1) PanelPreparationandInstallation
a. Removecoverandsetaside.
b. Reviewmountingsiteanddeterminethebestpositionformountingtheemp.2panel.
c. Thepanelshouldbemountedasclosetothecircuitwiringbeingmonitoredaspossible.
d. Thepanelistobemountedhighenoughsothattheconduitentrance(Figure1A)isviathebottom
ONLY.
e. Accessshallbeviatwo(2)orless,1inch(2.54cm)conduits(Figure1A).
f. DonotremovetheinteriorelectronicsandPCB.
g. Conduits toentervia thebottomofthe cabinetsonlyand belocatednolessthan1.5inches
(3.81cm),centerlinefromthebackofthecabinet.Useapieceofcardboardorwoodtoprotect
theinternalelectronicswhendrillingintothepanelfortheconduitentry.
h. Preferredmethodissealtightflexibleconduitandappropriateconnectorsandsupports.
i. Fourmountingbrackets(Figure1B)arelocatedonthebacksideofthecabinetandaretobeused
formounting.DONOTDRILLbackofthecabinet.
2) InteriorWiringfortheMonitoringandControl
Panel
emp.2PowerSource
a. Theemp.2isdesignedforresidentialenergymonitoring.
b. Thepowersourcefortheemp.2is240volts’singlephase
and is accessed by the host power panel being
monitored.
c. Thecircuitshallbea15amptwopolecircuitbreakerand
terminatedontheterminalblock(Figure1CandFigure
3H) at the lower left hand corner of the monitoring
controlpanellabeled“L1–N–L2“.

CTTerminationatemp.2
d. CT1and2terminals(Figure1D)aresetasidefortotalpanelkWmonitoring.TheCTitselfwillbe
attachedtotheincomingL1andL2inthepowerpanel.“L1”terminatedonCTterminal#1(CT1‐
L1).“L2terminatedonCTterminal#2(CT2L2).Careshouldbetakenwhensettingthesetwo
CTstopreservepolarity.ThearrowontheCTsidelabelshouldpointinthedirectionofthepanel
andcircuitbreakers.
e. CT3and4terminals(Figure1E)arepre‐designatedfor“Solar”monitoringifPVcellshavebeen
installed.Incomingpowerfromthesolarinverterwillbemonitoredatthesolarcircuitbreaker
ordisconnect.“L1”terminatedonCTterminal#3(CT3‐L1).“L2”terminatedonCTterminal#4
(CT4‐L2).
f. CT’s5thru8terminals(Figure3I)areformiscellaneousloadswithintheresidence,i.e.A/Cunits,
electricwaterheater,swimmingpoolpump,electricrange,oven,etc.Theseappliancesare
typically240volts,butlarge120voltloadsmayalsobemonitored.
g. AllappliancesmonitoredonCT5thruCT8willbemonitoredutilizing“L1phaseonly,theload
phase“L2”willnothaveaCT.
h. ItisessentialthatCTleadscanbe“tracked”fromtheemppaneltothecircuitpanelfortrouble
shooting.Therefore,allCTleadsshouldbelabeled(Figure1F)withtheappropriateCTnumber
everytwofeetandcareshouldbetakentolandeachCTleadatthecorrectterminalblock.
i. The CT has two wires, one black and one white (Figure 3J). The black wire will always be
terminatedontheleft‐handsideoftheterminalblockandthewhitewirewillbeterminatedon
theright‐handsideoftheterminalblock.
j. ChecktomakesurethatthelockingsnapontheCTistightlyclosedaftertheCTissetonthewire
beingmonitored.Pliersmayhavetobeusedtocompressthe
CTtosnapthelockshut.
D.I.P.SwitchSettings
k. TheD.I.P.switchsettings(Figure2G)mustbesettomatchthe
loadbeingmonitored.
i. Topsetting:UsethissettingwhentheCTislandedon“L1”
ofa240voltcircuit
ii. Second/middle setting: Use this setting when the CT is
landedon“L1”ofa120voltcircuit
iii. Third/bottom setting: Use this setting when the CT is
landedon“L2”ofa120voltcircuit
l. Seedetailsketchonwiringdiagram.
Phone: 602-606-7652
5235 South 39
th
Street e-Mail: [email protected]
Phoenix, AZ 85040 www.akida.com
RelayWiringand“Jumper”Setting
m. Therearetworelays(Relay#1and#2,Figure3K)atthebottomrightofthecontrolcabinet.Relay
#1ontherightandrelay#2ontheleft.Thepurposeoftheserelaysistoturnonoroffanynon‐
criticalloadbeingmonitored,suchasapoolpumpthatcanbede‐energizedforshortperiodsin
ordertominimizedemandchargesfromtheutility.
n. The relays canbecontrolledbyoneof two TARAS
modules(Figure3K)and the “Jumper”setting(J25
andJ26justbelowTARASModule8)determine
whichTARAScardwillcontroltherelay.Relay“R1”
can be controlled by TARAS module 5 or 6. Relay
“R2”iscontrolledbyTARASmodule7or8.Typically,
the factory setting for the jumpers will be 5 (for
Relay1)and7(forRelay2).
o. ItisessentialthattheJumperissetsuchthattheCT
for that TARAS Module is monitoring the same
circuitthatisroutedthroughtherelay.Forexample,
iftheJumperforRelay1issetto6thenCT‐6should
beonthesameloadthatiswiredthroughRelay1.
p. Wiringviatherelaysrequiresonelegoftheloadto
bewiredfromthecircuitbreakerthroughtherelay
terminals (not shown, but plug directly into the
relay)andbacktotheloadbeingcontrolled.Extend
thecircuitwiringusingappropriatelyratedwire as
necessary. Terminal connectors will have to be
crimpedontothewiringtoconnecttotheterminals
ontherelays.The“outsideterminalontherelay
should be used and the “middle” terminal is left
blank.
  • Page 1 1
  • Page 2 2
  • Page 3 3

Akida emp.2 Installation Instructions Manual

Type
Installation Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI