RJ4B

Construction Metals RJ4B, RJ7B, SJ4G, SJ7G Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Construction Metals RJ4B Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
#RJ3FHA-SP
1. Shingle up to the roof penetration. 2. Position T-Top ashing over the vent pipe.
3. Secure ange with 6 roong nails. 4. Continue shingling above the vent pipe.
T-TOP PIPE FLASHING
INSTALLATION GUIDELINES
These basic installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed
professional, and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
/