EarthWay C24HDS Owner's manual

Type
Owner's manual
36210
Qty 2
36214
Qty 4
36200
Qty 4
36205
Qty 3
36300
Qty 17
36207
Qty 2
36305
Qty 2
33117
Qty 1
36105
Qty 1
36104
Qty 1
36103
Qty 1
36209
Qty 4
36404
Qty 18
For
C24HD
Only
Upper Handle
Gauge & Lever
Handle
Shaft
Frame
Brace
Cross
Brace
Lower
Handles
Impeller
Frame
Gearbox
Pivot
Control
Rod
Pivot
Rod
Axle
Foot
(Qty 4 #36214)
1/4-20 X 1½”
Phillips Panhead
(Qty 4 #36300)
1/4-20 SS Locknut
2. Position hopper on side. Install frame using (4) 1/4-20 x 1 ½” Pan Head Phillips machine
screws and (4) 1/4-20 nylon insert locknuts. First put bolts through holes in frame then through
holes in bottom of hopper. Secure with locknuts. TIGHTEN THESE LOCKNUTS NOW.
1. Remove and identify all of the loose parts from carton.
8-2014 Pt# 52142 PAGE 1
Gauge Overlay is snapped
over the metal gauge. Replace
the stop bolt assembly to se-
cure overlay on the gauge.
WARNING
Do not use air tools to assemble. To prevent
seizing, spray all nuts & bolts with oil, grease,
wax, or other lubricant.
PLEASE CONTACT US: IF YOU ARE MISSING ANY PARTS, HAVE ANY DIFFICULTY IN ASSEMBLY, OR HAVE ANY
QUESTIONS REGARDING THE SAFE OPERATION OF THIS SPREADER. THIS MODEL INCLUDES LIFETIME
TECHNICAL SUPPORT. SUPPORT HOT LINE: 574-848-7491 or 800-294-0671, email: techsupport@earthway.com
HELPFUL HINTS: READ THE DIRECTIONS BEFORE ASSEMBLY
;If your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. The
impeller must turn clockwise. Reversing the gearbox will cause the impeller to turn counter clockwise. Clean the impeller
after each use as some fertilizer may become stuck on the impeller blades and will cause uneven spreading.
;Your spreader is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster speeds
will change the spread patterns. Wet fertilizer will also change the spread pattern and ow rate. Clean and dry your
spreader thoroughly after each use, wash between the shut-off plate and bottom of the hopper regularly. To prevent
rust, coat all metal parts (inside and out) including the chassis tubes with a light oil or corrosion preventative spray. Wash
between the shut off plate and bottom of the hopper and allow to dry before next use..
;Gears are permanently lubricated at the factory. Do not open the gearbox or dirt may enter.
;If you use Rock Salt remove the agitator to prevent damage to the gearbox and remove salt from the hopper daily. Rock
Salt will reconstitute back into a solid block if left in the hopper overnight and will damage your gearbox if pushed with the
block in place.
ROCK SALT AND POWDERED MATERIALS SHOULD
NOT BE USED IN THIS SPREADER AS IT WILL DAMAGE
GEARBOX AND CAN VOID WARRANTY.
USE ONLY GRANULAR MATERIALS.
IF YOUR SPREADER COMES SEMI ASSEMBLED, SKIP TO STEP #7
MADE IN THE USA
C24HD & C24HDS
Assembly And OperAting instructiOns
3. Install impeller onto pinion shaft. Insert 1/8” x 1¼” cotter pin
through impeller then through pinion shaft. Use hole nearest
gear box. Spread cotter pin to prevent from falling out. Next,
install the Cross Brace through the Gearbox Brace Support as
shown above.
F
R
O
N
T
Pinion
Shaft
1/8 x 1-1/4”
Cotter Pin (#36105)
Impeller
Cross Brace
GEARBOX ASSEMBLY
Gearbox Brace
F
R
O
NT
EarthWay
EarthWay
EV-N-SPRED
EV-N-SPRED
®
®
4. Install Gearbox by inserting the pinion shaft into hole
in center of hoppers bottom. The word “FRONT” on the
gearbox must point to FRONT of the hopper.
Gearbox
Assembly
Frame brace
¼-20 x 1½”
Hex Head Bolt
and cupped washer
Step 5A
Step 5B
¼-20 x 2¼”
Hex Head Bolt
and cupped washer
Step 5
¼-20 Lock nut
and cupped washer
Cross Brace
Frame
Lower Handle
Shut-Off
¼-20 x 1½”
Hex Head Bolt
Foot
Impeller
5. Install the Lower Handles: insert 2¼” bolt with cupped
washer (C24HD) through second hole (approximately
in the middle of the Lower Handle) in lower handle and
through rst hole in frame and secure with locknut.
A. Now insert 1½” bolt through rst hole in lower handle,
then through frame brace, and nally into the threaded
connector in the Cross Brace. [NOTE: Numbers on frame
braces must be facing toward gearbox as shown.]
Install the Foot into the Frame and align the bolt holes in
the Foot and the Frame (a Phillips screwdriver or large
nail is helpful to align the parts)
B. Next insert 1½” bolt through other end of frame brace
and through second hole in frame through the foot and
install cupped washer (C24HD) and locknut.
DO NOT TIGHTEN YET.
PAGE 2
NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS
STARTING WITH FIRST STEP. DO NOT OVER TIGHTEN.
nOtice cupped wAsher lOcAtiOns - On c24hd Only
TIP: PosITIon cuPPed washers beTween nuT or bolT head and chassIs
Install the axle
as shown above
¼-20
Lock Nut
and
(Cupped Washer
for C24HD)
¼-20 x 2¾”
Hex Head Bolt
¼-20 x 2¼”
Hex Head Bolt
and (Cupped Washer
for C24HD)
2 Position Handle
Lower Position
Upper Position
Insert Pivot Rod
into Shut-Off
and rotate to secure
PAGE 3
Angle
Attaching
Arm
nOtice cupped wAsher lOcAtiOns
fOr c24hd Assembly
6. Install the axle through the lower handle and then the gearbox and nally, through the other lower handle.
Now install the drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2” cotter pin through wheel and
through axle. Bend with pliers to prevent pin from falling out.
NEXT Install coast wheel to axle, and then using outside pin hole on the axle (as shown on the left), insert 1” cotter pin through
axle [NOTE: The cotter pin does not go through the wheel]. Bend with pliers to prevent pin from falling out.
TURN SPREADER UPRIGHT ON TO WHEELS
Coast wheel side
1” Cotter Pin
Drive wheel side
2” Cotter Pin
7. NOTE: BEFORE INSTALLING THE GAUGE &
LEVER ASSEMBLY AND UPPER HANDLE TO THE
HANDLE SHAFT, SELECT THE BEST POSITION
FOR THE OPERATOR’S COMFORT. You can select
lower or upper positions for best t to the operator’s
height. Insert 2 ¾” bolt through the Gauge, then upper
handle and nally through handle shaft. See example
to the right.
DO NOT TIGHTEN LOCKNUT YET.
8. Insert pivot rod into shut off plate as shown below.
[TIP: Insert rod end from the top, then push down &
turn to lock in place.]
9. Insert other end of pivot rod into pivot and bracket
assembly as shown. [TIP: Insert rod end from the side
that has the angle attached to the bracket, then turn
to lock in place as shown at the right and above. The
correct positioning of the Pivot Bracket has the Angle
and Attaching Arm facing away from the gearbox.]
5
1
0
1
5
3
0
Insert Control Rod
into
Pivot Bracket
Attach ¼-20 REGULAR
(NOT LOCKNUTS) Hex Nuts
at these points.
Notice the position
of the double bend point.
¼-20 X 1¾”
Hex Head Bolt
and (Cupped Washer
for C24HD)
¼-20
Lock Nut
and (Cupped Washer
for C24HD)
Setting #30
CALIBRATION POINT
10. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using (4)
1 ¾” bolts with cupped washers (C24HD) and (4) locknuts (2) cupped washers (C24HD).
[TIP: Attach right side rst with cupped washers on both nuts and bolts, then attach left (Pivot
Bracket) side with washers only on the bolt side]
TIGHTEN BOLTS AND NUTS NOW.
5
1
0
1
5
3
0
Gauge & Lever
Control Rod
Tabbed Hole
Control Rod
Lever Tensioning Nut
12. Next push lever forward to setting “0”. Align control rod with hole
in pivot bracket, pull lever backward to insert control rod through
hole in pivot bracket. [TIP: If the lever does not move easily, loosen
slightly to make this step easier] Now install 1/4-20 regular nut on to
Control rod.
DO NOT TIGHTEN NUTS YET.
13. Pull lever back to setting “30” as shown. Next push pivot &
bracket forward so that the shut off plate in the hopper is in the full
open position. [NOTE: THE SETTING OF “30” ON THE GAUGE &
LEVER ASSEMBLY MUST OPEN THE SHUT-OFF COMPLETELY
FOR PROPER CALIBRATION.] Now tighten the nuts against the
pivot bracket to prevent change in calibration. Test by opening
and closing the Gauge & Lever a few times to ensure an accurate
calibration.
14. Tension on the ow control lever may be adjusted by tightening
or loosening the tension nut as shown above.
11. Install attened end of control rod in to lever on gauge
into Control Rod Tabbed hole as shown. Turn to lock in
place.
NEXT: Install (1) 1/4-20 Hex Nut [not a locknut] on to
Control Rod and thread halfway as shown below.
16. Insert Agitator to pinion shaft on inside of hopper.
NOTE: Position of at side of agitator. This pin should
be installed as shown above.
PAGE 4
15. Install the two 1/4-20 x 1” Stainless Steel bolts into holes located
on each side of the hopper and secure with 1/4-20 lock-nut. Next slide
Debris Screen under the two bolts inside the hopper.
1/4-20 x 1”
Hex Head Bolt
Stainless
1/4-20 Lock Nut
Stainless
nOtice cupped wAsher lOcAtiOns
fOr c24hd Assembly
17. For normal operation both doors should be fully opened. To reduce ow to the left side, partially or completely close the
door over the rear (LARGE) hole. To reduce ow to the right side, partially or completely close the door over the front (SMALL)
hole. Close both doors for a narrow center spread pattern.
WARNING: If the optional side deector is being used in the down position, the plate over the rear (LARGE) hole MUST BE
CLOSED or an over application of material will occur.
The settings furnished on the Setting Matrix are intended as a guide only. Variations in physical characteristics of material
applied, walking speed, and roughness of ground surface may require slightly different spreader settings. Due to these
conditions, Earthway Products, Inc. makes no warranty as to the uniformity of coverage actually obtained from the settings listed.
S
p
r
e
a
d
P
a
t
t
e
r
n
Each adjustable port
has 8 positions
One port closed
Both ports closed
Both ports open


FULL Rate (one pass) HALF Rate (two passes)
SPREAD PATH
© 2013 Earthway Products, Inc. All rights reserved
OPERATING INSTRUCTIONS
Before lling hopper, become familiar with the operation of this spreader.
5Obtain proper setting for material to be used from the enclosed SETTING MATRIX included with this spreader, or from our
web site under the MANUALS SECTION.
5Move stop bolt on rate gauge assembly to the proper setting.
5While pushing spreader forward, pull control lever back to stop bolt.
5To stop, push lever forward to close ow holes before you stop moving.
5When nished, empty any remaining material from hopper.
5Thoroughly wash spreader and allow to dry before storing. Apply coating of light oil to help prevent corrosion.
5If you use Rock Salt, remove agitator when using Rock Salt to prevent damage to the gearbox.
Earthway Products, Inc.
1009 Maple Street, PO Box 547
Bristol, IN 46507
For Your Records
Date Purchased
Place of Purchase
HOW TO ORDER SPARE PARTS
All spare parts listed may be ordered direct from
EarthWay Products, Inc.
Be sure to give the following information when ordering.
Model Number
Part Number
Part Description
Call (574) 848-7491, 800-294-0671, or email: parts@earthway.
com for current prices.
5-YEAR LIMITED WARRANTY
Earthway Products, Inc. warrants this product free of defects in original workmanship and materials for a period of 5-Years
to the end user with the original purchase receipt. If a manufacturing non-conformance is found, Earthway Products, Inc.
at its discretion will repair or replace the part(s) or product at no charge provided the failure is not the result of incorrect
installation, mishandling, misuse, tampering, or normal wear and tear as determined by Earthway. Earthway at its discretion
may require that the part(s) or product be returned along with the original purchase receipt at owners’ expense for examination
and compliance with the terms of this warranty. Do not return any product without rst receiving authorization from Earthway
Products, Inc. To seek remedy under this warranty, contact Earthway Products, Inc. at 574-848-7491, techsupport@earthway.
com or write to Earthway Products, Inc. P.O. Box 547 Bristol, Indiana 46507 and describe the nature of the manufacturing
defect. SPECIFIC LIMITATIONS: This warranty covers only the part(s) or product; any labor charges associated with repair
or replacement of non-conformances are specically excluded. Due to the corrosive nature of most fertilizers and ice melt
products, Earthway Products, Inc. makes no warranty against and specically excludes part(s) or product degradation or failure
due to corrosion or its effects. Clean and dry your spreader thoroughly after each use, as a preventative measure, coat all
metal parts with a light oil or silicon spray.
PAGE 5
44249
41
60060R
OPTIONAL
Heavy-Duty
Rain Cover
&
Side Deflector Kit
77002
OPTIONAL
Heavy-Duty
Rain Cover
37
30
5
26
20
11
11
14
32
9
11
28
11
22
34
33
31
25
13
2
27
16
3
1
8
21
5
29
23
5
9
22
36
5
24
22
24
12
15
12
36
18
19
18
17
40
10
35
35
35
35
35
35
35
6
7
5
5
5
6
4
38
39
C24HD & C24HDS prOfessiOnAl brOAdcAst spreAder
Key # Part # Description Key # Part # Description
1 40003 SQUARE SCREEN 22 36205 1/4-20 X 2 1/4" HHCS S.S.
2 60219 HOPPER ASSEMBLY 23 24300 HANDLE SHAFT STAINLESS STEEL
3 33117 AGITATOR 23 25301 HANDLE SHAFT PAINTED
4 36214 1/4-20 X 1 1/2" PHPMS S.S. 24 36305 1/4-20 HEX NUT STAINLESS STEEL
5 36300 1/4-20 NYLON INSERT LOCKNUT S.S. 25 44251 PIVOT ROD
6 36210 1/4-20 X 1" HHMS S.S. 26 42256 CONTROL ROD
7 12209 HOPPER BUSHING 27 60298 GAUGE & LEVER ASSEMBLY
8 12278 SHUT OFF PLATE ASSEMBLY - PROFESSIONAL 28 36207 1/4-20 X 2 3/4" HHCS S.S.
9 24202 LOWER HANDLE COMPLETE - STAINLESS STEEL 29 12273 GRIP 9.75" LONG
9 25202 LOWER HANDLE COMPLETE - PAINTED 30 60069 UPPER HANDLE ASSEMBLY W/GRIPS C-SERIES PAINTED
10 60299 PIVOT & BRACKET ASSEMBLY 30 60070 UPPER HANDLE ASSEMBLY W/GRIPS C-SERIES STAINLESS
11 36200 1/4-20 X 1 1/2" HHCS S.S. 31 36208 #6 X 3/8" TYPE 25 PHPS S.S.
12 42237 FRAME BRACE 32 11927 SHUTOFF SUPPORT- LARGE
13 24704 CROSS BRACE (11.125") 33 11926 SHUTOFF SUPPORT- SMALL
14 24111 FRAME STAINLESS STEEL 34 31138 #8 X 3/8" PMT #8 HD COARSE BLACK
14 25108 FRAME PAINTED 35 36404 1/4 CUPPED WASHER S.S.
15 12109 IMPELLER (9" DIA) 36 36209 1/4-20 X 1 3/4" HHCS S.S.
16 36105 1/8" X 1 1/4" COTTER PIN S.S. 37 60027 WING NUT ASSEMBLY BLACK
17 60333 NEW FLOATING GEAR BOX 38 37100 1/4-20 X 1" CARRIAGE BOLT ZINC
18 12352 BEARING (COMMERCIAL) EACH 39 12147 SPACER
19 36103 3/16 X 2" COTTER PIN S.S. 40 24500 AXLE, COINED
20 19117 13" DIA PNEUMATIC TIRE DRIVE 41 25723 FRAME FOOT PAINTED
21 36104 3/16 X 1" COTTER PIN S.S. 41 25723-SS FRAME FOOT STAINLESS STEEL
3
0
2
0
1
0
0
L
e
s
c
o
S
e
t
t
i
n
g
s
Standard Settings (12196) Gauge Overlay and
OPTIONAL Lesco Settings (12195) Gauge Overlay
3
0
2
0
1
0
0
E
a
r
t
h
W
a
y
S
e
t
t
i
n
g
s
60166R
OPTIONAL
3-Side Deflector Kit
Bolt Identifier
1-1/2”
1”
2”
2-1/4”
2-3/4”
Earthway Products, Inc.
P.O. Box 547
Bristol, Indiana 46507
(574) 848 -7491 or
1-800-294-0671
Using the EV-N-SPRED®
Dual Port PRO Adjustable
Shut-Off System
The EV-N-SPRED® Dual Port PRO Adjustable Shut-Off System is
included on all professional models and allows the operator
to balance the spread pattern evenly across the full 180o
spread width, regardless of the weight or size of granular
material. By closing either the right and or left side
throwing ports you can balance the spread pattern to
exacting precision without compromising spread width
or application rate.
Each EV-N-SPRED® Dual Port PRO Adjustable
Shut-Off System drop hole has a corresponding 1/3rd
coverage area on the spread width of the spreader leaving a
feathered-edge for overlapping the spread path. The illustration to
the right shows each port and the corresponding 1/3rd coverage
area of the spread path. These ports can be adjusted to effectively
balance the spread pattern, giving equal amounts of material
across the full 180o spread pattern.
EV-N-SPRED®Dual Port PRO System Setup
Test all material prior to beginning your spreading job. You will need
a 50’ measuring tape, a small scale to weigh the material, bucket or
container to hold the material for re-weighing, chalk or a line marking
device, and (7) low baking tins. Using the EarthWay® Bag Calibrator
#77016 can greatly reduce the time needed for
determining the Setting Rates on any material but
is not mandatory to establish a setting rate.
1. Evaluate the material being spread by comparing
it to the following standard as a reference.
Large/Heavy is the size of a BB (⅛ in / 3mm), spread width is 20 - 30 feet (7.6 -
9.1 meters
Medium/Mixed (½ the size of a BB), spread width is 16 - 20 feet (4.8 - 7.6 meters)
Small/Fine (the size of sand), spread width is 12 - 16 feet (3.7 - 4.8 meters)
2. Add a small amount of the material into the spreader, enough to cover
the bottom (2-3 in / 5 - 7 cm) and begin to test for spread width.
Set the stop on the gauge to #15 and push the spreader several feet /
meters at normal walking speed on a at hard surface (where the material
will be visible), and OPEN the lever to the STOP while continuing to
walk for 3-4 paces, and CLOSE the shut-off and STOP (don’t move the
spreader from that position). Measure the spread width and evaluate
the spread pattern for even distribution on either side of the spread width
center line. TIP: Typical spread width references are listed above. The
spread width that you measure is used to calculate the actual Setting
Rate for the material.
S
p
r
e
a
d
P
a
t
t
e
r
n
Adjustable Throwing Ports
with 8 repeatable settings
to balance the left or right
spread pattern to
the center.
S
p
r
e
a
d
P
a
t
t
e
r
n
SPREAD WIDTH
Gauge & Lever
15
FINE MEDIUM LARGE
ADJUSTING THE EV-N-SPRED® DUAL PORT SHUT-OFF SYSTEM
1. Next, using the (7) low baking tins position, them in a straight line on
2-foot centers across the spread width as shown at the right.
Adjust the left or right variable throwing ports to EVEN THE SPREAD
pattern. TIP: For large/heavy materials, close the LEFT SIDE (LINES)
port slightly before you start your EV-N-SPRED® test. For small/light
materials, open the LEFT SIDE (LINES) port fully and close the RIGHT
SIDE (DOTS) port slightly before you start your EV-N-SPRED® test.
With BOTH ports closed, the spread is only from the center port, and
will give you a 3-4ft spread width in the center of the spreader - great for
medians.
Begin pushing the spreader several feet before the line of tins and at
normal walking speed. Walk along the Center Line, and OPEN the
Lever to the STOP 3-4 paces before the line of tins and continue walking
past the tins 1 or 2 paces and CLOSE the Lever and STOP.
Visually evaluate the material in the baking tins to determine if your
spread pattern is balanced - having the same amount of material in each
baking tin.
Empty each tin back into the spreader, adjust the ports and RETEST
until you are satised that the coverage is balanced.
ESTABLISH THE SETTING RATE
2. Remove the material from the hopper, and mark the distance that you
need to travel with the spreader to attain the designated coverage area
- i.e. 1,000 square feet using the spread width you determined earlier.
Above is a chart to help determine the distance needed for 1,000 square
foot calculation.
Mark the START and END POINTS on the surface required for the test.
Weigh a small amount (10-20lbs/4-9kg) of the material, and add that into
to the spreader. Using the Setting Matrix included with the spreader,
estimate a setting rate based on material manufacturers recommendations
and adjust the STOP on the Gauge to that position.
Now to test, start walking 1-2 paces before the START LINE and OPEN
the Lever to the stop and then CLOSE when you cross the END POINT
LINE.
Pour the remaining material from the spreader and weigh to calculate the
amount applied over the area. Adjust the Setting Rate to a higher number
if you need to increase the application rate, or to a lower number if you
applied too much in the test.
You may need to repeat this process to acquire the exact rate.
The EV-N-SPRED® Dual Port PRO Adjustable Shut-Off System ensures
that EarthWay® Professional spreaders evenly spread all types of fertilizers, seed, ice melt, or other granular
products, and is only available from EarthWay®.
Spread width
in feet
Length needed for
1,000 Sq Ft
Spread width
in feet
Length needed for
1,000 Sq Ft
7 142’ 11” 14 71’ 5”
8 125’ 15 66’ 8”
9 111’ 1” 16 62’ 6”
10 100’ 17 58’ 10”
11 90’ 11” 18 55’ 7”
12 83’ 4” 19 52’ 7”
13 76’ 11” 20 50’
START
END
COVERAGE AREA
i.e. 1,000 SQ FT
2’ 2’ 2’2’2’2’
S
p
r
e
a
d
P
a
t
t
e
r
n
Pt. #53192
5
1
0
1
5
3
0
Insert Control Rod
into the Pivot Bracket
Attach 1/4-20 Regular
Hex Nuts at these points.
Notice the position
of the double bend point.
It must be at this location
30
Broadcast Setting Matrix
EV-N-SPRED® Calibration Techniques
Shut-Off
Fully Open
Tighten
Screw
Slide Outer
Control Wire
to Calibrate
Cable Type Adjustment
Loosen/tighten screw on cable clamp then
slide outer cable in/out for calibration
Fig 2
Drop holes shown fully open.
How to ensure your spreader is properly calibrated
Make sure the drop holes in the bottom of the hopper are fully open when the Rate Control handle is on #30. If not, please
adjust control cable or control rod to allow for a full open hopper position at #30.
Rod Type Adjustment
1. Open the shut-off so that the drop holes are completely open as illustrated to the right.
2. Review the Control Lever position - if it is set so that the forward edge is at #30, you are calibrated. If not,
you need to adjust the control rod at the pivot bracket shown in Fig 1.
A. If your shut-off is not able to open fully as in step #1. Loosen the top nut a few turns, then loosen the lower nut
so that it allows you to push the shut-off open fully. Next tighten each nut so that they contact the pivot bracket
without moving it, and then carefully tighten each nut fully so they do not loosen during use. Recheck adjustment
as outlined in #1 above.
B. If your shut-off is able to open fully as in step #1, but the Control Lever is not at #30. Loosen the top nut a few
turns, then loosen the lower nut so that it allows you to push the Control Lever to #30. Next tighten each nut so
that they contact the pivot bracket without moving it. Carefully tighten each nut fully so they do not loosen during
use. Recheck adjust as outlined in #1 above.
Cable Type Adjustment
1. Open the Control Lever so that the shut-off and drop holes are completely open as illustrated above right.
2. Review the Control Lever position so that the indicator is pointed to #30, if it is your calibration is correct. If not you
need to adjust the control cable at the cable clamp on the underside of the hopper as shown in Fig 2.
A. If your shut-off is not able to open fully as in step #1. Loosen the cable clamp screw slightly so that you can slide
the outer cable out so that the shut-off is fully open. Next tighten the cable clamp screw securely. Recheck
adjustment as outlined in #1 above.
B. If your shut-off is able to open fully as in step #1, but the Control Lever is not at #30. Loosen the cable clamp screw
slightly so that you can slide the outer cable in so that the Control Lever opens to #30. Next tighten the cable clamp
screw securely. Recheck adjustment as outlined in #1 above.
If you have any questions regarding the operation or assembly of your spreader please call us at 800-294-0671 or
574-848-7491 Monday - Friday 9:00am - 4:00pm Eastern. Accessories and Repair Parts are also available at these
numbers, or online at www.earthway.com/parts
Fig 1
©2014 Earthway Products, Inc. All rights reserved. EarthWay® EV-N-SPRED®, FLEX-SELECT®, and SPRAY-PRO® are registered trademarks of Earthway Products, Inc. Use of trademarks are prohibited
unless approved by Earthway Products, Inc. 1009 Maple Street Bristol, Indiana 46507
CHART 1
BAG COVERAGE IN
SQUARE FEET
5,000 10,000 15,000
LBS/1,000 SQ FT
B
A
G
W
E
I
G
H
T
5 LBS. 1.0 0.5 0.3
10 LBS. 2.0 1.0 0.7
15 LBS. 3.0 1.5 1.0
18 LBS. 3.6 1.8 1.2
20 LBS. 4.0 2.0 1.3
25 LBS. 5.0 2.5 1.7
30 LBS. 6.0 3.0 2.0
35 LBS. 7.0 3.5 2.3
40 LBS. 8.0 4.0 2.7
45 LBS. 9.0 4.5 3.0
50 LBS. 10.0 5.0 3.3
SPREAD WIDTHS FOR DIFFERENT
PARTICLE SIZES
Particle Size English Metric
Small/Fine
(Sand) 5-7ft. 1. 5-2.1m
Medium
(Half BB) 7-9ft. 2.1-2.7m
Large
(Full BB) 9-12ft. 2.7-3.7m
SPREAD WIDTH FOR DIFFERENT
SIZE GRASS SEED
Seed Size English Metric
Fine 5-7ft. 1.5 -2.1m
Coarse 7-10ft. 2.1-3.1m
ESTABLISHING A SETTING RATE
Step 1: Use Chart 1 to estimate the number of LBS/1,000 square feet of coverage
(Example: 20 LB. bag with 10,000 square foot coverage = 2.0 LBS/1,000
square feet)
Step 2: Find the closest LBS/1,000 square feet in Chart 2 that you estimated using
Chart 1 (Example: 2.0 LBS/1,000 square feet = Spreader Setting of 13)
Step 3: Determine the Spread Width by evaluating the particle or seed size in
Chart 3 to determine the Spread Width between Spread Paths
METRIC RATE SETTING
Determining a Setting Rate
Use chart below to determine the Setting Rate based on Grams/Square
Meter of coverage as directed on the bag.
GRAMS/SQ
METER
LBS./1,000
SQ FT
SPREADER
SETTING
5 Grams 1.0 LBS. 11
10 Grams 2.0 LBS. 13
15 Grams 3.0 LBS. 14
20 Grams 4.0 LBS. 16
25 Grams 5.0 LBS. 17
30 Grams 6.0 LBS. 18
35 Grams 7.0 LBS. 19
40 Grams 8.0 LBS. 20
45 Grams 9.0 LBS. 22
50 Grams 10.0 LBS. 23
The settings furnished on the Rate Setting Matrix are intended as a guide only. Variations in physical characteristics of material applied, walking speed, and roughness
of ground surface may require slightly different spreader settings. Due to the above conditions, EPI makes no warranty as to the uniformity of coverage actually
obtained from the settings listed.
FULL Rate (one pass) HALF Rate (two passes)
SPREAD PATH
OPEN CLOSE
OPEN
CONTROL
CLOSE
CONTROL SPREAD
WIDTH
Maintain a consistent walking
speed of 2-3mph or the
application rate will change.
All spread widths are determined by particle
size and weight.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10

EarthWay C24HDS Owner's manual

Type
Owner's manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI