EZ Log Structures Oriental 5 User manual

Type
User manual
HUD -1 EZ BUILDING CARE AND MAINTAINENCE
We recommend the structure be stained with a weatherproof
type product after installation for best color results.
We recommend assembly and construction begin as soon as the
package is opened. The building MUST be placed on a level and
square solid foundation.
We recommend to not leave material laying out over an extended
amount of time especially in direct sunlight as this may cause
warping and/or damage especially to smaller component pieces
such as trim boards, hardware, etc…
We recommend to place a roof covering as soon as the structure
is completed to avoid damages and leaks of the interior floor
boards.
We recommend the use of a rubber or wood mallet only during
construction of the structure. A hammer should only be used with
the blocks provided to set the wall, window, and door selections.
Only place nail and screws in recommended areas as outlined in
the instruction manual.
Adjust all windows and doors by turning the exterior hinges
clockwise or counter-clockwise until alignment is made.
Do not modify any piece of the structure unless it is noted in the
instructions it is Ok to do so.
For additional assistance or questions, please contact us at
[email protected]om or at 731-574-8702.
  • Page 1 1
  • Page 2 2

EZ Log Structures Oriental 5 User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI