LocknCharge 10318 Quick start guide

  • Hello! I am an AI chatbot trained to assist you with the LocknCharge 10318 Quick start guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
QUICK START
What’s required?
FUYL Tower 5 Network Kit
x5
x5
x1x1*
*Network hub not included. Note: The customer supplied
hub requires a minimum of 7 ports.
** Supplied with the FUYL Tower 5.
30cm
x1**
E5
x1
1-5
1
2
Disconnect the pre-installed ethernet cable from the internal RJ45
port at the rear of the FUYL Tower only.
Place your network hub (not included) inside the top shelf,
behind the control door.
3
4
E5
i. Remove blanking plate and replace it with the RJ45 port plate.
ii. Fix it in place with the locating screw.
i. Route the hubs power cable through the rear hole to a power outlet.
ii. Connect the network hub to the rear internal RJ45 port using the “E5”
ethernet cable.
www.lockncharge.com (International)
www.pclocs.com.au (Australia and New Zealand)
5
6
x5
x5
E5
30cm
i. Connect all 5 shelves (RJ45 ports) to the network hub with the
numbered ethernet cables.
ii. Reconnect the pre-installed ethernet cable from the control door to the
network hub.
Plug the 30cm ethernet cables to the RJ45 port inside each shelf.
Network kit setup for the FUYL Tower 5 is complete.
1-5
/