Enwork Proxi 2.0 & Proxi Plus Installation guide

  • Hello! I've reviewed the Proxi 2.0 Hinging Trough Installation Guide and I'm ready to help with your questions about it. The guide details the installation process, including mounting the trough, attaching the included power strip and managing your cables. Feel free to ask me anything about the installation process or the device itself.
  • What is included in the package?
    How do I attach the power strip inside the trough?
    How should I manage the cords?
Proxi Wire Trough
Installation Guide
TI0044
Proxi 2.0 Hinging Trough Installation Guide – Rev 08.29.22
2
1 – Included Parts and Fasteners
Trough
#10x 1” Panhead Phillips (8x)
Bracket Hooks (2x)
#8 x 34” Pan Head Phillips (8x)
3” x ¾” Velcro Strip Power Strip
2 – Tools and Supplies Required
Power Drill #2 Square Bit Phillips Bit
3
Remove the lm on one side of the Velcro strip and
adhere it to the bottom of the power strip, pressing
rmly.
Remove the lm on the other side of the Velcro strip and
place the power strip in the trough, pressing rmly, as
shown in Figure 3.2
Loosely install the bracket hooks to the trough (2x).
3 – Assembly
1
2
3
Figure 3.1
Figure 3.3
Figure 3.2
4
Using the screws provided, secure the rear of
both bracket hooks (2x).
Note: Use the correct length screw depending on the top
thickness.
Remove the lm on one side of the Velcro strip and
adhere it to the bottom of the power strip, pressing
rmly.
Open the trough and secure the bracket hooks with
the rest of the screws provided (6x).
Note: Make sure the hook opening and hook are
aligned in the front of the trough before securing, as
shown in Figure 3.6.
3 – Assembly
5
4
6
Figure 3.5
Figure 3.4
Figure 3.6
5
Extra slack/cord bundles can be wrapped
around the bracket hooks.
Begin to organize the cords. Single cords
can be managed with the integrated wire
management clips in the base.
Or extra slack/cord bundles can be zip-tied to the
bracket hooks.
3 – Assembly
8
7
9
Figure 3.8
Figure 3.7
Figure 3.9
6
Enjoy!
Begin to organize the cords. Single cords
can be managed with the integrated wire
management clips in the base.
3 – Assembly
11
10
Figure 3.11
Figure 3.10
1.800.815.7251
enwork.com
12900 Christopher Dr. Lowell, MI 49331
Specications subject to change without notice.
Rev 08.29.2022
/