PORTACOOL PARKULCYC200 User manual

Type
User manual

This manual is also suitable for

SETTING THE STANDARD IN EVAPORATIVE COOLING MEDIA
KÜÜL® evaporative cooling media is manufactured in the USA by Port-A-Cool, LLC
Maintenance Guide
KÜÜL® pads are a durable and long lasting cooling media. Following are sugges-
tions that will maximize the life and efficiency of the cooling pads.
• Port-A-Cool,LLC,recommendsthatthepH of the water be maintained at a level
between 6 and 8. Exceeding these limits will seriously deplete the resin content of the
pad and thus reduce its structural integrity.
• Removeandbrushpadswithasoftbristledbrushandthenflush system to remove
debris.Thisshouldbedoneevery4to6weeksduringoperatingseason.
• Aclean water distribution system is the most important
aspectformaintainingtheentireevaporativecoolingsystem.
This,coupledwithquarterlyinspection/maintenance
checks,willensureaproperlyoperatingevaporative
cooling system.
• Frequently check system for damaged or clogged cooling pads.
• Minimize the number of on/off wetting cycles for the
cooling pads.
• Completelydry the cooling padsonceevery24hours.
• Maintainawater bleed off rate of 3-5% per day.
• Ensuresumptankisenclosedandcleanedbi-weekly.
• Cleanwaterfiltersweekly.
(936) 598-5651 (800) 695-2942
P.O. Box 2167 Center, TX 75935 Fax (936) 598-6328 www.kuulpads.com [email protected]
Revised: August 27,2012
KÜÜL® pads are manufactured by Port-A-Cool, LLC in the U.S.A.
Algae Growth and Mineral Build-up:
Prevention Guide
Algae Growth
Algaewillgrowonanysurfacethatiswetandexposedtodirectsunlight.
Followingaresuggestionsthatwillaidinthepreventionofalgaegrowthonyour
KÜÜL® pads.
• Drythepadsatleastonceevery24hours.
• Keepthepadsandsumpshadedfromdirectsunlight.
• Useanalgaecide.
• Identifyandeliminatesourcesofnutrientsinthewater.
• Completelyflushsystemevery4to6weeksduringtheoperatingseason.
• DONOTusechlorineatlevelsthatexceed1ppm(partspermillion).
Mineral and Scale Build-up
Whenwaterhasahighmineralcontent,scaleandmineraldepositsform
throughoutthecoolingpad.Inordertoaidinthepreventionofmineralbuild-up
follow these tips:
• MaintainthewateratapHlevelbetween6and8.
• Avoidorminimizeon/offwettingcycles.
• Useadailywaterbleedoffrateof3-5%.
• Useamineralpreventionaid.
• Increasetheamountofwaterflowingoverthefaceofpads.
SETTING THE STANDARD IN EVAPORATIVE COOLING MEDIA
KÜÜL® evaporative cooling media is manufactured in the USA by Port-A-Cool, LLC
(936) 598-5651 (800) 695-2942
P.O. Box 2167 Center, TX 75935 Fax (936) 598-6328 www.kuulpads.com [email protected]
Revised: August 27, 2012
KÜÜL® pads are Manufactured by Port-A-Cool, LLC in the U.S.A.
  • Page 1 1
  • Page 2 2

PORTACOOL PARKULCYC200 User manual

Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI