Florestone 3232-2-RH, 3232-2-LH, 4234-2-RH, 4834-1 BO, 4834-2-LH, 4834-2-RH, 6034-2-RH Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Florestone 3232-2-RH Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Exclusive Wedge-Lok
®
Seal
Florestone Saflor Shower Receptors come with an integral
drain molded into the receptor, eliminating the need for a
separate drain. The exclusive seal is easily installed without
special tools. No caulking, no mess, no places to leak. Drain
will also accept conventional lead joint.
2" I.P.S. Wedge-Lok
®
Seal fits plastic and steel only. For
copper waste, specify Josam Jiffy-Joint™ or equal. For
cast iron, Josam Jiffy-Joint™ or equal may be required
because of OD variance. Specify for copper or cast iron pipe.
Molded Receptors Installation Instructions
Florestone Saflor
®
Molded Receptors
Installation Instructions
Bottom
2851 Falcon Drive • Madera, CA 93637
T. 559.661.4171 T. 800.446.8827
F. 559.661.2070 florestone.com
Water Resistant Backing
Finished Wall Covering
Sub-Floor
5" dia., 2¼" recess in sub
oor
2" I.P.S., pipe pojects
1½" above sub
oor
1"
5½"
2⅞"
3½"
4¾"
READ BEFORE INSTALLATION
Improper Installation May Result
In Damage To Receptor
Ensure that Receptor is installed
by licensed professional
1 Integral drain requires minimum 5"
diameter by 2 ¼" deep recess in
sub-floor for adequate clearance.
2 Sub-floor MUST be flat and level and
free of movement and squeaks. Fix
any movement and squeaks prior to
installation of receptor.
3 Set shower receptor on sub-floor level
right to left and front to back. Bottom
of ALL receptor ribs must make
contact with sub-floor.
IF LEVELING SUB-FLOOR IS
REQUIRED, use a mortar mix. Apply an
appropriate layer of mortar to level the
sub-floor surface. Set the receptor in the
fresh mortar. Level the receptor right to
left and front to back with downward
pressure into the mortar (BOTTOM OF
ALL RECEPTOR RIBS MUST MAKE
CONTACT WITH MORTAR) using a
minimum 24" level. Allow mortar to
harden before further steps.
4 Install Wedge-Lok seal. Use soapy
water to lubricate seal and pipe.
5 Use large head nail or screw directly
above tiling flange to secure in place.
Do not nail or screw directly into
flange as it may cause cracking.
6 Water test receptor for proper
drainage upon connection of waste
pipe prior to installing walls.
/