Arctek 80TPC Operating instructions

Type
Operating instructions

This manual is also suitable for

10110 ZINS-9A006-00
1
Change lever handling if required; please follow
instructions below.(LHR as preset)
2
Prepare door for lever control installation. Transfer the vertical
and horizontal center lines from inside (exit device side) of the
door to outside (trim side) of door. Use extra care if the end
of the door is beveled.
3
Install lever control with exit device.
Lever in
LHR
position
Lever in
RHR
position
FIGURE REPRESENTS
LEFT HAND REVERSE DOOR
RHRLHR
EDGE OF DOOR
DRILL THIS HOLE FOR CLASSROOM /
STOREROOM FUNCTION ONLY
6/8" (19.1mm) DEEP FOR WOOD DOOR.
EDGE OF DOOR
DRILL THIS HOLE FOR CLASSROOM /
STOREROOM FUNCTION ONLY
6/8" (19.1mm) DEEP FOR WOOD DOOR.
6/8" (19.1mm) DEEP FOR WOOD DOOR.6/8" (19.1mm) DEEP FOR WOOD DOOR.
  • Page 1 1
  • Page 2 2

Arctek 80TPC Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI