2
Parts Breakdown
Symmons Industries, Inc. ■ 31 Brooks Drive ■ Braintree, MA 02184 ■ (800)796-6667 ■ Fax: (800)961-9621
©2013 Symmons Industries, Inc.
■
www.symmons.com
■
■
ZV-2094 REV 0 07/16/13
Tools Required for Installation
2 mm allen wrench
Phillips head
screwdriver
Toilet Paper Holder
Installation Guide
CD0306-443TP
WALL
REFERENCE
BACKING BOARD
NOT INCLUDED
ESCUTCHEON
MOUNTING PLATE
SCREWS,
WOOD #8 X 1”LG
ESCUTCHEON
TP HOLDER
POST, TP HOLDER
TP HOLDER
SCREWS,
8-32 X 5/16”LG PN HD
SCREW
SET
Install backing board ush with nished
wall.
Center and level mounting plate on backing
board, then fasten screws to backing board.
Place escutcheon over mounting plate, then
attach post to escutcheon with screws. Slide
TP holder onto post and fasten by tightening
set screw.
1
2
3