1
English
CONTENTS
III
VI-XIV
1
2 INSTALLATION
2. 1 VERIFYING THE SUITABILITY OF THE GATE AND ENVIRONMENT
2. 2 VERIFYING THE PRODUCT’S APPLICATION LIMITS
2. 3 PRODUCT TECHNICAL SPECIFICATIONS
2. 4 PRE-INSTALLATION WORKS 3
2. 5 INSTALLING THE ARIA GEARMOTORS (models 400C/600C) and CLB CONTROL UNIT (models 202/201) 4
4
201 4
2. 6 INSTALLING THE PHOTOCELLS model PH200 4
2. 7 INSTALLING THE FLASHING LIGHT model FL200 4
ELECTRICAL CONNECTIONS
3. 1 ELECTRICAL CONNECTION TO THE CONTROL PANEL
3.2 POWER SUPPLY CONNECTION
4 PROGRAMMING
4. 1 CONTROL UNIT KEYS
4. 2 INITIAL CHECKS
4. 3 MEMORISATION OF CONNECTED DEVICES
4. 4 SELECTING THE MOTOR TYPE
4. 5 MEMORISATION OF GATE LEAF OPENING AND CLOSING ANGLES
4. 6 MEMORISATION OF THE 1
ST
TRANSMITTER
4. 7 BASIC ADJUSTMENTS
4.
4.
5 TESTING AND COMMISSIONING
5.1 TESTING
5. 2 COMMISSIONING
MAINTENANCE
7
8
8. 1 ADVANCED ADJUSTMENTS
- D
. . Presence function
- D -
D - D
8. 2 ADDING OR REMOVING DEVICES
Memorising additional devices
8. 3 MEMORISING ADDITIONAL TRANSMITTERS
3.3
8. 4 DELETING THE MEMORY OF THE INDIVIDUAL TRANSMITTER FROM THE CONTROL UNIT’S MEMORY
8. 5 COMPLETE DELETION OF THE RADIO MEMORY
8. 6 INSTALLING THE BACK-UP BATTERY
8. 7 INSTALLING THE SOLAR POWER SYSTEM KIT model SOLEKIT
8. 8 DIAGNOSTICS AND DEVICE SIGNALS
8. 9 SPECIFICATIONS
Stop input
9
EC Declaration of Conformity
10 A