PORTACOOL PARKULCYC200, PARKULCYC300, PARKULVRT100 User manual

  • Hello! I am an AI chatbot trained to assist you with the PORTACOOL PARKULCYC200 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
SETTING THE STANDARD IN EVAPORATIVE COOLING MEDIA
KÜÜL® evaporative cooling media is manufactured in the USA by Port-A-Cool, LLC
Maintenance Guide
KÜÜL® pads are a durable and long lasting cooling media. Following are sugges-
tions that will maximize the life and efficiency of the cooling pads.
• Port-A-Cool,LLC,recommendsthatthepH of the water be maintained at a level
between 6 and 8. Exceeding these limits will seriously deplete the resin content of the
pad and thus reduce its structural integrity.
• Removeandbrushpadswithasoftbristledbrushandthenflush system to remove
debris.Thisshouldbedoneevery4to6weeksduringoperatingseason.
• Aclean water distribution system is the most important
aspectformaintainingtheentireevaporativecoolingsystem.
This,coupledwithquarterlyinspection/maintenance
checks,willensureaproperlyoperatingevaporative
cooling system.
• Frequently check system for damaged or clogged cooling pads.
• Minimize the number of on/off wetting cycles for the
cooling pads.
• Completelydry the cooling padsonceevery24hours.
• Maintainawater bleed off rate of 3-5% per day.
• Ensuresumptankisenclosedandcleanedbi-weekly.
• Cleanwaterfiltersweekly.
(936) 598-5651 (800) 695-2942
P.O. Box 2167 Center, TX 75935 Fax (936) 598-6328 www.kuulpads.com [email protected]
Revised: August 27,2012
KÜÜL® pads are manufactured by Port-A-Cool, LLC in the U.S.A.
Algae Growth and Mineral Build-up:
Prevention Guide
Algae Growth
Algaewillgrowonanysurfacethatiswetandexposedtodirectsunlight.
Followingaresuggestionsthatwillaidinthepreventionofalgaegrowthonyour
KÜÜL® pads.
• Drythepadsatleastonceevery24hours.
• Keepthepadsandsumpshadedfromdirectsunlight.
• Useanalgaecide.
• Identifyandeliminatesourcesofnutrientsinthewater.
• Completelyflushsystemevery4to6weeksduringtheoperatingseason.
• DONOTusechlorineatlevelsthatexceed1ppm(partspermillion).
Mineral and Scale Build-up
Whenwaterhasahighmineralcontent,scaleandmineraldepositsform
throughoutthecoolingpad.Inordertoaidinthepreventionofmineralbuild-up
follow these tips:
• MaintainthewateratapHlevelbetween6and8.
• Avoidorminimizeon/offwettingcycles.
• Useadailywaterbleedoffrateof3-5%.
• Useamineralpreventionaid.
• Increasetheamountofwaterflowingoverthefaceofpads.
SETTING THE STANDARD IN EVAPORATIVE COOLING MEDIA
KÜÜL® evaporative cooling media is manufactured in the USA by Port-A-Cool, LLC
(936) 598-5651 (800) 695-2942
P.O. Box 2167 Center, TX 75935 Fax (936) 598-6328 www.kuulpads.com [email protected]
Revised: August 27, 2012
KÜÜL® pads are Manufactured by Port-A-Cool, LLC in the U.S.A.
/