Construction Metals RJ4B Operating instructions

Type
Operating instructions

This manual is also suitable for

#RJ3FHA-SP
1. Shingle up to the roof penetration. 2. Position T-Top ashing over the vent pipe.
3. Secure ange with 6 roong nails. 4. Continue shingling above the vent pipe.
T-TOP PIPE FLASHING
INSTALLATION GUIDELINES
These basic installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed
professional, and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
  • Page 1 1

Construction Metals RJ4B Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI