MyBinding Best-Rite 311AF Assembly Instruction

  • Hello! I am an AI chatbot trained to assist you with the MyBinding Best-Rite 311AF Assembly Instruction. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Best-Rite 4' x 5' Vin-Tak
Vinyl Covered Tackboard
Bulletin Board
Instruction Manual
Which board assembly instructions should you use?
Use L-Clip instructions for...
Use Z-Clip instructions for...
Ultra Trim
Presidential Trim
31 Trim
Euro
Trim
Scroll down for instructions.
ABC Trim
Aluminum Trim
Deluxe Wood Trim
48 Trim
3/4
Determine board location. Measure from floor to
the top edge of board. Mark with pencil line the
corner location. Measure down from top edge of
board 3/4”, and draw line as shown. Locate stud
near each end of board and drill pilot hole along line
using 1/8” drill bit.
Lift, Tilt, and Slide
Board down over the
Z-Hangers.
Z-Hangers should
catch in the top trim on
the back of the board.
Draw line along
bottom edge of board.
Secure board to bottom
brackets (F) using 2 short
screws (B) as shown.
Attach Z-Hangers (E) using Long Screws (A)
as shown.
Board Location
Board Location
Top Edge
of Board
Wall Stud
Draw line
Z Brackets hang in
the trim on back of
board
1
1
8
Lift and remove board from the Z-Hangers.
Measure up from bottom line of board 1-1/8”, and
draw line as shown. Locate stud near each end of
board and drill pilot hole along line using 1/8” drill bit.
Draw line
Board Location
Bottom Edge
of Board
Drill Hole
Secure 2 bottom brackets (F) to the wall using 2
long screws (A) as shown.
Hang board on the Z-Hangers (E).
Hardware List
A Long Screw
B Short Screw
C Screw Anchor - Concrete
D Screw Anchor - Drywall
E Z Hanging Bracket
F Bottom Bracket
P1 Board
Parts List
Z Clip Install_05-29-13
(For Drywall)
(For Concrete walls)
E
A
P-1
P-1
F
A
P-1
B
F
Z Clip Install
Note:
Install Masonry Anchors (D) into 1/4”
Diameter predrill holes for masonry
walls.
Install Drywall Anchors (E) into 1/4”
Diameter predrill holes for sheet rock
walls.
E
D
1.
2.
3.
4.
5.
6.
Z Clip Install Instructions
1
1
1
4
1
2
3
4
5
6
Determine board location. Measure from floor to
the bottom edge of board. Mark with pencil line the
corner location. Measure up from bottom edge of
board 1-1/4” and draw line as shown. Locate
stud near each end of board and drill pilot holes
along line using 1/8” drill bit.
Set board on the Angle
Brackets. Draw line along
top edge of board.
Attach ½ the # of Angle Brackets using
Long Screws (B) as shown.
Board Location
Board Location
Bottom Edge of Board
Wall Stud
Draw line
Lift and remove board from
the angle brackets. Measure down
from top line of board 1” and draw line
as shown. Locate stud near each end of
board and drill pilot hole along line using
1/8” drill bit.
Draw line
Board Location
Top Edge of Board
Drill Holes
Secure top Angle Brackets (A) to the wall using
long screws (B) as shown. Follow diagram in
Step 1. Set board on the bottom angle brackets.
Hardware List
A Angle Bracket
B Long Screw
C Short Screw
D Screw Anchor-Concrete
E Screw Anchor-Drywall
P1 Board
Parts List
L Clip Install_12-12-14
Secure board to bottom and
top brackets (A) using short
screws (C) as shown.
Equally
Spaced
L Clip Install
Note:
Install Masonry Anchors (D) into 1/4”
Diameter predrill holes for masonry
walls.
Install Drywall Anchors (E) into 1/4”
Diameter predrill holes for sheet rock
walls.
E
D
3”
16” min.
24” max.
Edge of
Board
Angle Bracket Locations on Board
Angle
Bracket
Edge of
Board
See diagram below.
L Clip Install Instructions
Attention
Please read and follow these instructions!
Failure to follow these instructions will
void your warranty and could result in
board failure and possible injury.
1. Always use the correct supplied mounting hardware for
the type wall your board will be mounted on.
2. Use the correct stated predrill for the type anchor you
will be using.
3. The Angle Brackets and Z Clips be installed
according to the layout and spacing as shown below.
MUST
L-Clip_09-08-15
NOTE: For more information, please refer
to our web-site:
www.partsandinstructions.com
WWW.MYBINDING.COM
Your top and bottom L-Clip
layouts should be spaced like
this for an 8’ wide board.
If you don’t use this number of
L-Clips on top and bottom, your
board could end up like this. Please
follow these installation directions.
Proper L-Clip Layout
/