AGI Field Fix Operating instructions

  • I've reviewed the provided document, which is a field fix instruction for the Westfield 13" MKX-Tend Transition. It details how to address potential leakage issues, especially at high angles, by installing a bolt-on sealing plate. I can answer questions about the installation process, required tools, and the purpose of this fix.
  • What is the issue this document is addressing?
    What is the solution described in this document?
    What tools are required to perform the fix?
Westfield | Wheatheart
part of the Ag Growth International group
P.O. Box 39, Rosenort, Manitoba, Canada R0G 1W0 Ph: (866) 467-7207 Fax: (866) 768-4852
Website: www.grainaugers.com | www.wheatheart.com Email: sales@grainaugers.com | sales@wheatheart.com
© Ag Growth International Inc. 2018
FIELD FIX INSTRUCTIONS 13” X-tend Transition Leaking
ECN ID#
3905
DATE
September 23, 2020
BRAND
Westfield
PRODUCT
13” MKX-Tend
MODEL
13” MKX-Tend
DATE RANGE
Up to Sept 23, 2020
SERIAL #
Up to WF02A392036789
DETAILS
On 13” X-tend transitions the lower face can potentially have an inadequate seal,
especially at high angles which can lead to product leakage. To remedy this, we have
created a bolt on sealing plate that can be added in the position outlined below. This
will reduce the leakage and allow the X-tend to operate normally.
TOOLS REQUIRED:
2x Wrench, ½”
5/16” x 1 ¼” bolt x2
5/16” nylon lock nut x2
Part # 201634
Area of potential leakage
2 | P a g e
INSTALLATION:
Step 1: Extend hopper cylinder about ¾ of
the way to allow clearance for
installing plate.
Step 2: Slide part # 201634 into position
above the cylinder and line up holes
with transition as shown.
Step 3: Bolt plate onto transition with bolts
facing away from hopper. Make sure
plate mounts flush and does not
have debris between plate and
transition
Step 4: Test hopper movement, ensure
nothing is binding and that the plate
seals properly against the hopper
and transition.
Sealing plate
Transition
Hopper
Exploded View:
To show relative part locations
/