aspenhome I07-378-PEP Assembly Instructions

  • Hello, I am a chat assistant that has reviewed the provided Assembly Instructions for the aspenhome I07-378-PEP/WBR Combo File. This document outlines the steps to assemble the unit, including attaching the bun feet, and highlights key functionality like the locking file drawer and heavy-duty slides. I'm ready to answer your questions about the assembly or features of this product.
  • What tool is required for assembly?
    What sizes of files can the drawer hold?
    What should I do with the keys for the file lock?
04-17-2017
Page 1/1
ITEM NO: I07-378-PEP/WBR Combo File
Thank you for purchasing this quality product. Be sure to check all packing material carefully for
small parts that may come loose inside the carton during shipment.
TOOLS REQUIRED (NOT PROVIDED)
PHILLIPS SCREWDRIVER
aspenhome RASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
ah
BEFORE USING THIS PRODUCT PLEASE READ,
UNDERSTAND, AND FOLLOW THESE
INSTRUCTIONS.
Save these instructions for future reference.
FOR INDOOR USE ONLY
FUNCTIONALITY INSTRUCTION
STEP 1: Put the case upside down on a soft surface and attach the
bun feet to the bottom. Return the case to the upright position.
Remove the wood screws on
the back panels of drawer box
to remove the rod loops and
file rods if necessary.
Keys for file lock.
Do not discard.
Heavy Duty Ball Bearing Slide
Locking file drawer holds
letter or legal size files
Leveler on Bun Feet
Adjust the leveler
when necessary
COMPONENTS LIST:
No. Description Sketch Quantity
1 Case 1 PC
2 Bun Foot 4 PCS
Case Bottom
Bun Foot
Leveler
/