Argos Yani 606/9234 Assembly Instructions Manual

Type
Assembly Instructions Manual
Assembly InstructionsPlease keep for future reference
ImportantPlease read these instructions fully before starting assembly
If you need help or have damaged or missing parts, call the Customer Helpline: 0345 6400 800
Issue 1 - 27/09/16
Yani 4'4'6"and 5' Bed to Go
Dimensions (4')
Length - 201cm
Width - 129cm
Height - 105cm
Dimensions (4'6)
Length - 201cm
Width - 144cm
Height - 105cm
Dimensions (5')
Length - 211cm
Width - 159m
Height - 105cm
616/7129
606/9234
619/3571
621/9204
622/6242
621/7828
Safety and Care Advice
Important – Please read these instructions fully before starting assembly
1
Care and maintenance
• Only clean using a damp cloth
and mild detergent, do no use
bleach or abrasive cleaners.
• From time to time check that
there are no loose screws on
this unit.
• This product should not be
discarded with household
waste. Take to your local
authority waste disposal centre.
• Check you have all the
components and tools listed on
pages 2 and 3.
• Remove all fittings from the
plastic bags and separate them
into their groups.
• Keep children and animals
away from the work area, small
parts could choke if swallowed.
• Parts of the assembly will be
easier with 2 people.
• Make sure you have enough
space to layout the parts before
starting.
• Assemble the item as close
to its final position (in the same
room) as possible.
• Dispose of all packaging
carefully and responsibly.
• Place the product on flat and
steady surface during use.
• Assemble on a soft level
surface to avoid damaging the
unit or your floor.
• Keep these instructions for
further use.
• To ensure an easier assembly,
we strongly advise that all
fittings are only finger tightened
during initial assembly. Only
upon completion of the
assembly should all fixing points
be fully tightened.
Please check you have all the parts listed below
Components - Parts
Headboard panel ( 4'- 128 x 64cm ) ( 4'6- 143 x 64cm ) ( 5'- 158 x 64cm)
Footboard (4'- 128 X 68.5cm)(4'6- 143 X 68.5cm) (5'- 158 x 68.5cm )
1
Slat (Thread each end) x 4 (4'- 127 X Ø1.9cm) (4'6- 142.1 X Ø1.9cm) (5'- 157.1 x Ø1.9cm)
5
6
Side rail x 2 (4'- 98.4 x 10cm ) (4'6- 98.4 x 10cm) (5'- 103.4 x 10cm)
3
Slat x 8 (4'- 127 X Ø1.9cm) (4'6- 142.1 X Ø1.9cm) (5'- 157.1 x Ø1.9cm)
8
Headboard post x 2
(45.5 x Ø3.2cm)
2
Side rail x 2 (4'- 98.4 x 10cm) (4'6- 98.4 x 10cm) (5'- 103.4 x 10cm)
4
Finial x 4
(Ø5.2cm)
9
Support leg x 2
(29.3 x 7cm)
7
2
Central support x 2
(87.6 x Ø1.9cm)
10
Support leg x 4
(28.7 x Ø1.9cm)
11
Components - Fittings
A
Rubber washer x 8
Please check you have all the fittings listed below
Note:
The quantities below are the correct amount to complete the assembly. In some cases more
fittings may be supplied than are required.
Plain washer x 12
Allen key x 2
If you have damaged or missing components,
call the Customer Helpline: 0345 6400 800
B
C
D E F
27mm Allen screw x 4
Nut x 4
25mm Allen screw x 12
G
13mm Allen screw x 12
3
55mm Allen screw x 4
H
Ruler - Use this ruler to help correctly identify the screws
0
5
10 15 20 25 30 35 40
45
50
55
60 65 70
75
80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170
Tools required
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150
1 2 3 4 5 6
Ruler/tape
measure
Step 1
Assembly Instructions
Assembling posts
Place headboard panel
face down onto a
clean flat surface.
Note:
Fixing holes for
posts should be facing
up.
Secure headboard posts
to headboard panel
using fixings
and .
A
2
1
B
1
4
Step 2
Assembling side rails
A
4
3
3
4
A
Assemble side rails
and together using
screws .
Repeat for the other side
rail.
Step 3
Assembling slats
Assemble slats to
one side rail only, using
screws .
Note:
Slats have a
thread in each end.
3
4
5
5
A
C
C
5
3
C
4
3
5
5
5
5
1
A
B
2
A
B
2
Front
Back
1
Step 4
5
Step 5
Assembling slats
With help, locate the
remaining side rail onto
the ends of the slats.
Secure using screws
as shown.
C
Assembling slats
Locate slats into
the remaining holes in
the side rail.
Note:
Slats have no
threads in the end and
do not require fixing.
6
6
C
3
4
6
6
6
6
6
6
6
6
3
4
Assembly Instructions
Step 6
6
AssemblingAssembling side rails
a: With help, assemble
side rails to the
headboard using fixings
, , and .
b: Assemble footboard
to the side rails using
fixings , and .
c: Assemble support leg
to the underside of
the side rail using screws
.
Repeat on both sides.
d: Screw finials into
the headboard and
footboard corner posts.
B
D E
F
8
B
C E
7
A
9
B
8
3
E
C
A
7
B
D
F
E
4
2
a:
b:
c:
7
A
c:
Assembly Instructions
4
3
F
B
D
E
9
d:
a:
C
B
E
b:
8
1
Assembly Instructions
Step 7
Assembling slat
supports
Assembly is complete.
If you need help or have damaged or missing parts, call the Customer Helpline: 0345 6400 800
Home Retail Group. 489-499 Avebury Boulevard. Saxon Gate West. Central Milton Keynes. MK9 2NW
7
G
10
5
6
11
Assemble central
supports and support
legs through slats
using screws .
Note:
Central supports
fit underneath the
slats.
10
10
11
G
5
10
5
5
5
5
11
11
G
G
G
G
11
11
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

Argos Yani 606/9234 Assembly Instructions Manual

Type
Assembly Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI