ALFI BRAND RAIN2012-BSS Installation guide

Type
Installation guide

This manual is also suitable for

SHOWER HEAD INSTALLATION INSTRUCTION
Parts List
You Will Need The Following Tools
Ø6mm
Ax1
Bx1
Cx4
D1x4 D2x4
Ex4 Fx1
Template not included, create your own if needed.
According to drilling drawing sheet to (B) mark the 4 drilling positions ①, then use
the Ø6mm drill to drill holes on the wall according to the marked hole position.
Inset the plug(D2) into the hole, hold the fix base (C) use the tapping screw (D1)
through fix base(C) holes, tighten the tapping screw (D1) tighten the top shower
fixed bar(E) and the inlet hose (F) with the fix base (C)
D2
C
D1
E
F
B
Fixed the top shower with the top shower fixed bar (E) , then connect with the inlet
hose (F) .
The installation is completed.
E
A
F
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

ALFI BRAND RAIN2012-BSS Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI