1
3
  • Page 1 1

TMI Products 1973-75 K5 Chevy Bed Rail Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI