Dural CI 30m B, CI 10m B, CI 5m B Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Dural CI 30m B Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Suboor Prep
You must begin with a dry and structurally sound suboor. If water damage, rotting, or any other
structural defects are present, you MUST repair prior to installing Durabase CI++. A clean and level
suboor is required for a successful installation. After cleaning the suboor, use a level to check the
suboor.
Note: a self-leveling mortar can be used to level the suboor.
Durabase CI++ Installation Guide
Step 2
Lay the Durabase CI++ white eece side down onto the fresh adhesive
and press down evenly with the at side of the trowel, a grout oat or a
carpet roller. Periodically check for full coverage. Only for
waterproong purposes use the DURABASE WP seam tape to cover the
junctions between the perimeter of the room and the mat.
Note: Thin-set mortar appropriate for the tile should be used on top of
the Durabase CI++. Please follow all installation instructions of the
TCNA handbook.
Step 1
Cut the Durabase CI++ mat to the required size with a utility knife. Use
a suitable thin-set mortar according to ANSI guidelines, using a trowel
with notches of approximately 4 mm (0.16 inch) in width. Apply the
adhesive evenly to the surface.
[email protected]800-278-1956
/