Installation instructions
Glass ceramic hob Toptronic
Frameless, for flush installation
J976.123-0
28.10.09 ITH
2
Indications
䡲 These appliances are normally installed in stone claddings.
䡲 The work surface must be flat.
䡲 A cabinet unit with a width of at least 900 mm is recommended for the base unit.
䡲 The appliance is embedded in the recess machined by the manufacturer of the stone cladding (see the enclosed cementing
instructions). Use only good quality, fresh cementing compound (black silicon) which attains the required final strength and elasticity
after a curing period of 24 hours.
䡲 A cementing set and a special primer for non-absorbent cladding materials is obtainable (see «Accessories»).
Installing
1. Create the installation cut-out accurately.
– The mounting surface can be recessed by installing wood or stone bars or produced using the steel angle set (see
«Accessories»).
2. Prepare the installation cut-out and the appliance according to the information in the accompanying cementing-in instructions.
3. Insert the appliance symmetrically in the installation cut-out on the work surface.
4. Carefully cement the appliance in place and allow the silicon cement joints to dry for at least 24 hours.
5. Where necessary establish mains supply connection before inserting the appliance. The connection cable is not to touch the hot
parts of the metal tray under the cooking zones.
Installation
The distance from the appliance cut-out to flammable walls (left, right and rear) must be at least 55 mm. Parts such as partition
walls, reinforcing strips which protrude into the installation space under the cooking zone must be of non-flammable materials.
The distance between the underside of the appliance tray and any kitchen unit parts of flammable material must be at least
20 mm. When installed directly under a drawer and if the tray can be reached from below without tools, a protective guard must
be used. The thermal screen set (see «Accessories») is recommended.
The layout of the cooking zones on the integrated hob may differ from the illustrated hob!
The underside of the material between cut-outs front and rear is reinforced.
The width of material between cut-outs is determined by the producer of the
stone work surface.
The minimum material width can vary according to the property of the stone.
Type Corner radius Remark
GK45TEPSF
spec.
R = 14 For glas work surfaces
GK45TEPSF R = 5 For other work surfaces
Access to the appliance from below must be guaranteed over the entire cut-out surface. For servicing, the sheet metal tray
together with the built-in parts can be taken out from below. The covers to prevent accidental contact with live parts must
be removable by unscrewing.
383
883
43,5
886 ±1
Z
min. 30
900
386 ±1
min. 70
min. 70
Y
Y
min. 20
Y – Y
min. 82
(
869
)
(369)
R
R0–5
0
-1
0
-0,5
Cable length 1.7 m
Detail Z
Steel angle bonded or screw mounted
(for adhesive see «Accessories»)
Cut-out in side walls for
removal
Drawer/cabinet
8.5
8.5
8.5 ±0.5
8.5 ±0.5