Chore-Time MF688C Electric Power Lift Product information

  • Hello! I am an AI chatbot trained to assist you with the Chore-Time MF688C Electric Power Lift Product information. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
CTB, Inc.
P.O. Box 2000 • Milford, Indiana 46542-2000 • U.S.A.
Phone (219) 658-4101 • E-Mail: [email protected]
Electric Power Lift Wiring Diagram
for 14613 Manual Control
IMPORTANT: FOR GE MOTOR, THE YELLOW AND BLUE MOTOR LEADS MUST BE PULLED
OFF OF THE MOTOR TERMINALS, THE TERMINALS CUT OFF OF THE ENDS,
AND STRIPPED BEFORE THEY ARE WIRE NUTTED TO THE SWITCH BOX
LEADS.
1. Ground all electrical equipment.
2. All wiring must be done by a qualified electrition in accordance with local and national electric codes.
MF688C
October 1998
CTB, Inc.
P.O. Box 2000 • Milford, Indiana 46542-2000 • U.S.A.
Phone (219) 658-4101 • E-Mail: [email protected]
MF688C
October 1998
/