urban ambiance UQL3832 Installation guide

  • Hello! I've reviewed the installation instructions for the Urban Ambiance UQL3832 light fixture. This manual provides guidance on setting up both a chandelier and a semi-flush mount configuration, along with necessary details about the fixture's height adjustability, bulb requirements, and wiring. I am ready to answer your questions about the installation process.
  • What type of bulbs are required?
    Are the bulbs included?
    What is the height adjustment range?
1 of 5
Light SourceTools Required
BULB BASE TYPE
Medium (E26)
BULB SHAPE
TYPE A
100W
MAX
4 BULBS REQUIRED
BULBS NOT INCLUDED
Warnings and Cautions
Turn off the electricity at the circuit breaker
before installation. Consult a licensed
electrician if in doubt about installation.
Turn off power to the fixture and allow the
bulbs to cool before replacing.
Crossbar Assembly
x 1
A
Package Contents
PARTS BAG
Fixture Body
x 1
Crossbar Assembly Fixture Chain Ceiling Canopy Bulb
Table of
Contents
Fixture Height Adjustable
12to 67
Fixture Chain
x 1
E
Ceiling Canopy
x 1
F
Quick Link
x 2
D
Preparation: Identify and inspect all parts
before beginning the installation.
Missing or damaged parts? Contact your
original place of purchase.
Wiring
Outlet Box Screw
x 2
B
Wire Connector
x 3
C
STEP 3A STEP 4A STEP 6ASTEP 5ASTEP 2A
GFixture Loop Assembly
x 1
H
Assembly Instructions for
Chandelier Light
(Step 1A - Step 5A)
Assembly Instructions for
Semi-flush Light
(Step 1B - Step 4B)
Crossbar Assembly Bulb
Wiring
STEP 2B STEP 4BSTEP 3BSTEP 1B
STEP 1A
Fixture Loop
Fixture Body
Installation Instructions: UQL3832
www.urbanambiance.com
2 of 5
STEP 2A
1 2 3
Step 1
Install crossbar assembly
Step 2 - 3
Test fitting ceiling canopy to nipple
STEP 3A
2
Step 2 - 3
Install Fixture Chain
1
Step 1
Adjust fixture chain length
3
Suggested Chain Length:
8 ceiling: 16” Chain
9 ceiling: 28” Chain
10 ceiling: 40” Chain
N
L
N
L
STEP 1A 1 2
Remove lock ball
and knurled nut
Install fixture
loop assembly
www.urbanambiance.com
3 of 5
STEP 4A
1 2
Step 1
Feed the fixture wires
through the loop
N
L
*Green Ground Screw
on crossbar optional
White wire (neutral)
from outlet box
Ground wire
from Fixture
Black or Red wire (hot)
from outlet box
Bare or Green ground wire
from outlet box
Supply wire from fixture
ribbed side or identified
with the Label “N
supply wire from fixture
smooth side or identified
with the label “L
STEP 5A
STEP 6A
www.urbanambiance.com
4 of 5
STEP 1B 1 2
4
Install crossbar assemblyRemove canopy chain loop,
one lock washer and one hex nut
Test fitting ceiling canopy to nipple
STEP 2B
1 2
Step 1
Cut supply wires
N
L
*Green Ground Screw
on crossbar optional
White wire (neutral)
from outlet box
Ground wire
from Fixture
Black or Red wire (hot)
from outlet box
Bare or Green ground wire
from outlet box
Supply wire from fixture
ribbed side or identified
with the Label “N
supply wire from fixture
smooth side or identified
with the label “L
10"
3
Remove lock ball
and knurled nut
www.urbanambiance.com
5 of 5
STEP 3B
STEP 4B
www.urbanambiance.com
/