Toro Bluebird Bagger Rework Kit, 100 Series Z Master Installation guide

Type
Installation guide
1
All Rights Reserved
Printed in the USA
2002 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
Bluebird Bagger Rework Kit
For Use with the Exhaust Kit
Part No. 106-0644
Form No. 3328-203
Installation Instructions
Use this kit to modify the frame of a Bluebird Bagger to fit around the crossover tailpipe.
Loose Parts
Description Qty. Use
Bagger support bracket
Bolt, 5/16 x 1 in.
Locknut, 5/16 in.
Bolt, 5/16 in. x 2–3/4 in.
1
2
3
1
Connect the bagger to the machine.
Components around engine will be hot if the
machine has been running. Touching hot
components can cause burns.
Do not touch engine components when hot.
Allow engine to cool before performing
maintenance.
Warning
Modifying the Tailpipe Guards
and Bagger Frame
1. Before installing the left tailpipe guard, cut a section of
the guard out as illustrated in Figure 1.
m–6117
1
2
Figure 1
1. Right tailpipe guard 2. Remove and discard
2. Before installing the right tailpipe guard, remove a
section of the right tailpipe guard as shown in Figure 2.
m–6115
1
2
Figure 2
1. Right tailpipe guard 2. Remove and discard
3. Cut the right–hand cross tube from the bagger frame.
See Figure 3.
m–6116
2
1
3
4
Figure 3
1. Right side of machine
2. Cross tube—remove
3. Bagger frame
4. Cross tube removed
2
4. Before installing the right tailpipe guard, remove a
section of the bagger frame as shown in Figure 4.
m-6114
1
2
3
3
2
Figure 4
1. Bagger frame
2. Grind here for right
tailpipe guard
3. Right tailpipe guard
Installing the Bagger Support
Bracket
1. Install the right tailpipe guard. Refer to the Exhaust Kit
for hardware and instructions.
2. Slide the new bagger support bracket onto the bagger
frame (Figures 3 and 4).
3. Using the new bagger support bracket as a template,
mark the two holes in the new bagger support bracket
(Fig. 1).
4. Drill 2 holes (11/32 in. diameter) into the right side of
the machine frame (Fig. 5).
m–6113
1
2
3
4
Figure 5
1. Bagger support bracket
2. Mark and drill 2 holes,
11/32 in. diameter
3. Machine frame
4. Right tailpipe guard
5. Secure the bagger support bracket to the machine frame
with 2 bolts (5/16 x 1 in.) and flange nuts (5/16 in.)
(Fig. 5).
6. Secure the bagger support bracket to the bagger frame
with a bolt (5/16 x 2–3/4 in.) and a flange nut (5/16 in.)
(Fig. 5).
m–6112
4
3
2
3
1
5
Figure 6
1. Bagger support bracket
2. Bolt, 5/16 x 1 in.
3. Locknut, 5/16 in.
4. Bolt, 5/16 x 2–3/4 in.
5. Bagger frame
7. Refer to the Exhaust Kit for installation of the left
tailpipe guard.
  • Page 1 1
  • Page 2 2

Toro Bluebird Bagger Rework Kit, 100 Series Z Master Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI