Posh 1703112 Installation guide

Type
Installation guide

This manual is also suitable for

Plumbers, please ensure a copy of the installation
instruction is left with the end user for future reference.
of 06
Posh - Solus Freestanding Baths With/Without Overflow of 02
Installation Instructions
A B
A B
Page 1 of 2
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference.
Roca Inspira Round Above Counter Basin
370mm x 370mm
Plumbers, please ensure a copy of the installation instructions
is left with the end user for future reference
169
140
ø370
150
I
610
795
870
169
140
150
I
610
795
870
150
140
169
ø370
ø35
ø35
425 min
60 min
230 min
155 min
230 min
ø120
1 2 3 4
1
2
INSTALLATION INSTRUCTIONS
A3275L0
Ø120
A32768J/
[mm]
60 min.
Ø35
230 min.
170
425 min. 485 min.
170 min. 1 2 3 4
1
2
SAP - 1304517 - c
A3275L1
100mm
Jigsaw
Roca Inspira Round Above Counter Basin
370mm x 370mm
Installation Instructions
Roca Inspira Light Above Counter Basin 370mm
Disclaimer: Products in this specification manual must by regulation be installed by licensed and
registered trade people. The manufacturer/distributor reserves the right to vary specifications or
delete models from their range without prior notification. Dimensions are nominal measurements only.
Dimensions and set-outs listed are correct at time of publication however the manufacturer/distributor
takes no responsibility for printing errors.
Published 06/07/2021
Specification Sheet
Roca Inspira Square Above Counter Basin
370mm x 370mm Matte White
Dimensions are nominal measurements only.
To see the complete Roca range go to
www.reece.com.au
SPECIFICATIONS
Recommended Use Domestic, Hotel & Commercial
Basin Colour White
Basin Finish Matte
Material FINECERAMIC®
Mounting Countertop
Overflow Configuration No Overflow
Taphole Configuration No Taphole
Bowl Capacity 14.5L
Weight 6.1kg
Plug & Waste Size Open Waste
Plug & Waste Sold Separately
Tapware Sold Separately
WARRANTY
Warranty - Domestic Use 10 Years
Spare Parts & Labour 12 Months
Please refer to Warranty Page for full Terms and Conditions
CLEANING RECOMMENDATIONS:
We recommend the use of soapy water or approved cleaners. This product should not be cleaned with abrasive materials.
Damage caused by any improper treatment is not covered by the product warranty. Refer to Warranty Conditions
1806219
Page 1 of 1
140
169
370
370
ø46
Installation Instructions
Roca Inspira Round Above Counter Basin
370mm x 370mm
Roca Inspira LightSoft Square Above Counter Basin 500mmx370mm
Posh Solus Freestanding Baths
With/Without Overflow
1. Install waste pipe in accordance with the set out (Diagram A). Check the waste pipe will align accurately with
bath waste. It may be necessary to use a flexible coupling or length of unrestrained waste pipe to absorb strain
on the bath due to misaligned waste setup see (Diagram C).
2. This bath is not self supporting and does require a support at the base via masonry, steel or timber. It is
important that the full rim of the bath rests on a support wall constructed from wood, masonry or steel. If the
bath is to be checked into the wall then a batton should be securely bolted to the wall to provide
support (Diagram B and C).
3. Place bath in position and connect waste. Fill bath and then release, checking seals for leaks and that the bath
drains successfully.
4. Apply flexible sealant to the exposed edges.
5. Enclose and tile in bath.
Please check surface thoroughly before installing. Installation of the bath will be taken as
acceptance of the product. Also, it is important to install the product in accordance with the
installation instructions below.
Installation Instructions
Diagram A
Posh Bristol Enamelled Pressed Steel Inset Bath
Page 01
1
Please check surface throughly before installing.
Installation of the bath will be taken as acceptance of
the product. Also, it is important to install the product
in accordance with this installation instruction.
570 mm
1200 1500 1600 1700
700 700 700 700
375 390 390 390
70 70 70 70
65 65 65 65
290 290 290 290
1500
750
375
105
70
310
1700
750
375
110
80
330
Prior To Installation
Please unwrap the bath and check it carefully to ensure it has not been damaged in
handling or transport.
Please check that all parts have been supplied.
Assemble bath on a mat to protect against damage to bath surface.
Please do not remove the old fixture before you unpack and inspect the new unit.
Store the bath in a safe place until you begin installation to avoid damage.
Any installation should be carried out by a qualified tradesman with knowledge of
statutory plumbing requirements in your area.
This installation guide does not include details of waste connection; final decision
about installation of waste connection should be taken by a suitably qualified
person.
1
Please check surface throughly before installing.
Installation of the bath will be taken as acceptance of
the product. Also, it is important to install the product
in accordance with this installation instruction.
C
AED
F
B
ŸInstall waste pipe in accordance with the diagram. Check waste
pipe to ensure alignment with bath waste.
ŸThis bath is not self supporting and does require a support at the
base via Masonry, Steel or Timber (1).
Note: It may be necessary to use a flexible coupling or length
of unrestrained waste pipe to absorb strain on the bath due
to misaligned waste setup.
Note: If the bath is to be checked into the wall then a batten
should be securely bolted to the wall to provide support.
1200
A
B
C
D
E
F
1500 1600 1700 1500 1700
700
360
60
80
290
700
390
80
60
290
700
390
75
85
290
700
390
95
90
290
750
390
60
55
290
750
390
95
65
330
The installation of this Toilet Suite shall be in line with the normal minimum requirements in
AS/NZS 3500
The installation of this Toilet Suite shall be in line with the normal minimum requirements in
AS/NZS 3500
Please unwrap the bath, check it carefully for any damage at the point of delivery when received.
Check that all parts have been supplied.
NOTE: Installation is deemed as acceptance. No consideration for any damage claim will be considered
once bath is fully installed.
All waste and plumbing should be determined by the licensed plumber to accommodate site conditions.
Install waste pipe and trap - taking into consideration the waste position of the bath. Make sure that the surface
where the bathtub will be placed is perfectly flat, free of any excess humidity and offers adequate support.
The bath should be supported by the legs, not by the rim. Adjust the feet to level and support bath from base.
Ensure all adjustable bath feet are level and load bearing. this can be done by using a spirit level on a flat surface
on the top of the bath. Check the bath is level along each axis.,
To make any height adjustments, the bath feet can be rotated to raise or lower the feet. Adjust bath feet until bath
is 3mm above the floor and once bath is level and the feet are in the correct position, the locking nut can be
tightened with a spanner to prevent the feet from moving further.
Measure the location of the bathtub feet in relation to the desired installation position. Mark on the floor the
location of the feet and use a marking pencil to draw a bath outline on the floor around the bath base.
Lift and tilt bath up on it’s side and fit the waste. Water test the bath to check that it is draining correctly without and
leaks.
Silicone seal the bath with the corner wall and in position onto the floor and into 3mm gap between base of bath
and floor to seal it. Allow seal to fully cure for 24 hours before use.
A suggested bath component list for Slab floor or 2nd storey bath connection or Timber floor with clear access
underneath is listed on the next page:
Installation
TBA
Only a qualified tradesperson with knowledge of statutory plumbing requirements in accordance
with AS/NZS 3500 should carry out the installation of the bath's water connections.
Please unwrap the bath and check it carefully to ensure it has not been damaged in handling or
transport.
Please check that all parts have been supplied.
Assemble the bath on a mat to protect against damage to the bath surface.
Please do not remove the old fixture before you unpack and inspect the new unit.
Store the bath in a safe location until you begin installation to avoid damage.
This installation guide does not include a detailed procedure for the waste connection; a suitably
qualified person should advise on the best installation final decision about the installation of the
waste connection.
The Installer must ensure that the waste utilise has a sufficient amount of thread to carry out
plumbing connections.
If the bath has an overflow, ensure an overflow compatible waste is used that can maintain an
acceptable overflow rate.
Install waste pipe and trap - considering the bath's waste position. Make sure that the surface where the bathtub
will be placed is perfectly flat, clean, free of moisture and offers adequate support.
Ensure all adjustable bath feet are level and are in a load-bearing position.
To make height adjustments, the bath feet can be rotated to raise or lower the feet.
Adjust the bath feet until the bath is 3mm above the floor, and once the bath is level and the feet are in the correct
position, the locking nut can be tightened with a spanner to prevent the feet from moving further.
Measure the bathtub feet' location relative to the desired installation position. Mark on the floor the location of the
feet and use a marking pencil to draw a bath outline on the floor around the bath base.
Check that the bath is level along the top and bottom.
Lift and tilt the bath up on its side and fit the waste. Water test the bath to check that it drains correctly without any
leaks.
Seal the bottom of the bath with silicone into a 3mm gap between the base of the bath and the floor. Allow the
silicone to cure before use fully.
Only a qualified tradesperson with knowledge of statutory plumbing requirements in accordance
with AS/NZS 3500 should carry out the installation of the bath's water connections.
Unwrap the bath and check it carefully to ensure it has not been damaged in handling or transport.
Check that all parts have been supplied.
Assemble the bath on a mat to protect against damage to the bath surface.
Ensure you do not remove the old fixture before you unpack and inspect the new unit.
Store the bath in a safe location until you begin installation to avoid damage.
This installation guide does not include a detailed procedure for the waste connection; a suitably
qualified person should advise on the best installation final decision about the installation of the waste
connection.
The Installer must ensure that the waste utilised has a sufficient amount of thread to carry out plumbing
connections.
If the bath has an overflow, ensure an overflow compatible waste is used that can maintain an acceptable
overflow rate.
Plumbers, please ensure a copy of the installation
instruction is left with the end user for future reference.
of 06
Posh - Solus Freestanding Baths With/Without Overflow of 02
Installation Instructions
We recommend the use of soapy water or approved cleaners. This product should not be cleaned with abrasive materials. Damage caused by any
improper treatment is not covered by the product warranty - refer to Warranty Conditions.
Care Details
Plumbers, please ensure a copy of the installation
instruction is left with the end user for future reference.
Care Details
Diagram B
Diagram C
Published 15/08/2023 Page 02
1
Wall
1
Tiles
Wet area
Sheeting
Flexible Sealant
Bath
Masonry, wood
or steel bath
support
6
7
2
1
ŸPlace Bath (2) in position and connect waste. Fill Bath and then
release.
Note: Check seals for leaks and that the bath drains
successfully.
ŸApply Flexible Sealant (6) to the exposed edges.
ŸEnclose and Tile (7) in Bath (2).
6
3
3
Wet area
Sheeting
Cement/
Glue
Ÿ1. : Slab floor or 2nd storey suggested waste installation method.
-1405525 DWV Adaptor PVC X FI 40mm
-1400105 40mm DWV PVC pipe (installer to cut to length)
-Slab floor or 2nd storey bath connection
2
2
4
5
1. Install waste pipe in accordance with the set out (Diagram A). Check the waste pipe will align accurately with
bath waste. It may be necessary to use a flexible coupling or length of unrestrained waste pipe to absorb strain
on the bath due to misaligned waste setup see (Diagram C).
2. This bath is not self supporting and does require a support at the base via masonry, steel or timber. It is
important that the full rim of the bath rests on a support wall constructed from wood, masonry or steel. If the
bath is to be checked into the wall then a batton should be securely bolted to the wall to provide
support (Diagram B and C).
3. Place bath in position and connect waste. Fill bath and then release, checking seals for leaks and that the bath
drains successfully.
4. Apply flexible sealant to the exposed edges.
5. Enclose and tile in bath.
7
6
7
6
2
ŸUnwrap the bath and check it carefully to ensure it has not been damaged in handling or transport.
ŸCheck that all parts have been supplied.
ŸAssemble bath on a mat to protect against damage to bath surface.
ŸDo not remove the old fixture before you unpack and inspect the new unit.
ŸStore the bath in a safe place until you begin installation to avoid damage.
ŸAny installation should be carried out by a qualified tradesman with knowledge of statutory plumbing
requirements in your area.
ŸThis installation guide does not include details of waste connection; final decision about installation of
waste connection should be taken by a suitably qualified individual.
Below floor smart trap
2. Timber floor with clear access underneath:
Connection of bath waste to 40mm P-Trap in timber sub-floor is acceptable when clear access is available
under the floor.
-1409115 Dura Standard P Trap 40mm or 1409121 Dura Short P Trap 40mm
-1400105 40mm DWV PVC pipe (installer to cut to length)
-Timber floor with clear access underneath
Below floor smart pan Waste pipe into smart seal
P-Trap
Install waste pipe and trap - taking into consideration the waste position of the bath. Make sure that the surface
where the bathtub will be placed is perfectly flat, free of any excess humidity and offers adequate support.
Ensure the corner wall where the corner bath will be against is straight so bath can locate right into the corner, or
this bath type cannot be installed.
Ensure all adjustable bath feet are level and load bearing. this can be done by using a spirit level on a flat surface
on the top of the bath. Check the bath is level along each axis.,
To make any height adjustments, the bath feet can be rotated to raise or lower the feet. Adjust bath feet until bath
is 3mm above the floor and once bath is level and the feet are in the correct position, the locking nut can be
tightened with a spanner to prevent the feet from moving further.
Measure the location of the bathtub feet in relation to the desired installation position. Mark on the floor the
location of the feet and use a marking pencil to draw a bath outline on the floor around the bath base.
Lift and tilt bath up on it’s side and fit the waste. Water test the bath to check that it is draining correctly without and
leaks.
Silicone seal the bath with the corner wall and in position onto the floor and into 3mm gap between base of bath
and floor to seal it. Allow seal to fully cure for 24 hours before use.
A suggested bath component list for Slab floor or 2nd storey bath connection or Timber floor with clear access
underneath is listed on the next page:
1. Slab floor or 2nd storey suggested bath connection component list:
1405525 DWV Adaptor PVC X FI 40mm
1400105 40mm DWV PVC pipe (installer to cut to length)
Slab floor or 2nd storey bath connection
2. Timber floor with clear access underneath:
Connection of bath waste to 40mm P-Trap in timber sub-floor is acceptable
when clear access is available under the floor.
1409115 Dura Standard P Trap 40mm or 1409121 Dura Short P Trap
40mm
1400105 40mm DWV PVC pipe (installer to cut to length)
Timber floor with clear access underneath
  • Page 1 1
  • Page 2 2

Posh 1703112 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI