Montigo H38-DF Installation guide

Category
Fireplaces
Type
Installation guide

This manual is also suitable for

H38DF HL38DF
HR38DF HW38DF
Indoor
Resi
dential
Fireplace
ยฎ
C US
Read and understand this manual. Improper installation, adjustment, alteration,
service or maintenance can cause serious injury, property damage or even death.
For assistance or additional information consult a qualified installer, service
agency or the gas supplier.
DANGER
Glass doors on gas fireplaces are extremely hot while the fireplace is on and
remain hot even after the fireplace has been turned off. Safety screens are
available and can reduce the risks of severe burns. Please keep children away
from the fireplace at all times.
CAUTION
Installation & Maintenance Manual
Do not store or use gasoline or any other flammable vapors and liquids in the vicinity of
this or any other gas burning appliance. A fire or explosion my occur causing serious
injury, property damage or even death.
WARNING
Installer: Leave this manual with the appliance. Do not remove.
Consumer: Retain this manual for maintenance and future reference. Do not Discard.
NOTICE
IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch; do not use any phone in your building.
Immediately call your gas supplier from a neighbor's phone. Follow the gas
supplier's instructions.
If you cannot reach your gas supplier, call the fire department.
DANGER
Irritant
Cutting
Watch your step
Slippery floor
High temperatures
Glass hazard
Danger of suffocation
High voltage
Toxic
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Oxidising
Danger of death
Biohazard
Laser Radiation
Danger of entrapment
Hot surface
General Warning
Blank
Gas bottles
Watch for
falling objects
Electricity
Danger for cutter
Entrapment hazard
Battery hazard
Rotating parts
Low temperature
Strong magnetic field
Optical radiation
Non ionizing
radiation
Radiation
Hazardous to the
Environment
Danger of harming
your hands
Irritant
Cutting
Watch your step
Slippery floor
High temperatures
Glass hazard
Danger of suffocation
High voltage
Toxic
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Oxidising
Danger of death
Biohazard
Laser Radiation
Danger of entrapment
Hot surface
General Warning
Blank
Gas bottles
Watch for
falling objects
Electricity
Danger for cutter
Entrapment hazard
Battery hazard
Rotating parts
Low temperature
Strong magnetic field
Optical radiation
Non ionizing
radiation
Radiation
Hazardous to the
Environment
Danger of harming
your hands
Irritant
Cutting
Watch your step
Slippery floor
High temperatures
Glass hazard
Danger of suffocation
High voltage
Toxic
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Oxidising
Danger of death
Biohazard
Laser Radiation
Danger of entrapment
Hot surface
General Warning
Blank
Gas bottles
Watch for
falling objects
Electricity
Danger for cutter
Entrapment hazard
Battery hazard
Rotating parts
Low temperature
Strong magnetic field
Optical radiation
Non ionizing
radiation
Radiation
Hazardous to the
Environment
Danger of harming
your hands
Irritant
Cutting
Watch your step
Slippery floor
High temperatures
Glass hazard
Danger of suffocation
High voltage
Toxic
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Oxidising
Danger of death
Biohazard
Laser Radiation
Danger of entrapment
Hot surface
General Warning
Blank
Gas bottles
Watch for
falling objects
Electricity
Danger for cutter
Entrapment hazard
Battery hazard
Rotating parts
XG0147 011912.1
๎€ฆ๎„๎‘๎„๎‡๎Œ๎„๎‘๎€ƒ๎€ซ๎ˆ๎„๎—๎Œ๎‘๎Š๎€ƒ๎€ณ๎•๎’๎‡๎˜๎†๎—๎–๎€ƒ๎€ฌ๎‘๎†๎€‘๎€ƒLangley, BC V4W 4A ๎€ฐ๎’๎‘๎—๎Œ๎Š๎’๎€ƒ๎€ง๎ˆ๎๎€ƒ๎€ต๎„๎œ๎€ƒ๎€ฆ๎’๎•๎“๎€‘ Ferndale, WA 98248
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€•
You must read and understand this manual prior to installation, operation or
troubleshooting this appliance. Please retain this ownerโ€™s manual for furure reference
and maintenance.
NOTICE
Table of Contents
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
XG0147 - 011912
โ–ช Section 3-3-3: Heat Shields .......................................................16
โ–ช Installing a RHS8 W
all Mounted Heat Shield
........................16
โ–ช Installing a RHS101 Wall Mounted Heat Shield ....................16
Section 4: Wiring
..........................................................................17-18
โ–ช SIT - Nova 820 gas control and pilot .....................................17
โ–ช SIT
- Pro๎ƒ€ame gas control and pilot
......................................17
โ–ช Honeywell gas control and pilot ............................................17
โ–ช Installing remote On/Of
f wall switch
......................................18
โ–ช Installing HFK Fan Kit ............................................................18
Section 5: Installing the Gas Line
.........................................................19
Section 5-1: Fuel Conversion ................................................................19
Section 5-2: Gas Pressure ....................................................................19
Section 5-3: Gas Connection ................................................................19
Section 6: Finishing
..............................................................................20
Section 7:
Installing and Removing the Door .......................................21
Section 8: Installing the Accessories
.............................................22 - 25
โ–ช Installing the H38DF Log Set ................................................22
โ–ช Installing the HL38DF Firestones ..........................................23
โ–ช Installing the HR38DF Designer River Rocks........................24
โ–ช Installing the HW38DF Log Set .............................................25
Section 9:
Operation ......................................................................26 - 28
โ–ช Start-up Sequence with Continuous Pilot ..............................26
โ–ช Start-up Sequence SIT Pro๎ƒ€ame Gas valve..........................27
โ–ช Start-up Sequence with Honeywell Electronic Ignition .........28
Maintenance ........................................................................29 - 31
โ–ช General
...............................................................................29
โ–ช Cleaning ...............................................................................29
โ–ช Hi-Lo Burner
Adjustment
............................................................29
โ–ช Pilot Burner Adjustment .............................................................29
โ–ช
Troubleshooting
.........................................................................30
SIT- Nova 820 Gas Control Valve ............................................30
SIT
Pro๎ƒ€ame Electronic Gas Control Valve
.............................30
Honeywell Gas Control Valve ..................................................30
โ–ช Replacement Parts List ..............................................................31
Appendix
A. Termination Locations
.............................................................32
B. Warranty ...............................................................................33
C. State of Massachusetts. ..........................................................34
Introduction
.................................................................................3
Models
.................................................................................3
Installation
Before you Start
.................................................................................4
Installation Checklist ...........................................................................4
Section 1: Installation Overview and Product Dimensions
.....................5
Section 2:
Framing the Fireplace .......................................................6 - 7
Clearances
.................................................................................7
Installing the Standoffs .......................................................................7
Installing the Nailing Flange Extension ...............................................7
Section 3:
The Direct Vent System ..................................................8 - 14
Section 3-1: Converting from
Top Vent to Rear Vent
..............................8
โ–ช Section 3-2-1: Venting Layout ..........................................................8
Section 3-2: Installing a Roof mounted
Termination
.........................9 - 10
โ–ช Section 3-2-1: Venting Layout ..........................................................9
โ–ช Roof mounted
Terminations
Standard Top Vent (no elbows or offsets).......................................9
T
op Vent (two elbows one offset)
...................................................9
Top Vent (multi-elbows and offsets) ...............................................9
Standard Roof V
ent (one elbows no offsets)
................................10
Section 3-3: Installing a Wall mounted Termination .............................. 11
โ–ช Standard PT
O Installation
..................................................... 1
1
โ–ช Pre-installed MSR Frame ...................................................... 11
โ–ช Pre-installed BSR Frame ....................................................... 1
1
โ–ช Installing MOSR Frame ......................................................... 11
โ–ช Installing VSS
Termination Shield.......................................... 11
โ–ช Installing PTKOG Heat Guard ............................................... 11
โ–ช Section 3-3-1: V
enting Layout
....................................................12
โ–ช Top Vent, Wall mounted Graph, H*38DF ...............................12
โ–ช
Top Vent, Wall mounted termination (one elbow)
..................12
โ–ช Top Vent, Wall mounted termination (multi elbow) ................12
โ–ช
Top Vent, Wall mounted termination (45ยฐ corner)..................13
โ–ช Top Vent, Wall mounted termination (-45ยฐ corner) ................13
โ–ช Rear V
ent, Wall mounted Termination Graph
........................14
โ–ช Standard Rear Vent, (no elbows or offsets)...........................14
โ–ช Rear V
ent, Wall mounted termination (two elbows)
...............14
โ–ช Section 3-3-2: Venting Components ..........................................15
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€–
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Safety Alert Key
XG0147 -011912
Introduction
Indicates a hazardous situation which, if not
avoided, WILL result in death or serious
injury or property damage.
Indicates a hazardous situation which, if not
avoided, COULD result in death or serious
injury or property damage.
Indicates a hazardous situation which, if not
avoided, WILL result in minor or moderate
injury.
Address practices that are important, but
not related to personal injury
DANGER WARNING
CAUTION NOTICE
๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ
๎€บ๎€ค๎€ต๎€ฑ๎€ฌ๎€ฑ๎€ช
Hot glass will cause burns.
Do not touch glass until
unit is cooled. Never allow
children to touch glass.
Irritant
Cutting
Watch your step
Slippery floor
High temperatures
Glass hazard
Danger of suffocation
High voltage
Toxic
Flammable materials
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Oxidising
Danger of death
Biohazard
Laser Radiation
Danger of entrapment
Hot surface
General Warning
Blank
Gas bottles
Watch for
falling objects
Electricity
Danger for cutter
Entrapment hazard
Battery hazard
Rotating parts
Low temperature
Strong magnetic field
Optical radiation
Non ionizing
radiation
Radiation
Hazardous to the
Environment
Danger of harming
your hands
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€จ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฏ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€จ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€ฌ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ป ๎€•๎€˜๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€จ
๎€ป ๎€•๎€˜๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ป ๎€•๎€˜๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฏ
๎€ป ๎€•๎€˜๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€จ
๎€ป ๎€•๎€˜๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€ฌ
๎€ป ๎€•๎€˜๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ต๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€ต๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ป ๎€•๎€™๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ป ๎€–๎€—๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€จ
๎€ป ๎€–๎€—๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ป ๎€–๎€—๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฏ
๎€ป ๎€–๎€“๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€จ
๎€ป ๎€–๎€“๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€ฌ
๎€ป ๎€–๎€“๎€๎€“๎€“๎€“ ๎€ป ๎€ป
๎€ฐ๎€ฒ๎€ง๎€จ๎€ฏ
๎€ฑ๎„๎—๎˜๎•๎„๎๎€ƒ๎€ช๎„๎–
๎€ฏ๎Œ๎”๎˜๎Œ๎‡๎€ƒ๎€ณ๎•๎’๎“๎„๎‘๎ˆ
๎€ช๎„๎–๎€ƒ๎€ต๎„๎—๎Œ๎‘๎Š๎€ƒ
๎€‹๎€ฅ๎€ท๎€ธ๎€ƒ๎‹๎•๎€Œ
๎€ท๎•๎„๎‡๎Œ๎—๎Œ๎’๎‘๎„๎๎€ƒ๎€ฅ๎˜๎•๎‘๎ˆ๎•๎€ƒ๎€’
๎€ฏ๎’๎Š๎–๎ˆ๎—๎€ƒ
๎€ฆ๎’๎‘๎—๎ˆ๎๎“๎’๎•๎„๎•๎œ๎€ƒ
๎€ฅ๎˜๎•๎‘๎ˆ๎•๎€ƒ๎š๎€’๎€ต๎Œ๎™๎ˆ๎•๎€ƒ๎•๎’๎†๎Ž๎€ƒ
๎€ฏ๎Œ๎‘๎ˆ๎„๎•๎€ƒ๎€ฅ๎˜๎•๎‘๎ˆ๎•๎€ƒ๎š๎€’
๎€ช๎๎„๎–๎–๎€ƒ๎€ค๎†๎†๎ˆ๎–๎–๎’๎•๎Œ๎ˆ๎–
๎€บ๎Œ๎๎‡๎ƒ€๎•๎ˆ๎€ƒ๎€ฅ๎˜๎•๎‘๎ˆ๎•
๎š๎Œ๎—๎‹๎€ƒ๎€บ๎Œ๎๎‡๎ƒ€๎•๎ˆ๎€ƒ๎๎’๎Š๎–๎ˆ๎—
๎€ถ๎—๎„๎‘๎‡๎Œ๎‘๎Š๎€ƒ๎€ณ๎Œ๎๎’๎—
๎€ฌ๎Š๎‘๎Œ๎—๎Œ๎’๎‘
๎€ซ๎’๎‘๎ˆ๎œ๎š๎ˆ๎๎๎€ƒ๎€ซ๎’๎—
๎€ถ๎˜๎•๎‰๎„๎†๎ˆ๎€ƒ๎€ฌ๎Š๎‘๎Œ๎—๎Œ๎’๎‘
๎€ถ๎€ฌ๎€ท๎€ƒ๎€จ๎๎ˆ๎†๎—๎•๎’๎‘๎Œ๎†
๎€ฌ๎Š๎‘๎Œ๎—๎Œ๎’๎‘
Congratulations on your purchase of a ๎€ฐ๎’๎‘๎—๎Œ๎Š๎’๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ.
With over 30 years of experience, Montigo is committed to providing you
with a gas ๎‚ฟreplace that is not only a beautiful addition to your space, but
that is also designed and manufactured to the highest safety, reliability
and engineering standards.
We strongly encourage you to read and carefully follow the instructions
laid out in this Installation, Operation and Maintenance Manual and retain
it for your future reference. Pay special attention to all cautions, warnings,
and notices throughout this manual intended to ensure your safety.
This manual covers installation, operation and maintenance. Lighting,
operation and care of this ๎‚ฟreplace can be easily performed by the
homeowner. All installation and service work should be performed by
a quali๎‚ฟed or licensed installer, plumber or gas ๎‚ฟtter as certi๎‚ฟed by the
state, province, region or governing body where the ๎‚ฟreplace is being
installed.
This installation, operation and maintenance manual is applicable
to the models described below. Refer to your rating plate to verify
included options.
๎€บ๎„๎•๎•๎„๎‘๎—๎œ๎€ƒ๎€ฌ๎‘๎‰๎’๎•๎๎„๎—๎Œ๎’๎‘๎€๎€ƒ๎€‹๎€ถ๎ˆ๎ˆ๎€ƒ๎€ค๎“๎“๎ˆ๎‘๎‡๎Œ๎›๎€ƒ๎€ฅ๎€Œ
The Montigo warranty will be voided by, and Montigo disclaims any
responsibility for, the following actions:
โ–บ Modi๎‚ฟcation of the ๎‚ฟreplace and/or components including
Direct-Vent assembly or glass doors.
โ–บ Use of any component part not manufactured or approved
by Montigo in combination with this Montigo ๎‚ฟreplace system.
โ–บ Installation other than as instructed in this manual.
Consult your local Gas Inspection Branch on installation requirements
for factory-built gas ๎‚ฟreplaces. Installation & repairs should be done by
a quali๎‚ฟed contractor.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€—
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€ค๎€๎€ƒ๎€ฅ๎ˆ๎‰๎’๎•๎ˆ๎€ƒ๎€ผ๎’๎˜๎€ƒ๎€ถ๎—๎„๎•๎—
IMPORTANT MESSAGE: SAVE THESE INSTRUCTIONS
The ๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ Direct Vent ๎‚ฟreplace must be installed in accordance
with these Instructions. Carefully read all the Instructions in this manual
๎‚ฟrst. Consult the Local Gas Branch to determine the need for a permit
prior to starting the installation. It is the responsibility of the installer to
ensure this ๎‚ฟreplace is installed in compliance with the manufacturers
instructions and all applicable codes.
BEFORE YOU START:
๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎€ฆ๎‹๎ˆ๎†๎Ž๎๎Œ๎–๎—
๎‚„ Determine the desired install location of your ๎‚ฟreplace.
๎‚„ See ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€”, Dimensions on ๎€ณ๎„๎Š๎ˆ๎€ƒ๎€˜๎€ and refer to the Framing
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€• for details.
๎‚„ Select the location of your termination and resulting vent run.
๎€ƒ๎‚„ ๎€ผ๎’๎˜๎•๎€ƒ๎–๎ˆ๎๎ˆ๎†๎—๎ˆ๎‡๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ๎๎’๎†๎„๎—๎Œ๎’๎‘๎€ƒ๎๎˜๎–๎—๎€ƒ๎…๎ˆ๎€ƒ๎—๎‹๎ˆ๎€ƒ๎‹๎Œ๎Š๎‹๎ˆ๎–๎—๎€ƒ๎“๎’๎Œ๎‘๎—๎€ƒ
๎Œ๎‘๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ง๎Œ๎•๎ˆ๎†๎—๎€ƒ๎€น๎ˆ๎‘๎—๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘.
๎‚„ Should it be impossible to meet the venting requirements laid
out in ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–: Venting, please contact a local Montigo dealer
regarding the use of a Montigo Power Vent.
๎‚„ Lay out the Vent run; calculating the required elbows and straight
runs of 5"/8" flex or rigid pipe.
๎‚„ Layout Electrical Requirements Refer to ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€—๎€๎€ƒWiring, for
Details.
๎‚„ Refer to ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€˜๎€๎€ƒInstalling the Gas Line, for details on the
gas connection and access.
๎‚„ Refer to local codes and guidelines for installation requirements.
๎€ƒ๎‚„ ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ ๎„๎‘๎‡๎€ƒ ๎•๎ˆ๎“๎„๎Œ๎•๎–๎€ƒ ๎–๎‹๎’๎˜๎๎‡๎€ƒ ๎…๎ˆ๎€ƒ ๎‡๎’๎‘๎ˆ๎€ƒ ๎…๎œ๎€ƒ ๎„๎€ƒ ๎”๎˜๎„๎๎Œ๎ƒ€๎ˆ๎‡๎€ƒ
๎†๎’๎‘๎—๎•๎„๎†๎—๎’๎•๎€ƒ๎„๎‘๎‡๎€ƒ๎๎˜๎–๎—๎€ƒ๎†๎’๎‘๎‰๎’๎•๎๎€ƒ๎—๎’:
โ€ข๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎Œ๎‘๎€ƒ๎€ฆ๎„๎‘๎„๎‡๎„ must conform to the local codes or in the
absence of local codes to the current version of Natural Gas and Propane
Installation Code, CSA B149. Electrical Installations must conform to
the local codes or, in the absence of local codes, to the current version
of Canadian Electrical Code, CSA C22.1.1
โ€ข ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎Œ๎‘๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ธ๎€ถ๎€ค๎€ƒmust conform to the local codes or in
the absence of local codes to the current version of National Fuel Gas
Code, ANSI Z223.1/NFPA 54. Electrical Installations must conform to
the local codes or, in the absence of local codes, to the current version
of the National Electrical Code, ANSI/NFPA 70. See ๎€ค๎“๎“๎ˆ๎‘๎‡๎Œ๎›๎€ƒ๎€ฆ for
installation within the State of Massachusetts.
.
Due to high operating temperatures, this appliance should be located out of traffic &
away from furniture and draperies.
Children and adults should be alerted to the hazards of the high surface temperature,
which could cause burns or clothing ignition.
Young children should be carefully supervised when they are in the same room as the
appliance.
Clothing or other flammable materials should not be placed on or near the appliance.
CAUTION
When this appliance is installed directly on any combustible material other than wood
flooring, it must be installed on a metal or wood panel extending the full width and
depth of the appliance or a fire will occur causing serious injury, property damage or
even death.
DANGER
Installation and repairs should be done by an authorized gas fireplace service technician.
The appliance should be inspected before use and at least annually by a professional. More
frequesnt cleaning may be required due to exessive lint from carpeting, bedding material,
etc. It is imperative that control compartments, burners and circulating air passageways of
the fireplace are kept clean.
๎€ฑ๎€ฒ๎€ท๎€ฌ๎€ฆ๎€จ
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€˜
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€”๎€๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎€ฒ๎™๎ˆ๎•๎™๎Œ๎ˆ๎š๎€ƒ๎€‰๎€ƒ๎€ณ๎•๎’๎‡๎˜๎†๎—๎€ƒ๎€ง๎Œ๎๎ˆ๎‘๎–๎Œ๎’๎‘๎–๎€ƒ
Please review the Installation Checklist on Page 4 for general information
on preparing for a successful installation of your ๎‚ฟreplace.
The ๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ ๎‚ฟreplace may be installed in any location that maintains
proper clearances to air conditioning ducts, electrical wiring and plumbing.
Safety, as well as ef๎‚ฟciency of operation, should be considered when
selecting the ๎‚ฟreplace location. Select a location that does not interfere
with room traf๎‚ฟc, has adequate ventilation and offers an accessible path
for Direct Vent installation.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€‘๎€ƒ๎€ƒFireplace dimensions (Tolerance ยฑ โ…›").
*36ยฝ" for HW38DF*
๎€ท๎‹๎ˆ๎€ƒ๎ƒ€๎•๎ˆ๎“๎๎„๎†๎ˆ๎€ƒ๎‡๎Œ๎๎ˆ๎‘๎–๎Œ๎’๎‘๎–๎€ƒ๎„๎•๎ˆ๎€ƒ๎–๎‹๎’๎š๎‘๎€ƒ๎…๎ˆ๎๎’๎š๎€
18ยฝโ€
25โ€
11ยฝโ€
C
L
8โ€
5โ€
1โ€
Top View
6ยผ"
5ยผ"
25"
(Opening)
3
6ยฝ"
1ยผ"
1"
35ยผ"
(Opening)
1ยผ"1ยผ"
37ยพ"
Fr
o
n
t
Vi
e
w
*35ยพ"
5"
8"
28ยพ"
18ยฝ"
S
i
de
Vi
e
w
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€™
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€•๎€๎€ƒ๎€ฉ๎•๎„๎๎Œ๎‘๎Š๎€ƒ
1). Frame in the enclosure for the unit with framing materials. The
framed opening for the assembled H*38DF* ๎‚ฟreplace is 37 3/4" wide,
x 42" high x 21โ…›" deep. For assembled HW38DF* ๎‚ฟreplace is 37 3/4"
wide, x 42" high x 22โ…›" deep , see Figure 2
.
๎€ฑ๎€ฒ๎€ท๎€จ๎€๎€ƒWhen constructing the framed opening, please ensure there is
access to install the gas line when the unit is installed. See๎€ƒ๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€•๎€”๎€‘
* When sheetrock is not used behind
the ๎‚ฟreplace, framing depth "O" may be
reduced by 5/8".
0" clearance
to corners only
Pโ€
Nโ€
Qโ€
Nโ€
Mโ€
Oโ€
Figure 5. Non Combustible Framing for Top Vent or Rear Vent, with Alcove
ABOVE FIREPLACE.
* 3" minimum for HW38DF.
Figure 2. Framing dimensions.
Figure 4. Combustible Framing for shelves over the ๎‚ฟreplace, Top vent.
* 3" minimum for HW38DF
Figure 3. Combustible Framing for shelves over the ๎‚ฟreplace, Rear vent
* 3" minimum for HW38DF.
๎€ฐ ๎€ฑ ๎€ฒ ๎€ณ ๎€ด ๎€ต ๎€ถ ๎€ท
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ
42 37 3/4 21 1/8 62 43 7/8 N/A 35 3/4 46
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ
42 37 3/4 22 1/8 62 43 7/8 N/A 36 1/2 46
M
9โ€
S
2
8 3/4โ€
18โ€
max.
2โ€
min.*
Combustible
Header
Combustible
Shelf
Non-Combustible
Nailing Flange,
(supplied) figure 7
.
Exterior
Wall
46โ€
PEL Shor t
90ยฐ elbow
M
17 1/2โ€
2โ€ min
.*
Combustible
Header
Combustible
Shelf
Non-Combustible
Nailing Flange,
(supplied) figure 7.
Exterior
Wall
Min.
84โ€
12โ€
door
opening
3โ€
Rear
Vent
Ceiling level
Floor
Top Vent
18โ€
max.
2โ€
min.*
Min 1โ€
Non-Combustible
Header
Non-Combustible
materials. Alcove
over fireplace.
28 3/4โ€
Exterior
Wall
Non-Combustible
Nailing Flange,
(supplied) figure 7
.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€š
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
6โ€
๎€ฆ๎๎ˆ๎„๎•๎„๎‘๎†๎ˆ๎–๎€ƒ
When installing a shelf over the top of the ๎‚ฟreplaces, the following
guidelines must be adhered to:
For Rear Vent applications, the minimum clearance is 2" from the rear
of the ๎‚ฟreplace to a wall, or any combustible materials, and 9" clearance
from the top of the ๎‚ฟreplace to the underside of any combustible shelf
materials.
For Top Vent applications, the minimum clearance is 2" from the rear of
the ๎‚ฟreplace to a wall, or any combustible materials, and 17 1/2" to the
underside of any combustible shelf materials, Figure 4.
For Top or Rear Vent applications where the Minimum mantel height
is required above the ๎‚ฟreplace, (for an alcove or low pro๎‚ฟle shelf), ALL
Materials ๎€ฐ๎€ธ๎€ถ๎€ท๎€ƒ ๎€ฅ๎€จ๎€ƒ ๎€ฑ๎€ฒ๎€ฑ๎€๎€ฆ๎€ฒ๎€ฐ๎€ฅ๎€ธ๎€ถ๎€ท๎€ฌ๎€ฅ๎€ฏ๎€จ, Figure 5. The minimum
clearance is 2" from the rear of the ๎‚ฟreplace to a wall, or any combustible
materials.
1โ€ clearance is maintained on sides and bottom of vent runs and 2โ€
above horizontal vent runs to any combustible material.
The ๎‚ฟreplace clearances are shown below:
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ ๎€œ ๎€”๎€š๎€ƒ๎€”๎€’๎€• ๎€• ๎€” ๎€“ ๎€—
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ ๎€œ ๎€”๎€š๎€ƒ๎€”๎€’๎€• ๎€– ๎€” ๎€“ ๎€—
๎€ฐ๎€ฒ๎€ง๎€จ๎€ฏ
๎€ท๎’๎“๎€ƒ๎€๎€ƒ๎€ต๎ˆ๎„๎•๎€ƒ๎€น๎ˆ๎‘๎—โ€ 
๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ๎€ท๎‹๎ˆ๎€ƒ๎€ถ๎—๎„๎‘๎‡๎’๎‰๎‰๎–
๎€ท๎’๎€ƒ ๎„๎™๎’๎Œ๎‡๎€ƒ ๎ˆ๎๎ˆ๎™๎„๎—๎ˆ๎‡๎€ƒ ๎๎„๎‘๎—๎ˆ๎๎€ƒ ๎—๎ˆ๎๎“๎ˆ๎•๎„๎—๎˜๎•๎ˆ๎–๎€๎€ƒ ๎„๎๎๎€ƒ ๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€๎€ƒ ๎Š๎„๎–๎€ƒ
๎ƒ€๎•๎ˆ๎“๎๎„๎†๎ˆ๎–๎€ƒ๎„๎•๎ˆ๎€ƒ๎•๎ˆ๎”๎˜๎Œ๎•๎ˆ๎‡๎€ƒ๎—๎’๎€ƒ๎‹๎„๎™๎ˆ๎€ƒ๎—๎‹๎ˆ๎€ƒ๎–๎˜๎“๎“๎๎Œ๎ˆ๎‡๎€ƒ๎–๎—๎„๎‘๎‡๎’๎‰๎‰๎–๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎ˆ๎‡๎€‘๎€ƒ
The ๎‚ฟreplace is supplied with two standoffs. Bend and install these
standoffs on top of the ๎‚ฟreplace ensuring that the height of the standoff
maintains a 6" clearance.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€™๎€‘ Installing the standoff's.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€š๎€‘ Installing the Nailing Flange Extension.
๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ฑ๎„๎Œ๎๎Œ๎‘๎Š๎€ƒ๎€ฉ๎๎„๎‘๎Š๎ˆ๎€ƒ๎€จ๎›๎—๎ˆ๎‘๎–๎Œ๎’๎‘
Once the ๎‚ฟreplace is placed into the rough framed opening, the supplied
Nailing Flange Extention(Part No. ๎€ซ๎€–๎€›๎€“๎€š๎€—) must be fasten securely into
place, with nails or wood screws. as shown in Figure 7.
๎€ฑ๎’๎—๎ˆ๎€ The nailing ๎ƒ€ange extension can be substituted with a piece of
๎€ฑ๎€ฒ๎€ฑ๎€๎€ฆ๎’๎๎…๎˜๎–๎—๎Œ๎…๎๎ˆ material of the same size and thermal characteristics,
ie: cement board or equivalent. This is recommended in applications
where the facing materials will not adhere to the metal nailing ๎ƒ€ange.
6"
โ€  ๎€ฑ๎’๎—๎ˆ๎€ Clearance from top of ๎‚ฟreplace to a combustible ceiling within
the ๎‚ฟreplace enclosure.
๎€ท๎’๎“๎€ƒ๎€๎€ƒ๎€ท๎’๎“๎€ƒ๎€น๎ˆ๎‘๎—โ€ 
๎€ต๎ˆ๎„๎•
๎€ถ๎Œ๎‡๎ˆ๎–๎€ƒ
๎€ฉ๎๎’๎’๎•
๎€ฐ๎„๎‘๎—๎ˆ๎
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€›
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€ƒ๎€น๎ˆ๎‘๎—๎Œ๎‘๎Š๎€ƒ
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€›๎€‘๎€ƒFlue cover and collar removal, Top Vented ๎‚ฟreplace.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€›๎„๎€‘๎€ƒFlue cover and collar installation, Rear Vented ๎‚ฟreplace.
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€”๎€ ๎€ƒ๎€ฆ๎€ฒ๎€ฑ๎€น๎€จ๎€ต๎€ท๎€ฌ๎€ฑ๎€ช๎€ƒ๎€ท๎€ฒ๎€ƒ๎€ต๎€จ๎€ค๎€ต๎€ƒ๎€น๎€จ๎€ฑ๎€ท
Use the following instructions to convert an ๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ for Rear Vent use:
1. Remove the Rear ๎ƒ€ue cover and gasket (5" and 8") on the ๎ƒ€ue
outlet, as shown in Figure 8.
2. Next, Remove the Top ๎ƒ€ue collar's (5" and 8") on the ๎ƒ€ue outlet,
as shown in Figure 8.
3. Install the (removed) Rear ๎ƒ€ue cover and gasket material, to the
Top vent outlet. Fasten the cover with included hardware, as
illustrated Figure 8a.
4. Install the (5" and 8") collars to the rear vent outlet using the
included hardware, as illustrated Figure 8a.
5โ€ Inner Flue Collar
8โ€ Outer Flue Collar
Flue Gasket
Flue Cover Plate
8โ€ Outer Flue Collar
5โ€ Inner Flue Collar
Flue Gasket
Flue Cover Plate
Montigo supplies a variety of direct venting and termination options.
๎€ท๎‹๎ˆ๎€ƒ๎‡๎Œ๎•๎ˆ๎†๎—๎€ƒ๎™๎ˆ๎‘๎—๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ๎๎’๎†๎„๎—๎Œ๎’๎‘๎€ƒ๎€ฐ๎€ธ๎€ถ๎€ท๎€ƒ๎…๎ˆ๎€ƒ๎–๎ˆ๎๎ˆ๎†๎—๎ˆ๎‡๎€ƒ๎–๎˜๎†๎‹๎€ƒ๎—๎‹๎„๎—๎€ƒ
๎Œ๎—๎€ƒ๎Œ๎–๎€ƒ๎—๎‹๎ˆ๎€ƒ๎‹๎Œ๎Š๎‹๎ˆ๎–๎—๎€ƒ๎“๎’๎Œ๎‘๎—๎€ƒ๎Œ๎‘๎€ƒ๎—๎‹๎ˆ๎€ƒ๎™๎ˆ๎‘๎—๎Œ๎‘๎Š๎€ƒ๎„๎–๎–๎ˆ๎๎…๎๎œ๎€‘ It should also be
selected such that it provides the shortest vent run possible. Should it
be impossible to ensure that the termination is the highest point or to
meet the venting guidelines laid out below please contact your Montigo
dealer to discuss power venting options.
๎€ฑ๎€ฒ๎€ท๎€จ๎€ถ๎€ƒ๎€ฉ๎€ฒ๎€ต๎€ƒ๎€ณ๎€ฏ๎€ค๎€ฑ๎€ฑ๎€ฌ๎€ฑ๎€ช๎€ƒ๎€น๎€จ๎€ฑ๎€ท๎€ฌ๎€ฑ๎€ช๎€
๎‚„ Venting originates from the unit through the top or through the rear
๎‚„ Venting can terminate through the roof or through an exterior wall.
๎‚„ Refer to ๎€ค๎“๎“๎ˆ๎‘๎‡๎Œ๎›๎€ƒ ๎€ค - Termination Locations to ensure the
planned termination location is acceptable.
๎‚„ Once the termination location has been established, refer to the
appropriate section below for installation details
๎‚„ All ๎‚ฟreplaces shipped from the factory are Top vent.
๎€ฑ๎€ฒ๎€ท๎€จ๎€๎€ƒ๎€ƒAir Baf๎ƒ€e is shipped open. If you are top venting, the air baf๎ƒ€e
should be closed following these steps:
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€”๎€๎€•๎€ ๎€ƒ๎€ค๎€ฌ๎€ต๎€ƒ๎€ฅ๎€ค๎€ฉ๎€ฉ๎€ฏ๎€จ๎€ƒ๎‰๎’๎•๎€ƒ๎€ซ๎€–๎€›๎€ง๎€ฉ๎€๎€ƒ๎€‰๎€ƒ๎€ซ๎€ต๎€–๎€›๎€ง๎€ฉ๎€๎€ƒ๎€ฒ๎€ฑ๎€ฏ๎€ผ
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€›๎…๎€‘๎€ƒAir Baf๎ƒ€e in Open position
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€›๎†๎€‘๎€ƒPull the air baf๎ƒ€e forward as far as possible and screw the air baf๎ƒ€e
closed.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€›๎‡๎€‘๎€ƒAir baf๎ƒ€e in closed position
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€œ
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€œ๎€‘. Top vent, Roof mounted termination with no offset in vent run.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€œ๎„๎€‘ Top vent, Roof mounted with 1 offset (1 offset= two 90ยฐ bends).
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€œ๎…๎€‘ Top vent, Roof mounted with 2 offsets (1 offset= two 90ยฐ bends).
๎€ต๎’๎’๎‰๎€ƒ๎๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎€ท๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎–
The following details are some possible con๎‚ฟgurations for Roof mounted
terminations.
Support ring
Support plate
Firestop
32โ€™ max.
2โ€™ min.
PVTK1
Termination
Support ring
Support plate
Firestop
32โ€™ max.
2โ€™ min.
Obstacle
PVTK1
Termination
Support straps or
support plate & ring
2โ€™ min.
Firestop
Firestop
2โ€™
Firestop
3
2โ€™ max
Support plate
& ring
Obstacle
PVTK1
Termination
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ ๎€–๎€๎€•๎€๎€ƒ ๎€ƒ ๎€ฌ๎€ฑ๎€ถ๎€ท๎€ค๎€ฏ๎€ฏ๎€ฌ๎€ฑ๎€ช๎€ƒ ๎€ค๎€ƒ ๎€ต๎€ฒ๎€ฒ๎€ฉ๎€ƒ ๎€ฐ๎€ฒ๎€ธ๎€ฑ๎€ท๎€จ๎€ง๎€ƒ ๎€ง๎€ฌ๎€ต๎€จ๎€ฆ๎€ท๎€ƒ ๎€น๎€จ๎€ฑ๎€ท๎€ƒ
๎€ท๎€จ๎€ต๎€ฐ๎€ฌ๎€ฑ๎€ค๎€ท๎€ฌ๎€ฒ๎€ฑ๎€ƒ๎€‹๎€ณ๎€น๎€ท๎€ฎ๎€๎€”๎€Œ
๎€ท๎‹๎Œ๎–๎€ƒ๎–๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎„๎“๎“๎๎Œ๎ˆ๎–๎€ƒ๎—๎’๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎š๎‹๎ˆ๎•๎ˆ๎€ƒ๎—๎‹๎ˆ๎€ƒ๎‡๎Œ๎•๎ˆ๎†๎—๎€ƒ๎™๎ˆ๎‘๎—๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ
๎š๎Œ๎๎๎€ƒ๎…๎ˆ๎€ƒ๎•๎’๎’๎‰๎€ƒ๎๎’๎˜๎‘๎—๎ˆ๎‡๎€‘
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€•๎€๎€”๎€๎€ƒ๎€ƒ๎€น๎€จ๎€ฑ๎€ท๎€ฌ๎€ฑ๎€ช๎€ƒ๎€ฏ๎€ค๎€ผ๎€ฒ๎€ธ๎€ท
๎€ถ๎ˆ๎๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ ๎’๎‰๎€ƒ ๎†๎’๎๎“๎’๎‘๎ˆ๎‘๎—๎–๎€ƒ ๎„๎‘๎‡๎€ƒ ๎‡๎ˆ๎—๎„๎Œ๎๎–๎€ƒ ๎’๎‰๎€ƒ ๎™๎ˆ๎‘๎—๎Œ๎‘๎Š๎€ƒ ๎๎„๎œ๎€ƒ ๎’๎˜๎—๎€ƒ ๎–๎‹๎’๎˜๎๎‡๎€ƒ
๎„๎‡๎‹๎ˆ๎•๎ˆ๎€ƒ๎—๎’๎€ƒ๎—๎‹๎ˆ๎€ƒ๎‰๎’๎๎๎’๎š๎Œ๎‘๎Š๎€ƒ๎Š๎˜๎Œ๎‡๎ˆ๎๎Œ๎‘๎ˆ๎–๎€
๎‚„ The maximum termination point is 32โ€™ above the ๎‚ฟreplace (NOTE:
if the maximum termination height is used, the ๎ƒ€ame pattern
may be affected).
๎‚„ The Vertical termination must be a minimum 2โ€™ higher than where
the termination exits the roo๎‚ฟng materials, (asphalt shingles,
cedar shakes, etc). This distance should be measured from the
high side of the roof slope where the ๎ƒ€ue ๎ƒ€ashing intersects the
roo๎‚ฟng materials. (see Figures 9 to 9c).
๎‚„ Termination location must be a minimum 6โ€™ from a mechanical
air inlet.
๎‚„ Termination location must be a minimum 18โ€ from a parapet wall
๎‚„ For a more detailed diagram of allowed termination locations,
see ๎€ค๎“๎“๎ˆ๎‘๎‡๎Œ๎›๎€ƒ๎€ค. .
๎‚„ A maximum of two offsets (each offset is made up of 2-90ยฐ
bends) may be made.
๎‚„ Firestops must be installed as required by National & local codes.
๎‚„ Ensure all runs are supported with a minimum of 3 supports
per 10โ€™ of venting.
๎‚„ Install all roof ๎ƒ€ashing and storm collars as shown.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€“
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€œ๎†๎€‘ Rear vent, Roof mounted venting (1 = 90ยฐ bend).
Support ring
Support plate
32โ€™ max
P
VTK1
Termination
18โ€
Max.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€”
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
1
12โ€
2โ€
1
2โ€
12โ€
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€–๎€๎€ƒ๎€ƒ๎€ฌ๎€ฑ๎€ถ๎€ท๎€ค๎€ฏ๎€ฏ๎€ฌ๎€ฑ๎€ช๎€ƒ๎€ค๎€ƒ๎€บ๎€ค๎€ฏ๎€ฏ๎€ƒ๎€ฐ๎€ฒ๎€ธ๎€ฑ๎€ท๎€จ๎€ง๎€ƒ๎€ง๎€ฌ๎€ต๎€จ๎€ฆ๎€ท๎€ƒ๎€น๎€จ๎€ฑ๎€ท๎€ƒ
๎€ท๎€จ๎€ต๎€ฐ๎€ฌ๎€ฑ๎€ค๎€ท๎€ฌ๎€ฒ๎€ฑ๎€ƒ
๎€ท๎‹๎Œ๎–๎€ƒ๎–๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎„๎“๎“๎๎Œ๎ˆ๎–๎€ƒ๎—๎’๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎š๎‹๎ˆ๎•๎ˆ๎€ƒ๎—๎‹๎ˆ๎€ƒ๎‡๎Œ๎•๎ˆ๎†๎—๎€ƒ๎™๎ˆ๎‘๎—๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ
๎š๎Œ๎๎๎€ƒ๎…๎ˆ๎€ƒ๎š๎„๎๎๎€ƒ๎๎’๎˜๎‘๎—๎ˆ๎‡๎€‘
1). Installation of Termination with built in frame
A Termination with a Built-In Frame is installed during
framing of a structure.
1. Frame the termination opening to 11" x 11".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of 4 screws.
MSR Frame
PTO-4 (5"/8")
Termination
PTO-4F (5"/8")
Termination
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€“๎€‘ Installing a PTO-F termination.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€“๎„๎€‘ Installing a PTO termination with the MSR frame.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€“๎‡๎€‘ Installing the VSS Vinyl Shield.
๎€˜๎€Œ๎€‘๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎’๎‰๎€ƒ๎„๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ๎–๎‹๎Œ๎ˆ๎๎‡๎€ƒ๎‰๎’๎•๎€ƒ๎€น๎Œ๎‘๎œ๎๎€ƒ๎€ถ๎Œ๎‡๎Œ๎‘๎Š
The VSS Termination shield is installed when the exterior of a structure
is clad with Vinyl siding. It is placed directly above, and on-center with
the termination.
๎€•๎€Œ๎€‘๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎’๎‰๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ๎‰๎•๎„๎๎ˆ๎€ƒ๎„๎—๎€ƒ๎—๎Œ๎๎ˆ๎€ƒ๎’๎‰๎€ƒ๎‰๎•๎„๎๎Œ๎‘๎Š
Terminations with a MSR frame allow the installation of the frame prior
to installation of the termination.
1. Frame the termination opening to 12" x 12".
2. Secure the MSR Frame to the exterior sheathing of the structure.
3. Fasten the termination to the MSR Frame using a minimum of 4 screws.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€“๎…๎€‘ Installing a PTO termination with the BSR frame.
๎€–๎€Œ๎€‘๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎’๎‰๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ๎‰๎•๎„๎๎ˆ๎€ƒ๎„๎—๎€ƒ๎—๎Œ๎๎ˆ๎€ƒ๎’๎‰๎€ƒ๎‰๎•๎„๎๎Œ๎‘๎Š๎€ƒ๎Œ๎‘๎€ƒ๎€ฐ๎„๎–๎’๎‘๎•๎œ
Terminations with a BSR frame allow the installation of the frame in
masonry prior to the installation of the termination
1. Frame the BSR opening to 12" x 12".
2. Secure the BSR Frame to the exterior sheathing of the structure.
1. Frame the MOSR opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs, concrete,
or ๎‚ฟnished wall construction using a minimum of 4 screws.
3. Insert the termination into the MOSR frame as shown here, (from
the inside) and attach to the MOSR by installing a min. quantity of 4
bolts into the threaded nuts on the MOSR Frame.
๎€—๎€Œ๎€‘๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎’๎‰๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€ƒ๎‰๎•๎’๎๎€ƒ๎Œ๎‘๎–๎Œ๎‡๎ˆ๎€ƒ๎–๎—๎•๎˜๎†๎—๎˜๎•๎ˆ
A Termination with a MOSR Frame is installed from the inside of the
structure. These are commonly used in high-rise construction.
MOSR Frame
PTO-4 (5"/8")
Termination
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€“๎†๎€‘ Installing a PTO termination with the MOSR frame.
BSR Frame
PTKOG (5"/8")
๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ ๎€ซ๎ˆ๎„๎—๎€ƒ ๎€ช๎˜๎„๎•๎‡๎–๎€ƒ ๎’๎™๎ˆ๎•๎€ƒ ๎€ท๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎– is recommended in
installations where the termination is located within 7' feet above
grade, or above a pedestrian walkway, and may be Required by code
in Public areas.
1. Ensure that the two long๎€ƒmounting brackets are facing the bottom
of the termination. (See inset). This will provide more heat protection at
the top of the termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four sheet metal
screws.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€”๎€‘ Installing a PTO termination heat guard.
1
1โ€
11โ€
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
PTO-4 (5"/8")
Termination
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
12โ€
12โ€
Fastening Hardware,
minimum 4-screws
Framing, con-
crete or other
materials
Exterior Sheath-
ing, concrete or
other materials
Exterior Vinyl
siding
PTO-4 (5"/8")
Termination
VSS Vinyl shield
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€•
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
42โ€
46โ€
A
C
B
If your installation does not fall within
the venting graph para- meters,
please contact a local Montigo dealer
for Power Venting options.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€•๎€‘ H*38DF* Top Vent Venting Graph for wall mounted terminations.
The Venting Graph
Measure the vertical height from the ๎‚ฟreplace hearth to the centre of the
termination and the horizontal run from the ๎‚ฟreplace ๎ƒ€ue collar to the wall
๎ƒ€ange of the termination. Plot on the Venting Graph Figure 12 with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the
installation is acceptable.
๎€จ๎›๎„๎๎“๎๎ˆ๎€ƒ๎€ค๎€๎€ƒ๎€‹๎€ค๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€Œ
If the vertical dimension from the hearth is 114" and the horizontal
run to the wall ๎ƒ€ange of the vent termination is 168", this would be
an acceptable installation.
๎€จ๎›๎„๎๎“๎๎ˆ๎€ƒ๎€ฅ๎€๎€ƒ๎€‹๎€ธ๎‘๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€Œ
If the vertical dimension from the hearth is 48" and the horizontal
run to the wall ๎ƒ€ange of the vent termination is 72", this would be
๎š๎’๎˜๎๎‡๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ๎…๎ˆ๎€ƒ๎„๎‘ acceptable installation.
๎€จ๎›๎„๎๎“๎๎ˆ๎€ƒ๎€ฆ๎€๎€ƒ๎€‹๎€ธ๎‘๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€Œ
If the vertical dimension from the ๎ƒ€oor of the ๎‚ฟreplace is 60" and
the horizontal run to the wall ๎ƒ€ange of the vent termination is 144",
๎—๎‹๎Œ๎–๎€ƒ๎š๎’๎˜๎๎‡๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ๎…๎ˆ๎€ƒ๎„๎‘๎€ƒ๎€ƒ๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€‘
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€–๎€๎€”๎€๎€ƒ๎€ƒ๎€น๎€จ๎€ฑ๎€ท๎€ฌ๎€ฑ๎€ช๎€ƒ๎€ฏ๎€ค๎€ผ๎€ฒ๎€ธ๎€ท๎€๎€ƒ๎€บ๎„๎๎๎€ƒ๎๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎—๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎€‘
๎€ถ๎ˆ๎๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎’๎‰๎€ƒ๎†๎’๎๎“๎’๎‘๎ˆ๎‘๎—๎–๎€ƒ๎„๎‘๎‡๎€ƒ๎‡๎ˆ๎—๎„๎Œ๎๎–๎€ƒ๎’๎‰๎€ƒ๎™๎ˆ๎‘๎—๎Œ๎‘๎Š๎€ƒ๎๎„๎œ๎’๎˜๎—๎€ƒ๎–๎‹๎’๎˜๎๎‡๎€ƒ๎„๎‡๎‹๎ˆ๎•๎ˆ๎€ƒ
๎—๎’๎€ƒ๎—๎‹๎ˆ๎€ƒ๎‰๎’๎๎๎’๎š๎Œ๎‘๎Š๎€ƒ๎Š๎˜๎Œ๎‡๎ˆ๎๎Œ๎‘๎ˆ๎–๎€
๎‚„ Vent terminations must not be recessed in walls or siding.
๎‚„ All through-theโ€“wall terminations within 3โ€™ of the ๎‚ฟreplace must
have a Montigo Heat Shield (RHS101) installed. See ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ
๎€–๎€๎€–๎€๎€–.
๎‚„ All through-the-wall terminations beyond 3' of the ๎‚ฟreplace must
have a Montigo Heat Shield (RHS8) installed. See ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€–๎€๎€–.
๎‚„ Once the proposed venting layout has been determined refer to
Figure 12 or 14 to ensure the layout is acceptable.
๎€ฑ๎’๎—๎ˆ๎–๎€ƒ๎€บ๎„๎๎๎€ƒ๎€ฐ๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎€ท๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎–๎€ Top Vent
๎‚„ All measurements for vertical or horizontal runs are measured
from centre of the vent pipe.
๎‚„ Venting runs must fall within the limits set by the venting graph,
see Figure 12.
๎€บ๎„๎๎๎€ƒ๎๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎€ท๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎–
The following details are some possible con๎‚ฟgurations for Wall
mounted terminations.
Unacceptable vent run
within shaded area.
Acceptable vent run
within non-shaded area.
42"
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€•๎„๎€‘ Top Vented, wall mounted installation with one 90ยฐ bend. The vent
run must comply with Venting Graph for Top vent, wall mounted terminations,
Figure 12.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€•๎…. Top Vented, wall mounted Multi-elbow installation. See Venting
Graph for Top vent, wall mounted terminations, Figure 12.
RHS8 Heat
Shield
Termination
Hearth
Exterior
Wall
42โ€Min. Rigid
46โ€Min. Flex
42โ€ Max.
Flex section
shown
Solid Section
Flex Section
Hearth
30โ€min
15โ€™foot Max.
RHS8 Heat
Shield
Termination
Exterior
Wall
8' MIN
at MAX
horizontal
WARNING:
An inspection of the explosion relief ๎ƒ€appers and door
๎€ฐ๎€ธ๎€ถ๎€ท be made prior to lighting the ๎‚ฟreplace. Faulty seal
on the door gasket and/or explosion ports will result in
products of combustion leaking into the living space and
may result in carbon monoxide poisoning.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€–
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€–๎€‘ Corner installation. (NG Models Only)
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€–๎„๎€‘ Flex installation. (NG Models Only)
๎€ƒ ๎€—๎€˜๎‚ƒ๎€ƒ๎€ฆ๎’๎•๎‘๎ˆ๎•๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€‘
Attach an PEL-45 (45ยฐ elbow) directly onto the ๎ƒ€ue collar. Cut the
PXT-20 to suit, and attach it to the PEL-45. Slide the ๎‚ฟreplace into
position and attach to the termination.๎€ƒ
๎€ƒ ๎€—๎€˜๎‚ƒ๎€ƒ๎’๎•๎€ƒ๎๎ˆ๎–๎–๎€ƒ๎€ฆ๎’๎•๎‘๎ˆ๎•๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€‘
Use an PTO-4 termination and an PFL-1 or PFL-2/PFL-2 (12" or 24"
compressed length) and a frame, if appropriate.๎€ƒFlex may be turned
to obtain desired degree of angle required but must not exceed 45ยฐ.
๎€ƒ ๎€ฑ๎’๎—๎ˆ๎€๎€ƒ๎€ท๎‹๎•๎’๎˜๎Š๎‹๎€ƒ๎—๎‹๎ˆ๎€ƒ๎š๎„๎๎๎€ƒ๎™๎ˆ๎‘๎—๎Œ๎‘๎Š๎€ƒ๎Ž๎Œ๎—๎–๎€ƒ๎„๎•๎ˆ๎€ƒ๎„๎๎–๎’๎€ƒ๎„๎™๎„๎Œ๎๎„๎…๎๎ˆ๎€ƒ๎‰๎’๎•๎€ƒ๎…๎’๎—๎‹๎€ƒ
๎—๎‹๎ˆ๎€ƒ๎€ถ๎—๎•๎„๎Œ๎Š๎‹๎—๎€ƒ๎„๎‘๎‡๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ฆ๎’๎•๎‘๎ˆ๎•๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€‘๎€ƒThe Kit includes a heat
shield, a PFL-12 (f/f) ๎ƒ€exible pipe, and a termination with or without
a mounting frame.
PEL-45 Elbow
PEL-90 Elbow
PXT-18
Heat Shield
Heat Shield
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€—
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€—๎…๎€‘ Rear Vented, wall mounted Multi-elbow termination installation.
Installation for H*38DF* must have a minimum vertical rise of 52".The vent run
must comply with the Venting Graph for Rear vent, wall mounted terminations,
Figure 14.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€—๎„. Straight run, Rear Vented, wall mounted termination for H*38DF*,
Figure 14.
30โ€ Max.
52โ€ Min.
18โ€
Max.
Flex or Rigid
Section
23 1/4โ€
Min.
28 3/4โ€
28 3/4โ€
PXT Extension
RHS101 Heat
Shield
Termination
Hearth
Exterior
Wall
๎€ฑ๎€ฒ๎€ท๎€จ๎€๎€ƒ
๎€”๎€›๎‚ต๎€ƒ๎€ฐ๎€ค๎€ป๎€‘๎€ƒ๎‹๎’๎•๎Œ๎๎’๎‘๎—๎„๎
๎•๎˜๎‘๎€ƒ๎š๎Œ๎—๎‹๎€ƒ๎‘๎’๎€ƒ๎™๎ˆ๎•๎—๎Œ๎†๎„๎๎€ƒ๎๎Œ๎‰๎—๎€‘
๎€”๎€›๎‚ต๎€ƒ๎€ฐ๎€ค๎€ป๎€‘
28 3/4โ€
18โ€
A
B
C
52โ€
48โ€
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€—๎€‘ Rear Vent Venting Graph for wall mounted terminations.
If your installation does not fall
within the venting graph parame-
ters, please contact a local Montigo
Dealer for Power Venting options.
๎€ฑ๎’๎—๎ˆ๎–๎€ƒ๎€บ๎„๎๎๎€ƒ๎€ฐ๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎€ท๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘๎–๎€๎€ƒRear Vent
๎‚„ All dimension lengths for vertical or horizontal runs are measured
from centre of the vent pipe.
๎‚„ Venting runs must fall within the limits set by the venting graphs,
see Figure 14.
๎‚„ Fireplace must be converted to Rear Vent con๎‚ฟguration prior to
running vent, see Figure 8 and 8a.
The Venting Graph
Measure the vertical height from the ๎‚ฟreplace hearth to the centre of the
termination and the horizontal run from the ๎‚ฟreplace ๎ƒ€ue collar to the wall
๎ƒ€ange of the termination. Plot on the Venting Graph Figure 14 with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the
installation is acceptable.
๎€จ๎›๎„๎๎“๎๎ˆ๎€ƒ๎€ค๎€๎€ƒ๎€‹๎€ค๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€Œ
If the vertical dimension from the hearth is 120" and the horizontal
run to the wall ๎ƒ€ange of the vent termination is 138", this would be
an acceptable installation.
๎€จ๎›๎„๎๎“๎๎ˆ๎€ƒ๎€ฅ๎€๎€ƒ๎€‹๎€ธ๎‘๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€Œ
If the vertical dimension from the hearth is 48" and the horizontal
run to the wall ๎ƒ€ange of the vent termination is 96", this ๎š๎’๎˜๎๎‡๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ
๎…๎ˆ๎€ƒ๎„๎‘๎€ƒ๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€‘
๎€จ๎›๎„๎๎“๎๎ˆ๎€ƒ๎€ฆ๎€๎€ƒ๎€‹๎€ธ๎‘๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€Œ
If the vertical dimension from the ๎ƒ€oor of the ๎‚ฟreplace is 72" and
the horizontal run to the wall ๎ƒ€ange of the vent termination is 120",
๎—๎‹๎Œ๎–๎€ƒ๎š๎’๎˜๎๎‡๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ๎…๎ˆ๎€ƒ๎„๎‘๎€ƒ๎„๎†๎†๎ˆ๎“๎—๎„๎…๎๎ˆ๎€ƒ๎Œ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€‘
Unacceptable vent run
within shaded area.
Acceptable vent run
within non-shaded area.
WARNING:
An inspection of the explosion relief ๎ƒ€appers and door
๎€ฐ๎€ธ๎€ถ๎€ท be made prior to lighting the ๎‚ฟreplace. Faulty seal
on the door gasket and/or explosion ports will result in
products of combustion leaking into the living space and
may result in carbon monoxide poisoning.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€˜
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ค๎€ƒ๎€๎€ƒ๎€ท๎ˆ๎•๎๎Œ๎‘๎„๎—๎Œ๎’๎‘ ๎€ณ๎€ท๎€ฒ๎€๎€—๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€–๎€…๎€ƒ๎€ฏ๎ˆ๎‘๎Š๎—๎‹๎€Œ
๎€ณ๎€ท๎€ฒ๎€๎€—๎€ฉ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€–๎€…๎€ƒ๎€ฏ๎ˆ๎‘๎Š๎—๎‹๎€Œ
๎€ณ๎€น๎€ท๎€ฎ๎€๎€”
๎€ฅ๎€ƒ๎€๎€ƒ๎€ฉ๎•๎„๎๎ˆ๎€ƒ๎€ฎ๎Œ๎—๎– ๎€ฐ๎€ถ๎€ต๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€ถ๎—๎˜๎†๎†๎’๎€ƒ๎€ฉ๎•๎„๎๎ˆ๎€Œ
๎€ฐ๎€ฒ๎€ถ๎€ต๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€ถ๎—๎˜๎†๎†๎’๎€ƒ๎€ฉ๎•๎„๎๎ˆ๎€Œ
๎€ฅ๎€ถ๎€ต๎€๎€—๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€—๎€…๎€ƒ๎€ฅ๎•๎Œ๎†๎Ž๎€ƒ๎€ฉ๎•๎„๎๎ˆ๎€Œ
๎€ฅ๎€ถ๎€ต๎€๎€™๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€™๎€…๎€ƒ๎€ฅ๎•๎Œ๎†๎Ž๎€ƒ๎€ฉ๎•๎„๎๎ˆ๎€Œ
๎€ฆ๎€ƒ๎€๎€ƒ๎€ฉ๎๎ˆ๎›๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎– ๎€ณ๎€ฉ๎€ฏ๎€ƒ๎€๎€ƒ๎€”๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€”๎€•๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ฉ๎€ฏ๎€ƒ๎€๎€ƒ๎€”๎€›๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€”๎€›๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ฉ๎€ฏ๎€ƒ๎€๎€ƒ๎€•๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€•๎€—๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ฉ๎€ฏ๎€ƒ๎€๎€ƒ๎€–๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€–๎€™๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ฉ๎€ฏ๎€ƒ๎€๎€ƒ๎€—๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€—๎€›๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ฉ๎€ฏ๎€ƒ๎€๎€ƒ๎€™๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€š๎€•๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ง๎€ƒ๎€๎€ƒ๎€ต๎Œ๎Š๎Œ๎‡๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎– ๎€ณ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€˜๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€˜๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€”๎€“๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€”๎€“๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€•๎€“๎€ƒ๎€ƒ๎€ƒ๎€‹๎€•๎€“๎€…๎€ƒ๎‰๎€’๎‰๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€จ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€”๎€ƒ๎€ƒ๎€ƒ๎€‹๎€”๎€•๎€…๎€ƒ๎‰๎€’๎๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€จ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€•๎€ƒ๎€ƒ๎€ƒ๎€‹๎€•๎€—๎€…๎€ƒ๎‰๎€’๎๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€จ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€–๎€ƒ๎€ƒ๎€ƒ๎€‹๎€–๎€™๎€…๎€ƒ๎‰๎€’๎๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€จ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€—๎€ƒ๎€ƒ๎€ƒ๎€‹๎€—๎€›๎€…๎€ƒ๎‰๎€’๎๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€ณ๎€จ๎€ป๎€ท๎€ƒ๎€๎€ƒ๎€™๎€ƒ๎€ƒ๎€ƒ๎€‹๎€š๎€•๎€…๎€ƒ๎‰๎€’๎๎€ƒ๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€Œ
๎€จ๎€ƒ๎€๎€ƒ๎€จ๎๎…๎’๎š๎– ๎€ณ๎€จ๎€ฏ๎€๎€œ๎€“๎€ฐ๎€ฐ๎€ƒ๎€ƒ๎€‹๎๎€’๎๎€ƒ๎€œ๎€“ยบ๎€ƒ๎€จ๎๎…๎’๎š๎€Œ
๎€ณ๎€จ๎€ฏ๎€๎€œ๎€“๎€ฉ๎€ฉ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€ƒ๎‰๎€’๎‰๎€ƒ๎€œ๎€“ยบ๎€ƒ๎€จ๎๎…๎’๎š๎€Œ
๎€ณ๎€จ๎€ฏ๎€๎€œ๎€“๎€ฉ๎€ฐ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€ƒ๎‰๎€’๎๎€ƒ๎€œ๎€“ยบ๎€ƒ๎€จ๎๎…๎’๎š๎€Œ
๎€ณ๎€จ๎€ฏ๎€๎€—๎€˜๎€ฉ๎€ฐ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€ƒ๎‰๎€’๎๎€ƒ๎€—๎€˜ยบ๎€ƒ๎€จ๎๎…๎’๎š๎€Œ
๎€ฉ๎€ƒ๎€๎€ƒ๎€ถ๎˜๎“๎“๎’๎•๎—๎€ƒ๎€ต๎Œ๎‘๎Š๎€ƒ๎€‰๎€ƒ๎€ณ๎๎„๎—๎ˆ ๎€ณ๎€ถ๎€ณ๎€ป๎€ท๎€๎€›
๎€ช๎€ƒ๎€๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎–๎—๎’๎“ ๎€ฉ๎€ถ๎€๎€›
๎€ซ๎€ƒ๎€๎€ƒ๎€ต๎’๎’๎‰๎€ƒ๎€ฉ๎๎„๎–๎‹๎Œ๎‘๎Š ๎€ณ๎€ต๎€ฉ๎€๎€š๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€”๎€’๎€”๎€•๎€ƒ๎€๎€ƒ๎€š๎€’๎€”๎€•๎€ƒ๎“๎—๎€‘๎€Œ
๎€ณ๎€ต๎€ฉ๎€๎€”๎€•๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€ƒ๎€‹๎€š๎€’๎€”๎€•๎€ƒ๎€๎€ƒ๎€”๎€•๎€’๎€”๎€•๎€ƒ๎“๎—๎€‘๎€Œ
๎€ฌ๎€ƒ๎€๎€ƒ๎€ซ๎ˆ๎„๎—๎€ƒ๎€ถ๎‹๎Œ๎ˆ๎๎‡๎€ƒ ๎€ต๎€ซ๎€ถ๎€”๎€“๎€”
๎€ญ๎€ƒ๎€๎€ƒ๎€ซ๎ˆ๎„๎—๎€ƒ๎€ช๎˜๎„๎•๎‡๎€ƒ ๎€ณ๎€ท๎€ฎ๎€ฒ๎€ช
Connection and installation of the vent components should
adhere to the following guidelines:
๎‚„ Montigo recommends the use of a ๎ƒ€ex section for the ๎‚ฟnal pipe
connected directly to the ๎‚ฟreplace offering greater ๎ƒ€exibility of
installation and absorption of movement.
๎‚„ Firestops must be installed as required by National & local codes.
๎‚„ Montigo recommends that all exterior corners and joints be sealed
with exterior caulking. However, we encourage you to consult
your Building Envelope Engineer or Waterproo๎‚ฟng Consultant
for further recommendations.
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€–๎€๎€•๎€ ๎€ƒ๎€น๎€จ๎€ฑ๎€ท๎€ฌ๎€ฑ๎€ช๎€ƒ๎€ฆ๎€ฒ๎€ฐ๎€ณ๎€ฒ๎€ฑ๎€จ๎€ฑ๎€ท๎€ถ
The following components and associated Montigo part numbers for
installation of a roof or wall mounted termination. ๎€ธ๎–๎ˆ๎€ƒ๎’๎‘๎๎œ๎€ƒ๎€ฐ๎’๎‘๎—๎Œ๎Š๎’๎€ƒ
๎€น๎ˆ๎‘๎—๎€ƒ๎€ฆ๎’๎๎“๎’๎‘๎ˆ๎‘๎—๎–๎€‘๎€ƒ Use of non-Montigo parts will ๎€น๎€ฒ๎€ฌ๎€ง the warranty
and may impede operation of the ๎‚ฟreplace.
๎‚„ Use any combination of rigid and ๎ƒ€ex pipe as required and in
any orientation (Male connectors can face in any direction).
๎‚„ Flex sections may be stretched up to 50% of their total length
(e.g. a 24โ€ section maybe stretched to 36โ€).
๎‚„ Connect all vent sections using a minimum of three sheet metal
screws on the outer pipe ๎ƒ€ue.
๎‚„ Ensure the pipe ends male to female slide in a minimum of 1
1/2โ€ of overlap.
๎‚„ Ensure all runs are supported with a minimum of 3 supports
per 10โ€™ of venting.
๎‚„ When hanging/ supporting venting, ensure that 1โ€ clearance
is maintained on sides and bottom of vent runs and 2โ€ above
horizontal vent runs to any combustible material.
๎‚„ Rigid pipe may be cut less than half way from the๎€ƒ๎‰๎ˆ๎๎„๎๎ˆ๎€ƒ๎ˆ๎‘๎‡๎€ƒ๎’๎‘๎๎œ๎€‘
๎‚„ Ensure when cutting sections of rigid pipe to maintain integrity
of internal supports.
๎‚„ Place the springs, supplied with the pipe kit, between the outer
and inner pipes to keep the pipes separate and avoid any
possible hot spots.
๎€ฌ๎€ฐ๎€ณ๎€ฒ๎€ต๎€ท๎€ค๎€ฑ๎€ท๎€๎€ƒ
๎€ณ๎๎ˆ๎„๎–๎ˆ๎€ƒ๎€ต๎ˆ๎‰๎ˆ๎•๎€ƒ๎—๎’๎€ƒ๎œ๎’๎˜๎•๎€ƒ๎€ฅ๎˜๎Œ๎๎‡๎Œ๎‘๎Š๎€ƒ๎€จ๎‘๎™๎ˆ๎๎’๎“๎ˆ๎€ƒ๎€จ๎‘๎Š๎Œ๎‘๎ˆ๎ˆ๎•๎€ƒ
๎’๎•๎€ƒ๎€บ๎„๎—๎ˆ๎•๎“๎•๎’๎’๎ƒ€๎‘๎Š๎€ƒ๎€ƒ๎€ฆ๎’๎‘๎–๎˜๎๎—๎„๎‘๎—๎€ƒ๎‰๎’๎•๎€ƒ๎„๎€ƒ๎•๎ˆ๎™๎Œ๎ˆ๎š๎€ƒ๎’๎‰๎€ƒ๎€ƒ๎€ค๎€ฏ๎€ฏ๎€ƒ
๎“๎ˆ๎‘๎ˆ๎—๎•๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎—๎‹๎•๎’๎˜๎Š๎‹๎€ƒ๎ˆ๎›๎—๎ˆ๎•๎Œ๎’๎•๎€ƒ๎š๎„๎๎๎–๎€ƒ๎’๎•๎€ƒ๎—๎‹๎ˆ๎€ƒ๎•๎’๎’๎‰๎€‘
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€™
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€–๎€๎€–๎€๎€–๎€๎€ƒ๎€ซ๎ˆ๎„๎—๎€ƒ๎€ถ๎‹๎Œ๎ˆ๎๎‡๎–
๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ๎„๎€ƒ๎€บ๎„๎๎๎€ƒ๎€ฐ๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎€ต๎€ซ๎€ถ๎€›๎€ƒ๎€ซ๎ˆ๎„๎—๎€ƒ๎–๎‹๎Œ๎ˆ๎๎‡
The RHS8 Heat shield ๎€ฆ๎€ค๎€ฑ๎€ฑ๎€ฒ๎€ท be used ๎€บ๎€ฌ๎€ท๎€ซ๎€ฌ๎€ฑ ๎€–๎€™๎€…๎€ƒ๎‹๎’๎•๎Œ๎๎’๎‘๎—๎„๎๎€ƒ๎’๎•๎€ƒ
๎€™๎€“๎€…๎€ƒ๎™๎ˆ๎•๎—๎Œ๎†๎„๎๎๎œ of the ๎‚ฟreplace, (see ๎‚ฟgure 15a). For applications within
these dimensions the RHS101 Heat Shield ๎€ฐ๎€ธ๎€ถ๎€ท be used. .
To install the RHS8, frame an opening in combustible construction,
Figure 15 below. Slide the Heat shield in place over the vent pipe
which attaches to the ๎‚ฟreplace. After the ๎‚ฟreplace and vent pipe has
been installed, clearances should match the dimensions in Figure 15.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€˜๎€‘ RHS8 Installation. (Install by sliding over vent pipe where it passes
through the combustible construction).
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€™๎€‘ RHS101 Installation. (Install by sliding Outer Section over vent pipe
where it passes through the combustible construction.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€™๎„๎€‘ Heat Shield. After sliding the outer section in place.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€˜๎„๎€‘ RHS8 Installation. (Minimum requirements).
๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ๎„๎€ƒ๎€บ๎„๎๎๎€ƒ๎€ฐ๎’๎˜๎‘๎—๎ˆ๎‡๎€ƒ๎€ต๎€ซ๎€ถ๎€”๎€“๎€”๎€ƒ๎€ซ๎ˆ๎„๎—๎€ƒ๎–๎‹๎Œ๎ˆ๎๎‡๎€‘
The RHS101 Heat shield ๎€ฐ๎€ธ๎€ถ๎€ท be used where the RHS8 Termination
(Figure 15 and 15a) ๎€ฆ๎€ค๎€ฑ๎€ฑ๎€ฒ๎€ท be used. Use the RHS101๎€ƒ๎š๎Œ๎—๎‹๎Œ๎‘๎€ƒ๎€–๎€™๎€…๎€ƒ
๎‹๎’๎•๎Œ๎๎’๎‘๎—๎„๎๎€ƒor๎€ƒ๎€™๎€“๎€…๎€ƒ๎™๎ˆ๎•๎—๎Œ๎†๎„๎๎€‘
To install the RHS101, Slide the Inner Section over the vent pipe that will
connect to the ๎‚ฟreplace. Fasten the vent pipe to the back of the ๎‚ฟreplace
with a Min. of three sheet metal screws.
Next, slide the RHS101 outer section from the outside of the structure,
see Figure 16.
To complete the installation fasten the Heat Shield Outer Section &
Termination frame to the structure Figure 16a.
RHS8 Heat Shield
1โ€ Min. Both sides Typical
1โ€ Min.
1โ€ Min.
Combustible Framing
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€™๎…๎€‘๎€ƒRHS101 Installation.
Outer Shield 10 1/4โ€
3/8โ€ Min. Both sides Typical
3/8โ€ Min.
3/8โ€ Min
.
Combustible Framing
12โ€ x 12โ€
Inner Shield 9 3/8โ€
Termination
Drywall / sheetrock
RHS101 Heat Shield, inner Section
RHS101 Heat Shield
Outer Section
Combustible
framing
Termination
Drywall / sheetrock
RHS101 Heat Shield, inner Section
RHS101 Heat Shield
Outer Section
Vent pipe, from fireplace
RHS8 Heat
Shield
36โ€ Min
60โ€ Min.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€š
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€—๎€๎€ƒ๎€บ๎Œ๎•๎Œ๎‘๎Š๎€ƒ
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€š๎€‘๎€ƒ๎€ƒWiring Diagram for the SIT Pro๎ƒ€ame Electronic Ignition
๎€ฐ๎’๎‡๎ˆ๎๎–
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€ฌ
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€ฌ
๎€ซ๎€ต๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€ฌ
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€ฌ
๎€ฐ๎’๎‡๎ˆ๎๎–
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€จ
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€จ
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€จ
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€จ
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฑ๎€จ
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฏ๎€จ
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€œ๎€‘๎€ƒ๎€ƒWiring Diagram for ๎€ซ๎’๎‘๎ˆ๎œ๎š๎ˆ๎๎๎€ƒgas control and pilot.
Honeywell (Q3450)
Pilot Assembly
Pilot Electrical
Harness Connector
Honeywell Gas
Control (SV9501M)
Gas Control
Connector
Junction Box
115VAC
24VAC
40 VA
Transformer
Black
White
Green
Gnd Screw
Wall Switch
Fan Plug
Receptacle
Manifold Pressure
Test Connection
Wall Switch
Power
Generator
Pilot Adjustment Screw
Inl
e
t Pr
essu
r
e
'Hi-Lo' Adjustment Knob
Gas Control Knob
(Shown in โ€œPilotโ€ position)
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€›๎€‘๎€ƒ Wiring Diagram for ๎€ถ๎€ฌ๎€ท๎€ƒ๎€ฑ๎’๎™๎„๎€ƒ๎€›๎€•๎€“ gas and pilot.
Orange
Green
Red
Black
880 Valve
Battery
Holder
4 x 1.5V
AA Type
Chassis
connection
120 Vac INPUT
7 Vdc STABILIZED
SUPPLY OUTPUT
ON / OFF
ON/OFF
IPI/CPI
BATTERY
DC SUPPLY
VALVE
GROUND
DFC
(CPI / IPI MODE
Not Used)
๎€ฐ๎’๎‡๎ˆ๎๎–
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ซ๎€–๎€›๎€ง๎€ฉ๎€ฏ
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ซ๎€ฏ๎€–๎€›๎€ง๎€ฉ๎€ฏ
๎€ซ๎€ต๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฑ
๎€ซ๎€บ๎€–๎€›๎€ง๎€ฉ๎€ฏ
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€›
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎Œ๎‘๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ธ๎€ถ๎€ค which employ the fans must be grounded in
accordance with local codes or, in the absence of local codes, with the
National Electrical Code, ๎€ค๎€ฑ๎€ถ๎€ฌ๎€’๎€ฑ๎€ฉ๎€ณ๎€ค๎€ƒ๎€š๎€“๎€‘
For more information see the ๎€ฉ๎„๎‘๎€ƒ๎€ฎ๎Œ๎—๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎€ƒ๎€ช๎˜๎Œ๎‡๎ˆ included with
the fan kit.
NOTE:
If any of the original wire supplied with the appliance
is replaced, it must be replaced with the same type,
or its equivalent.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€•๎€“๎€‘๎€ƒ Wiring diagram for optional fans.
G
L2-WH
L1-BLK
p g
Quick Connect
lu to motor
5/1/60 Supply
G L1 L2
๎€บ๎Œ๎•๎Œ๎‘๎Š๎€ƒ๎‰๎’๎•๎€ƒ๎—๎‹๎ˆ๎€ƒoptional๎€ƒ๎€ฉ๎„๎‘๎€ƒ๎€ฎ๎Œ๎—
All ๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€๎‚ฟreplaces may be equipped with optional fan kits for circulating
heat into the living space.
๎€ฌ๎‘๎–๎—๎„๎๎๎„๎—๎Œ๎’๎‘๎–๎€ƒ๎Œ๎‘๎€ƒ ๎€ฆ๎„๎‘๎„๎‡๎„ which employ the fans must be electrically
grounded in accordance with ๎€ฆ๎€ถ๎€ค๎€ƒ ๎€ฆ๎€•๎€•๎€‘๎€” Canadian Electrical Code
Part 1 and/or Local Codes.
๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ๎—๎‹๎ˆ๎€ƒ๎•๎ˆ๎๎’๎—๎ˆ๎€ƒ๎€ฒ๎‘๎€’๎€ฒ๎‰๎‰๎€ƒ๎€บ๎„๎๎๎€ƒ๎€ถ๎š๎Œ๎—๎†๎‹
The ๎€ซ๎€๎€–๎€›๎€ง๎€ฉ* gas valve may be connected to a wall switch. Do ๎€ฑ๎€ฒ๎€ท
connect any external power to the remote switch. The valve will
generate its own power on a millivolt circuit or will draw its power from
an AC Connection inside the ๎‚ฟreplace, depending on the model of the
unit. Use only low voltage wire, and ๎€ง๎€ฒ๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒconnect any external
power to the remote switch.
Refer to ๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€”๎€š๎€๎€ƒ๎€”๎€›๎€๎€ƒ๎’๎•๎€ƒ๎€”๎€œ๎€ƒfor wiring requirements.
๎€ฑ๎€ฒ๎€ท๎€จ๎€ The switch location must not exceed 30' from the ๎‚ฟreplace.
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€”๎€œ
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€˜๎€๎€ƒ๎€ฌ๎‘๎–๎—๎„๎๎๎Œ๎‘๎Š๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฏ๎Œ๎‘๎ˆ๎€ƒ
๎€ฑ๎’๎—๎ˆ๎€ After gas line is connected, ๎ˆ๎„๎†๎‹๎€ƒappliance connection๎€
valve and valve train must be checked while under normal
operating pressure with either a liquid solution, or leak
detection device, to locate any source of leak. Tighten any
areas where bubbling appears or leak is detected until
bubbling stops completely or leak is no longer detected.
๎€ง๎€ฒ๎€ƒ๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ๎˜๎–๎ˆ๎€ƒ๎„๎€ƒ๎ƒ๎„๎๎ˆ๎€ƒ๎’๎‰๎€ƒ๎„๎‘๎œ๎€ƒ๎Ž๎Œ๎‘๎‡๎€ƒ๎—๎’๎€ƒ๎—๎ˆ๎–๎—๎€ƒ๎‰๎’๎•๎€ƒ๎๎ˆ๎„๎Ž๎–๎€‘
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€•๎€”๎€‘๎€ƒ๎€ƒGas line access.
Gasline Access
0.87
5โ€ dia.
7โ€
to center
2โ€
๎‚„ The manifold outlet pressure is set from the factory to the
appropriate pressure but should be veri๎‚ฟed.
๎‚„ To check pressures, control valves have a provision to remove
a 1/8โ€ N.PT. plug to be ๎‚ฟtted with a hose barb.
๎‚„ Montigo requires a service shut off valve be located in an
accessible location to isolate the gas supply.
๎‚„ Only install gas shut-off valves approved for use by the state,
province, or other governing body in which the ๎‚ฟreplace is being
installed.
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€˜๎€๎€–๎€ ๎€ช๎€ค๎€ถ๎€ƒ๎€ฆ๎€ฒ๎€ฑ๎€ฑ๎€จ๎€ฆ๎€ท๎€ฌ๎€ฒ๎€ฑ
๎‚„ See Figure 21 for location of gas line access.
๎‚„ Flexible gas connectors must not exceed 3 feet in length, unless
allowable within local regulations.
๎‚„ Connect incoming gas line to the 1/2"or 3/8" gas inlet port.
๎‚„ Purge all air out of gas line.
๎‚„ Check appliance connection, valve and valve train under normal
operating pressure with a commercially available leak check
solution.
๎€ƒ๎‚„ ๎€ง๎€ฒ๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ๎€ธ๎€ถ๎€จ๎€ƒ๎€ค๎€ƒ๎€ฉ๎€ฏ๎€ค๎€ฐ๎€จ๎€ƒ๎€ฒ๎€ฉ๎€ƒ๎€ค๎€ฑ๎€ผ๎€ƒ๎€ฎ๎€ฌ๎€ฑ๎€ง๎€ƒ๎€ท๎€ฒ๎€ƒ๎€ท๎€จ๎€ถ๎€ท๎€ƒ๎€ฉ๎€ฒ๎€ต๎€ƒ๎€ฏ๎€จ๎€ค๎€ฎ๎€ถ๎€‘
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€˜๎€๎€”๎€ ๎€ฉ๎€ธ๎€จ๎€ฏ๎€ƒ๎€ฆ๎€ฒ๎€ฑ๎€น๎€จ๎€ต๎€ถ๎€ฌ๎€ฒ๎€ฑ
๎‚„ Verify that your ๎‚ฟreplace is compatible with your available gas
type. (Natural Gas or Propane shown by "N" or "L" in your
model number
๎‚„ If gas type is not compatible, contact your local Montigo
representative to purchase a conversion kit.
๎‚„ Conversion kits must be installed by a quali๎‚ฟed service technician.
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€˜๎€๎€•๎€ ๎€ช๎€ค๎€ถ๎€ƒ๎€ณ๎€ต๎€จ๎€ถ๎€ถ๎€ธ๎€ต๎€จ
๎‚„ Optimum appliance performance requires proper input pressures.
๎‚„ Gas line sizing requirements will be determined in ANSI Z221.3
National Fuel Gas Code in the USA and CAN/CGA B149 in
Canada.
Pressure requirements are:
๎€ช๎„๎–๎€ƒ๎€ณ๎•๎ˆ๎–๎–๎˜๎•๎ˆ ๎€ฑ๎„๎—๎˜๎•๎„๎๎€ƒ๎€ช๎„๎– ๎€ณ๎•๎’๎“๎„๎‘๎ˆ
๎€ฐ๎Œ๎‘๎Œ๎๎˜๎๎€ƒ๎Œ๎‘๎๎ˆ๎—๎€ƒ๎“๎•๎ˆ๎–๎–๎˜๎•๎ˆ ๎€˜๎€‘๎€˜๎Œ๎‘๎€‘๎€ƒ๎š๎€‘๎†๎€‘ ๎€”๎€”๎Œ๎‘๎€‘๎€ƒ๎š๎€‘๎†๎€‘
๎€ฐ๎„๎‘๎Œ๎‰๎’๎๎‡๎€ƒ๎“๎•๎ˆ๎–๎–๎˜๎•๎ˆ ๎€–๎€‘๎€˜๎Œ๎‘๎€‘๎€ƒ๎š๎€‘๎†๎€‘ ๎€”๎€“๎Œ๎‘๎€‘๎€ƒ๎š๎€‘๎†๎€‘
We recommend careful consideration be given to the effects of elevated mantel
temperatures which may be in excess of product design, for example: candles, plastic
or pictures. This can cause melting, deformation, discoloration or premature failure of
T.V. radio, and other electronic components.
CAUTION
When pressure testing the fireplace, Gas line, and input system follow the appropriate
local codes or your area. DO NOT connect the fireplace to pressures in excess of
1/2lb. This will damage the gas control valve.
NOTICE
๎€ณ๎„๎Š๎ˆ๎€ƒ๎€•๎€“
XG0147 - 011912.1
๎€ซ๎€๎€–๎€›๎€ง๎€ฉ๎€ƒ๎€ช๎„๎–๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Installation
๎€ถ๎ˆ๎†๎—๎Œ๎’๎‘๎€ƒ๎€™๎€๎€ƒ๎€ฉ๎Œ๎‘๎Œ๎–๎‹๎Œ๎‘๎Š๎€ƒ
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€•๎€•๎€‘ Combustible mantels and facings.
๎€ฉ๎Œ๎‘๎Œ๎–๎‹๎Œ๎‘๎Š๎€ƒ๎€ค๎•๎’๎˜๎‘๎‡๎€ƒ๎—๎‹๎ˆ๎€ƒ๎€ฉ๎Œ๎•๎ˆ๎“๎๎„๎†๎ˆ
Combustible mantels and mouldings may be safely installed over the
top and on the front of the ๎‚ฟreplace provided that they do not project
beyond shaded area shown in Figure 22.
Fireplace Facing
When sizing the ๎‚ฟnish material for your ๎‚ฟreplace, it is important to
remember the following: ๎€ท๎€ซ๎€จ๎€ƒ๎€ฒ๎€ณ๎€จ๎€ฑ๎€ฌ๎€ฑ๎€ช๎€ƒ๎€ฐ๎€ธ๎€ถ๎€ท๎€ƒ๎€ฑ๎€ฒ๎€ท๎€ƒ๎€ฅ๎€จ๎€ƒ๎€ฒ๎€ฅ๎€ถ๎€ท๎€ต๎€ธ๎€ฆ๎€ท๎€จ๎€ง๎€ƒ
๎€ฌ๎€ฑ๎€ƒ ๎€ค๎€ฑ๎€ผ๎€ƒ ๎€บ๎€ค๎€ผ๎€ƒ ๎€๎€ƒ ๎—๎’๎€ƒ ๎‡๎’๎€ƒ ๎–๎’๎€ƒ ๎•๎ˆ๎–๎—๎•๎Œ๎†๎—๎–๎€ƒ ๎—๎‹๎ˆ๎€ƒ ๎„๎Œ๎•๎€ƒ ๎–๎˜๎“๎“๎๎œ๎€ƒ ๎‰๎’๎•๎€ƒ ๎—๎‹๎ˆ๎€ƒ ๎†๎’๎‘๎—๎•๎’๎๎€ƒ
๎†๎’๎๎“๎„๎•๎—๎๎ˆ๎‘๎—๎–๎€ƒ ๎„๎‘๎‡๎€ƒ ๎‹๎ˆ๎„๎—๎€ƒ ๎ˆ๎›๎†๎‹๎„๎‘๎Š๎ˆ๎•๎€ƒ ๎Œ๎—๎€ƒ ๎„๎๎–๎’๎€ƒ ๎“๎•๎ˆ๎™๎ˆ๎‘๎—๎–๎€ƒ ๎„๎†๎†๎ˆ๎–๎–๎€ƒ ๎‰๎’๎•๎€ƒ
๎–๎ˆ๎•๎™๎Œ๎†๎Œ๎‘๎Š๎€ƒ๎†๎’๎‘๎—๎•๎’๎๎–๎€‘
The face of the ๎‚ฟreplace may be painted to match the room decor,
provided you use a heat-resistant paint. Decorative facing must not
extend past the ๎‚ฟreplace opening at all, because it will interfere with
the access to retainers for removal of glass door.
Mantels & Surrounds
๎€ฑ๎€ฒ๎€ท๎€จ๎€ National Canadian Gas Association mantel test requirements
are for ๎‚ฟre hazard prevention to combustible materials.
New technology, to meet consumer and government demands for the
wise use of energy, has prompted us to manufacture many models of
๎‚ฟreplaces which are hot, fuel and energy ef๎‚ฟcient.
Please be aware; temperatures over the mantel will rise above normal
room temperature and walls above ๎‚ฟreplace may be hot to touch.
We recommend careful consideration be given to the effects of elevated
mantel temperatures which may be in excess of product design, for
example: candles, plastic or pictures. This can cause melting, deformation,
discolouration or premature failure of T.V. and radio components.
๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€•๎€–๎€‘ Combustible surrounds.
Do not operate this fireplace without the glass door or with a broken glass door.
NOTICE
Do not use ammonia based or abrasive cleaners on the glass, they will permanently
etch the surface. Use an approved gas fireplace glass cleaner such as Kel-Kem or
White off.
NOTICE
Side wall clearances are 3". Combustible surrounds may be installed
with 3" clearance to the side of the ๎‚ฟreplace as shown in ๎€ฉ๎Œ๎Š๎˜๎•๎ˆ๎€ƒ๎€•๎€–.
WARNING!
When covering the upper metal portion of the ๎‚ฟreplace, (as shown,
Fig.22) with a non-combustible material ๎€ณ๎๎ˆ๎„๎–๎ˆ๎€ƒ๎€ฑ๎’๎—๎ˆ: The decorative
facing materials may be subject to temperatures in excess of 250ยฐ F.
This should be considered when selecting facing materials.
Non Combustible
Facing Material
Comubstible Header
Drywa
ll
/
Sheetrock
6โ€
3โ€
Top of fireplace
Combustible Facing
Material
Combustible
Construction allowed
in shaded area
Steel Stud construction allowable
within the grey-out area
Horizontal Run (in.)
Vertical Height (in.)
Nailing flange extension,
(supplied) or Non-combu-
stible Facing Material
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36

Montigo H38-DF Installation guide

Category
Fireplaces
Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI