1.
2.
3.
4.
5.
Use a shifting cable with one inner cable drum.
SIS-SP (4 mm or 5 mm dia.)
Shifting lever end
Cassette joint end
Refer to the Service Instructions which are
provided with the Inter-8 shifting lever.
Note:
Make sure that the shield cap is at the shifting lever
end.
OK
Not OK Not OK
Use a new inner cable. Do not use a cable which
has had the end cut off.
Installation of the shifting
cable
Shifting lever side
Connect the shifting cable to the shifting lever.
Cassette joint side
1
Set the shifting lever to .
Install the rubber cover and rubber bellows to the outer
casing holder.
Wipe away any grease which may be on the inner
cable, and then pass the inner cable through the
rubber bellows. After this, insert the outer casing into
the rubber cover and set it into the outer casing holder.
Be careful of the inner cable end
While holding the end of the rubber bellows, insert
the inner cable. Be careful not to pierce the rubber
bellows with the end of the inner cable at this time.
1)
Slide the rubber bellows onto the inner cable.
2)
Shield cap
Set to
1
Rubber bellows
Outer casing holder
Rubber cover
End of rubber bellows Inner cable
Rubber bellows
Inner cable fixing nut
Inner cable fixing washer
Inner cable fixing bolt
Inner cable fixing bolt unit
Note: Do not use this inner cable fixing bolt unit
with the CJ-4S30 cassette joint.
127 mm
63 mm or less
Pass the inner cable through the hole.
Pull the inner cable while attaching
the inner cable fixing bolt unit.
After checking that the end of the outer casing is
sitting securely in the cable adjustment bolt of the
shifting lever, attach the inner cable fixing bolt unit to
the inner cable.
Tightening torque:
4 – 6 Nm {40 – 60 kgfcm}
10 mm
(Black)
Push the outer casing on so that it securely touches
the outer casing holder.
3)
Outer casing holder
Rubber cover
Rubber bellows
Inner cable
Outer casing