Enwork Skyline Screens Installation guide

  • Hello! I'm your chat assistant. I've reviewed the Skyline Magnetic Topper Screen installation guide and I'm ready to answer your questions. This document details the steps for assembling the screen using magnetic brackets and binding bolts, along with a warning about the fragility of the acrylic screens. Let me know how I can help.
  • What type of screens are compatible?
    What should I do before installation?
    What happens if the magnets are not sitting flush?
TI0046 - Skyline Installation Guide - Rev B.
SKYLINE MAGNETIC TOPPER
SCREENS INSTALLATION GUIDE
SCREENS
WARNING:
Acrylic screens scratch and scuff easily. After removing
protective lm, immediately and carefully install the screen.
DO NOT remove protective lm from acrylic screens, then stack
them in a pile or against each other. Experience shows this will
cause marring and scratching.
INSTALLATION GUIDE
1) PARTS AND FASTENERS INCLUDED
2) TOOLS AND SUPPLIES REQUIRED
Screen Panel
2x Phillips Screwdrivers
Binding Bolt Pair Magnetic Bracket
INSTALLATION GUIDE
Locate the Magnetic Brackets and Binding Bolts.
Conrm that the magnets are installed.
Sandwich the Acrylic or Acoustic Panel Screen between
the Magnetic Brackets and attach them all together with
the Binding Bolt pair.
Place the assembly in its location and verify that the
magnets are sitting ush on the surface. If not, loosen
the bolts to let the magnet sit ush.
FIGURE 1
FIGURE 2
FIGURE 3
3) ASSEMBLY:
Specications subject to change without notice.
Rev 06.2020
1.800.815.7251
www.enwork.com
12900 Christopher Dr. Lowell, MI 49331
/