54
First shut off your water heating system, then with your mains stop cock closed, open the
lowest cold and hot taps in the house and allow to run until the cold storage tank and
pipes are empty (the hot storage cylinder always remains full).
Fitting isolating valve to inlet feeds is recommended for ease of maintenance.
INSTALLATION
Note: Remember to turn off mains water supply before connecting to any existing pipe work.
1: Install the main body:
a) Fit the “O” ring into the groove on the underside of the tap body.
b) Screw the
fixing bolt
and the flexible hoses into the mixer body, and fully hand tighten.
c) Pass the tail of flexible pipes through the hole on the bidet from above, and place the
mixer in position on the bidet, to see if any alteration to the existing supply pipe work is
necessary. Make any necessary alterations to the pipe work if needed.
d) Tighten the rubber washer, the brass washer with the
fixing nut
from the under-side
of the bidet.
Check that the mixer body is correctly positioned, fully tighten the
fixing nut
.
e)
Connect the water supply pipes to the tails of the flexible hoses for the hot water and cold water.
2: Pop-up waste
a) Insert the pop-up waste lever into the slot at the back of the mixer body.
b) From the underside of the bidet screw the pop-up waste lever into the control rod extension.
c) Assemble the pop-up waste to the bidet, with the foam washer on top and the
rubber washer
below and hand tighten.
d) Push the body washer into the body of the pop-up waste, prepare the horizontal control rod
by sliding on the retainer washer and ball joint retainer making sure the cup part of the
retainer washer will sit around the ball. Slide the control rod link onto the vertical control
rod and then onto the horizontal control rod.
e) Insert the short end (with ball) of the horizontal control rod into the body (the horizontal
control rod can be slid through the control rod link) and clamp to the body with the ball
joint retainer. Do not over tighten.
f) Test the action of the pop-up waste and fully tighten the control rod link. Adjust the ball
joint retainer if required.
Beautifully
Traditional
INSTALLATION INSTRUCTIONS
www.arcadebathrooms.com
Tap Body
Hose
“O” Ring
Fixing Bolt
Rubber Washer
Brass Washer
Fixing Nut
Spanner
Pop-up waste lever
Arcade single lever bidet mixer
with pop up waste
ARC13, ARC13 CHR
ATTENTION
Having first checked all new connections, turn on the mains stop cock, close all
taps except the new taps and as the system starts to refill, check for leaks. Once you
have satisfied yourself that there are no leaks, switch on the water heating.
Ball
Plug
Bidet
Body
Vertical control
Rod extension
Control rod link
Horizontal control rod
Ball joint retainer
Retainer washer
Body
washer
Plug
adjustment
screw
Plug
housing
Foam
washer
Rubber
washer