©2016 Aladdin Commercial
|
www.aladdin-commercial.com
|
1-800-2MOHAWK©2016 Aladdin Commercial
|
www.aladdin-commercial.com
|
1-800-2MOHAWK
Modular Carpet Tile Installation
Carpet Installation Check off List
1. Newlypouredconcreteoorsgenerallywilltake30daystocure.Moistureshouldnotexceed
5lbs./1000sfper24hoursor80%relativehumidityasdeterminedbycurrentASTMstandards.Iftheresultsare
morethan5lbsorhigherthan80%RH,donotproceedwiththeinstallation.Gypcreteorsubstrateswithexcessive
dustmustbecleaned,andthenprimedwithanapprovedprimer,suchasalatexmilkadditive.
2. ThealkalinityorpHinaconcreteslabshouldbebetween5and9foraglue-downinstallation.
3. Theoorandroomtemperaturemustbeacclimatedbymaintainingthetemperatureat65°Fand85°F,andthe
humiditybetween30%and65%,foratleast48hoursbeforeandduringinstallation.Inaddition,thecarpetand
adhesiveshouldbestoredundertheseconditionsforatleast24hoursbeforeinstallation.Theinstallationsite
mustbeacclimatedwithHVACinoperation.
4. Whentheinstallationiscomplete,thejobsitemustbemaintainedatnormalservicetemperatureandhumidity.
5. Existingadhesivemustbeproperlypreparedpriortoanyinstallationofmodularcarpettile.
6. Mechanicallyremoveallwax,dirt,greaseandpaint.DONOTusesolventstocleantheoor.DONOTuseoilbased
sweepingcompounds.Fillcracksmorethan1/16”widewithaPortlandorcementbasedpatchingcompound.
Theoormustbeattowithin1/8”in10feet.Uselevelingcompoundwhenrequired.Patchedareasmayneedto
beprimed(consultpatchmanufactureforrequirements)withanapprovedprimer.DONOTinstalloverresinor
silicatebasedcuringcompounds.
7. Inspectallcarpetpriortocuttingandcontactyoursalesrepresentativebeforeinstallingthecarpetifyou
discoveranyproblems.Noclaimswillbeallowedforvisibledefectsafterthecarpethasbeencutandinstalled.
8. Nevercutcarpetovercarpetasthiscanresultinoverpenetrationofthebladeandcuttingloopsonthelowercarpet.
9. Carpetshouldbeprotectedfromheavytrafcandconstructiondustwithanon-stainingbuildingmaterialpaper.
Neveruseplasticsheetingasitwilltrapmoistureandpreventpropercuringoftheadhesive.Plasticmayalsoleave
residuesthatcanresultinrapidsoilingafterremoval.
10. Ifanyoftheaboveconditionsarenotattainable,contactAladdinCommercialTechnicalServicesat888-387-9881.
Please Note
1. Asbestos-containingoortiles,anyadhesivepossiblycontainingasbestos,orotherasbestos-containingoor
coveringsrequirespecialpreparation,handling,andremovalprocedures.Consulttheappropriatelocalorstate
authoritiesortheResilientFloorCoveringInstitutebeforedisturbinganysuspectedasbestos-containingmaterial.
2. Installationofmodularcarpettileonaooroutsidethescopeoftheguidelinesinthisdocumentwillvoidall
applicablewarranties.
3. Mohawkisnotresponsibleforanyproductfailureduetoimproperoorpreparationand/orinstallation
procedures.TherequiredadhesivesareMohawkGroup’sfamilyofadhesives.
4. Wheninstallingcarpettilesoverraisedaccessoorpanels,startinstallationbyoverlappingtheaccesspaneljoints
topreventtheseamsofthetilesfromliningupwiththeaccesspaneljoints.Additionally,allaccesspanelsshould
besound,levelandedgesrmlysecuredtotheraisedooringpedestals.