Legrand WSA07-4AG, WallSource New Construction Box, WSA07-4A, WSA07-4ABK, WSA07-4AWH, WSA42-4 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Legrand WSA07-4AG Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Wiremold
®
Electrical Systems conform with, and should be installed and properly
grounded in compliance with requirements of the current National Electrical Code or
codes administered by local authorities. All electrical products may represent a possi-
ble shock or fire hazard if improperly installed or used.Wiremold electrical products are
UL listed, made for interior use and should be installed by qualified electrical profes-
sionals in conformance with current local codes and/or the National Electrical Code.
WallSource
New Construction Box
INSTALLATION INSTRUCTIONS
In Stud Construction
1. Install mounting brackets, included with
WSA42-4.
2. Attach to stud.
3. Pull wire and cable.
4. Install divider(s).
7. Snap on trim ring, included
with WSA07-4.
1. Cut opening in wall.
Install WSA42-4.
5. Install self-levelling WSA07-4 device
mounting bracket.
6. Mount devices.
2. Attach brackets to studs.
Continue with Step 3.
©1999 The Wiremold Company The Wiremold Company • 60 Woodlawn Street, West Hartford, CT 06110 • 1-800-621-0049 • Fax 860-232-2062 41675 199
For Retrofit Applications in Stud Construction:
/