IDC-S5-SR

Radiant IDC-S5-SR Operating instructions

  • I have reviewed the provided document, which pertains to the installation of S5-SR clips using S5! clamps. This instruction manual details the proper use of these clips for standing seam applications, including the number of clips to be used at different locations. I am ready to answer your questions about installation procedure.
  • How many SR-S5 clips should be used at the bottom of the pattern?
    How are SR-S5 clips attached to the S5! clips?
    How many SR-S5 clips should be used at the top of the pattern?
Heat Cable
Standing Seam
S5! Clamp
S5-SR Clip
a
a
Use two SR-S5 clips at the bottom of
the pattern and two at the top. Attach
SR-S5 clips to the S5! clips using the
bolts provided by S5!.
S5! Clamp
S5-SR Clip
IDC-S5-SR INSTRUCTIONS
Gutter
For more information, visit
radiantsolutionscompany.com v.10-21
Freeze
Protection
Products
SOLUTIONS COMPANY
RADIANT
Heat Cable
Standing Seam
a
a
a
Use two SR-S5 clips at the bottom of
the pattern and two at the top. Attach
SR-S5 clips to the S5! clips using the
bolts provided by S5!.
S5! Clamp
S5-SR Clip
IDC-S5-SR INSTRUCTIONS
Gutter
v.10-21
SOLUTIONS COMPANY
RADIANT
/